Attachment E_Pricing Spreadsheet_Base Yr_Ti-Buffer.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Titanium Buffer Federal contract opportunity
- Solicitation number
- SP8000-20-R-0007
- Issued by
- Defense Logistics Agency
About this file
This pricing spreadsheet and solicitation are for a strategic titanium buffer to support defense needs. The spreadsheet contains pricing breakdowns for inventory holding and management line items for the base year and includes labor categories and rates, hours, other direct costs, profit, overhead and G&A, and total offered prices. The related solicitation seeks capability for expedited access to titanium alloys during wartime, operations, or contingencies through strategic buffers directly managed by qualified mills. The contractor must deliver minimum monthly quantities from the buffer and offer material through small minimum buy services. The Defense Logistics Agency issued the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment D - Ti Clauses and Provisions_Rev1.pdf | ||
| Attachment E_Pricing Spreadsheet_OPT 2.xlsx | XLSX spreadsheet | |
| Combined SynopsisSolicitation_Ti-Buffer-FY20.pdf | ||
| Attachment C_CLIN Structure_Ti-Buffer FY20.docx | DOCX document | |
| Attachment A_Instructions to Offerors.docx | DOCX document | |
| Attachment D_Ti Clauses and Provisions.docx | DOCX document | |
| Attachment E_Pricing Spreadsheet_OPT 1.xlsx | XLSX spreadsheet | |
| Attachment B_PWS Titanium Buffer.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ATTACHMENT E
PRICING BREAKDOWN SPREADSHEET FOR ITEM LINE ITEM 0001 – INVENTORY HOLDING PRICE
CLIN 0001 Labor Category Rate Hours TOTAL
Price associated with the cost for storing any material needed to support the buffer. It is anticipated that cost will include, facility space, material handling cost, preservation (if required), security provisions etc. Cost should be consistent with those used for commercial/non-Government or in internal cost used to support storage arrangements.
| Labor Category | Rate | Estimated Hours | TOTAL | |
| Other Direct Costs |
| Profit |
| Overhead/G&A |
| TOTAL OFFERED PRICE | $ | |
| PRICING BREAKDOWN SPREADSHEET FOR ITEM LINE ITEM 0002 – INVENTORY MANAGEMENT PRICE |
CLIN 0002 Labor Category Rate Hours TOTAL
Price associated with establishing and maintaining a system to track material that will be used to meet the requirements of the buffer. Typical systems will as a minimum track location, current state/form, quantity/weight and, sales activity and stock rotation status for material designated to support the buffer. The price also covers cost associated with reporting requirements and providing oversight to insure that prospective customers meet the requirements to use the buffer.
| Labor Category | Rate | Hours | TOTAL | |
| Other Direct Costs |
| Profit |
| Overhead/G&A |
TOTAL OFFERED PRICE $
PRICING BREAKDOWN SPREADSHEET FOR ITEM LINE ITEM 0003 – INVENTORY HOLDING PRICE
CLIN 0003 Labor Category Rate Hours TOTAL
Price associated with the cost for storing any material needed to support the buffer. It is anticipated that cost will include, facility space, material handling cost, preservation (if required), security provisions etc. Cost should be consistent with those used for commercial/non-Government or in internal cost used to support storage arrangements.
| Labor Category | Rate | Hours | TOTAL | |
| Other Direct Costs |
| Profit |
| Overhead/G&A |
| TOTAL OFFERED PRICE | $ | |
| PRICING BREAKDOWN SPREADSHEET FOR ITEM LINE ITEM 0004 – INVENTORY MANAGEMENT PRICE |
CLIN 0004 Labor Category Rate Hours TOTAL
Price associated with establishing and maintaining a system to track material that will be used to meet the requirements of the buffer. Typical systems will as a minimum track location, current state/form, quantity/weight and, sales activity and stock rotation status for material designated to support the buffer. The price also covers cost associated with reporting requirements and providing oversight to insure that prospective customers meet the requirements to use the buffer.
| Labor Category | Rate | Hours | TOTAL | |
| Other Direct Costs |
| Profit |
| Overhead/G&A |
TOTAL OFFERED PRICE $
&"-,Bold"&12&UPricing Breakdown Sheet
Sheet2
File details come from the government source that posted it. Updated .