Attachment_E.pdf
PDF 106 KB Posted
- Attached to
- Artificial Reef - Tire Removal Project State and local contract opportunity
- Solicitation number
- 26-0349-RFP
- Issued by
- Pinellas County, Florida
About this file
This is a Progress Report form for the Marine Debris Tire Removal Project, a grant-funded initiative under project number NA24NOSX999C0002. The form is designed to track weekly project metrics and activities related to tire removal operations from artificial reef areas. The report captures key performance data including the number of tires removed in the previous week, dive hours logged, specific grid locations where work was performed, and total acreage cleaned. The form includes designated fields for project staff to document their progress and requires signatures from the personnel preparing the report, along with date documentation to establish a consistent weekly reporting schedule.
This Progress Report template serves as a monitoring and accountability tool for the marine debris removal project, enabling project managers to track operational efficiency and environmental restoration progress on a weekly basis. The structured format allows for systematic data collection across multiple metrics, which can be aggregated to demonstrate project achievements toward the removal of approximately 3,300 tires from five artificial reef areas off Pinellas County, Florida. The weekly reporting requirement ensures regular documentation of work conducted at the Clearwater, Rube Allyn, St. Pete Beach, Treasure Island, and Madeira Beach Artificial Reef locations, supporting compliance with grant objectives and providing transparent records of environmental remediation activities and resource expenditures throughout the twelve-month contract period.
View the file
Other files for this state and local contract opportunity
Show all 41
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment E – Progress Report
Weekly Project Status Report
Reporting Period Project Name Grant Project Number
(mm/dd/yy – mm/dd/yy) Marine Debris Tire Removal Project NA24NOSX999C0002
Project Update
Metrics
(Prepared By) (Date)
Signature
Number of Tires Removed (previous week)
Number of Dive Hours (previous week)
Grid(s) Where Work Was Performed
Acres Cleaned