Attachment E - Performance Standards and Guarantees - FINAL.xlsm
XLSM spreadsheet 30 KB Posted
- Solicitation number
- ITB-13202
- Issued by
- Leon County, Florida
About this file
This document is an Attachment E - Performance Standards and Guarantees for an Indefinite Quantity Interior Painting contract (ITB No.: DMS-24/25-254) issued by the Department of Management Services (DMS) in Florida. The contract involves interior painting services with specific performance requirements, including moving and protecting existing furnishings, preparing surfaces, applying paint, and cleaning up work areas.
The performance standards outline precise expectations for contractors, with each requirement subject to a five percent invoice deduction for non-compliance. Verification will be conducted through visual inspections by the contractor and DMS Design Team, with deficiencies documented on Pre-Painting and Post-Painting Checklists. Failure to meet performance standards may also constitute a default under rule 60A-1.006 of the Florida Administrative Code, indicating strict adherence to contractual obligations is expected.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment E-Perf Stan & Guar
| ATTACHMENT E - PERFORMANCE MEASURES AND GUARANTEES | |||
| INDEFINITE QUANTITY INTERIOR PAINTING | |||
| ITB NO.: DMS-24/25-254 | |||
| Requirement | Guarantee | Measurement | Minimum Result of Noncompliance |
| Move existing furnishings to accomplish painting activities and return all furnishings to their original locations. | Pursuant to section 3.9.1 of ATTACHMENT A - STATEMENT OF WORK, the Contractor shall remove articles obstructing access to the surfaces included in the work, such as office furniture, files cabinets, tables, bookcases, etc., and restore such articles to their original position upon completion. | To be verified by visual inspection with Contractor and DMS Design Team and any deficiencies noted on Pre-Painting Checklist. | Five (5) percent deduction from invoice, per occurrence. |
| Provide protection to all public and private property. | Pursuant to section 3.10 of ATTACHMENT A - STATEMENT OF WORK - Protection of Areas, Furniture, and Equipment | To be verified by visual inspection with Contractor and DMS Design Team and any deficiencies noted on Post-Painting Checklist. | Five (5) percent deduction from invoice, per occurrence. |
| Prepare surfaces for painting. | Pursuant to section 3.11 of ATTACHMENT A - STATEMENT OF WORK - Preparation of Surfaces | To be verified by visual inspection with Contractor and DMS Design Team and any deficiencies noted on Pre-Painting Checklist. | Five (5) percent deduction from invoice, per occurrence. |
| Paint interior surfaces. | Pursuant to section 3.20 of ATTACHMENT A - STATEMENT OF WORK - Appliction of Paint | To be verified by visual inspection with Contractor and DMS Design Team and any deficiencies noted on Post-Painting Checklist. | Five (5) percent deduction from invoice, per occurrence. |
| Clean Up and removal and disposal of debris. | Pursuant to section 3.26 of ATTACHMENT A - STATEMENT OF WORK - Clean-Up and Disposal | To be verified by visual inspection with Contractor and DMS Design Team and any deficiencies noted on Post-Painting Checklist. | Five (5) percent deduction from invoice, per occurrence. |
*Please note that failure to perform may also constitute a default pursuant to rule 60A-1.006, Florida Administrative Code
File details come from the government source that posted it. Updated .