RFP OregonBuys# S-63400-00002859 OPRD# 9086 – Attachment E
RESTORATION OF MCGIFFERT LOG LOADER AND 3 SKELETON RAIL CARS DAMAGED IN 242 FIRE
Attachment E - PRICE PROPOSAL FORM
Proposer's Business Name:
City, State:
PART I: PROPOSED TOTAL PRICE FOR THE PROJECT (SCORED)
INSTRUCTION: The Proposer proposes to furnish all material, equipment and labor, and perform all Services for OPRD, in strict accordance with the RFP, Attachment A -Sample Contract for Scopes, Specifications, Services, and other provisions incorporated in the RFP, on the basis of the lump sum or unit prices, or both. Proposed Total Price for the Project is inclusive of all labor, profit and expenses, and travel as follows:
| Work Item |
| Work |
| Estimated Quantity(ies) |
| Unit |
| Unit Price |
| Total Price per Deliverable |
| Work Item # 1 |
| Onsite Visit |
| 1 |
| Each |
| $ |
| $ |
| Disassembly, Loading and Moving Plan |
| 1 |
| Each |
| $ |
| $ |
| Work Item # 2 |
| Photo Documentation of the Equipment |
| 1 |
| Each |
| $ |
| $ |
| Work Item # 3 |
| Loading and Transportation of McGiffert and 3 Skeleton Rail Cars to Contractor's Facility |
| 1 |
| Each |
| $ |
| $ |
| Work Item # 4 |
| Detailed Assessment and Restoration Plan Development |
| 1 |
| Each |
| $ |
| $ |
| Work Item # 5 |
| Implementation of Restoration Work on McGiffert and 3 Skeleton Rail Cars |
| 1 |
| Each |
| $ |
| $ |
| Quarterly Progress Reports |
| 8 |
| Each |
| $ |
| $ |
| Virtual Meeting – walk thru, video detailing on progress/status |
| 8 |
| Each |
| $ |
| $ |
| Work Item # 6 |
| Loading, Transportation, Unloading, and Reinstallation of the Equipment into the Exhibit Site (including but not limited to all scaffolding, work trailer, power, etc.) |
| 1 |
| Each |
| $ |
| $ |
| Work Item # 7 |
| Project Documentations |
| 1 |
| Pack |
| $ |
| $ |
| Maintenance Plan for McGiffert and 3 Skeleton Rail Cars |
| 1 |
| Each |
| $ |
| $ |
| PROPOSED TOTAL PRICE FOR THE PROJECT |
| $ |
PART II: PROPOSER KEY PERSONS RATES (NOT SCORED)
INSTRUCTION: Proposer shall list title, roles and responsibilities; name; and fully loaded hourly rate of each Key Person below. Add additional lines if necessary.
| Title, Roles/Responsibilities |
| Name |
| Hourly Rate |
COMPLETE Detailed Breakdown of the Cost for PART I on following page(s) BREAKDOWN OF THE COST (NOT SCORED) for PART I INSTRUCTION: Proposer shall include a detailed breakdown of all labor and expenses per Work Item in blank lines below. Add additional lines as needed to enter detailed breakdown or leave/remove a blank line(s) if necessary. If Proposer wishes to submit this Breakdown of the Cost in a different format, such as in Excel, label the document as “Breakdown of the Cost Part I” and attach to this Attachment E - Price Proposal Form.
| Work Item |
| Description |
| Quantity(ies) |
| Unit Price |
| Total Price |
Safety Plan
Disassembly, Loading and Moving Plan
| 2 |
| Photo Documentation of the Equipment |
| 3 |
| Loading and Transportation of McGiffert and 3 Skeleton Rail Cars to Contractor's Facility |
| 4 |
| Detailed Assessment and Restoration Plan Development |
| 5 |
| Implementation of Restoration Work on McGiffert and 3 Skeleton Rail Cars |
Quarterly Progress Reports
Virtual Meetings – walk thru, video detailing on progress/status
| 6 |
| Loading, Transportation, Unloading, and Reinstallation of the Equipment into the Exhibit Site (including but not limited to all scaffolding, work trailer, power, etc.) |
Maintenance Plan for McGiffert and 3 Skeleton Rail Cars
| PROPOSED TOTAL PRICE FOR THE PROJECT |
| $ |