Attachment Drawings.pdf
PDF 29 MB Posted
- Solicitation number
- 36C26125R0044
About this file
These are architectural drawings and technical specifications for the VA Southern Nevada Healthcare System's project to replace the roof of Building 1, located at 6900 N. Pecos Road in North Las Vegas, Nevada. The project involves comprehensive roof remediation across multiple roof areas totaling 243,663 square feet, encompassing sections for main hospital, administration, emergency department, mental health, specialty clinics, auditorium, and warehouse zones. The roof replacement will address deteriorating conditions, water intrusion, and system failures through a multi-step process including surface cleaning, penetration area repairs, and full roofing replacement in critical sections, with a final application of a two-ply polyurethane-based roofing system.
The project scope includes detailed documentation of roof areas by level, with specific attention to mechanical overruns, elevator overruns, and stair overruns. Technical specifications mandate a pre-bid walkthrough, infrared scanning to identify wet insulation areas, and comprehensive repair strategies. The construction documents indicate the roof is part of a Type II, fully sprinklered hospital building, with work to be performed in compliance with VA design standards, NFPA codes, and other federal construction regulations. The project is part of solicitation number 36C26125R0044, with the primary objective of resolving roof degradation and preventing further water-related damage to the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26125R0044 0004.docx | DOCX document | |
| RFI Q-A Response 7-17-2025.pdf | ||
| 36C26125R0044 0003.docx | DOCX document | |
| 36C26125R0044 0002.docx | DOCX document | |
| 36C26125R0044 0001.docx | DOCX document | |
| Site Visit Sign-in Form 06-24-2025.pdf | ||
| Attachment SOW 03-14-2025.pdf | ||
| 36C26125R0044_1.docx | DOCX document | |
| Attachment Price Breakdown.xlsx | XLSX spreadsheet | |
| Attachment REQUEST FOR INFORMATION FORM.pdf | ||
| Attachment Wage Determination NV20250038 05-02-2025.pdf | ||
| Attachment Pre-solicitation Site Visit Presentation.pptx | PPTX presentation | |
| Attachment Specifications.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
COMPACT
CO MPACT
CO MPACT
CO MPACT
CO MPACT
CO MPACT
V A N
V A N
V A N
V A
N
V A N
V A N
V A N
V A N
V A N
V A N
C
F
L
N
M
P
E
H
S
A
B
A .2
S.2N P e c o s R d
E Deer Springs Way
J
N
BLDG. 7
BLDG. 6
BLDG. 5
BLDG. 2
BLDG. 3
BLDG. 4
C.2
E.2
S.3
H.3
H.2
S.4
FISHER HOUSE
BUILDING 1
NOT IN SCOPE
SITE LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
DESIGN TEAM
OWNER
ARCHITECT / CONTRACT PRIME
BUILDING ENCLOSURE
STRUCTURAL / MECHANICAL /
ELECTRICAL / PLUMBING / FIRE
PROTECTION ENGINEER
VA Southern Nevada Health System 6900 N. Pecos Rd.
North Las Vegas, NV 89086 Contact: Alfred Pulido (COR)
Alfred.Pulido@va.gov
(702) 217.9474
Leah Elmquist (Alt COR) Leah.Elmquist@va.gov
Awen Solutions Group 4196 Merchant Plaza Woodbridge VA 22192 Contact: Peter Matthews, AIA, NCARB, LEED AP pmatthews@awensolutions.com
(310) 804.1170
Coffman Engineers, Inc.
701 Corporate Center Drive Raleigh, NC 27607 Contact: Jeff Grove jeff.grove@coffman.com
(725) 465.8859
Gresham Smith 620 S. Tryon St., Suite 500 Charlotte, NC 28204 Contact: Robert Barfield robert.barfield@greshamsmith.com
(980) 308.9644
A u to d e s k D o c s /D e s ig n R e p la c e
R o o f
B u ild in g
/5
-2
-3
.0
.A
.L V
.r v t
/7
/2
:1
:4
P M
GI001
COVER SHEET
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
02/07/2025
REPLACE ROOF FOR
BUILDING 1 BLDG 1
6900 N. PECOS ROAD,
NORTH LAS VEGAS, NV 89086
593-24-302
VA SOUTHERN NEVADA HEALTHCARE SYSTEM
FEBRUARY 7, 2025
6900 N. PECOS ROAD, NORTH LAS VEGAS, NV 89086
100% CONSTRUCTION
DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
REPLACE ROOF FOR BUILDING 1
100% CONSTRUCTION DOCUMENTS
PM PM
SITE MAP
DRAWING
NUMBER DRAWING TITLE
GI001 COVER SHEET
GI003 PROJECT INFO & CODE REQUIREMENTS
GI004 GENERAL NOTES & ARCHITECTURAL SYMBOLS
GI005 ARCHITECTURAL ABBREVIATIONS
GI100 AERIAL IMAGE
GS101 PARTIAL SITE PLAN
AE101 OVERALL FLOOR PLAN - LEVEL 01
AE102 OVERALL FLOOR PLAN - LEVEL 02
AE103 OVERALL FLOOR PLAN - LEVEL 03
AE104 OVERALL FLOOR PLAN - LEVEL 04
AE105 OVERALL FLOOR PLAN - LEVEL 05 (FOR REFERENCE ONLY)
AE106 OVERALL FLOOR PLAN - LEVEL 06 (FOR REFERENCE ONLY)
AE107 OVERALL FLOOR PLAN - ROOF
AE121J LEVEL 01 - AREA J
AE122A LEVEL 02 - AREA A
AE122B LEVEL 02 - AREA B
AE122S.2 LEVEL 02 - AREA S.2, AREA S.3, AREA S.4, AREA H.2
AE123A.2 LEVEL 03 - AREA A.2
AE123E LEVEL 03 - AREA E, AREA E.2
AE123H LEVEL 03 - AREA E, AREA H
AE123S LEVEL 03 - AREA S
AE124C LEVEL 04 - AREA C, AREA C.2
AE124F LEVEL 04 - AREA F
AE125LN LEVEL ROOF - AREA L, AREA N
AE125MP LEVEL ROOF - AREA M, AREA P
AE251 BUILDING ELEVATIONS - NORTH/WEST
AE252 BUILDING ELEVATIONS - SOUTH/EAST
AE402B ENLARGED FLOOR PLANS - LEVEL 02 - AREA B
AE403H ENLARGED FLOOR PLAN - LEVEL 03 - AREA H
AE404F ENLARGED FLOOR PLAN - LEVEL 04 - AREA F
AE560 TYPICAL ROOF DETAILS
AE561 TYPICAL ROOF DETAILS
EE121J LEVEL 01 ELECTRICAL - AREA J
EE123H LEVEL 03 ELECTRICAL - AREA H
EE124C LEVEL 04 ELECTRICAL - AREA C
EE125LP LEVEL 07 ELECTRICAL - AREA L, AREA P
MP122A LEVEL 02 - AREA A PLUMBING PLAN
MP122B LEVEL 02 - AREA B PLUMBING PLAN
MP122S.2 LEVEL 02 - AREA S.2 PLUMBING PLAN
MP124C LEVEL 04 - AREA C PLUMBING PLAN
MP124F LEVEL 04 - AREA F PLUMBING PLAN
MP125L LEVEL ROOF - AREA L PLUMBING PLAN
MP125N LEVEL ROOF - AREA N PLUMBING PLAN
MP125P LEVEL ROOF - AREA P PLUMBING PLAN
MP700 MECHANICAL AND PLUMBING DETAILS
TOTAL NUMBER OF SHEETS: 45
SHEET INDEXVICINITY MAP
N
SITE
SIGNATURE BLOCK
Revisions: Date:
BUILDING 1 PROGRAM LEGEND
A = ADMINISTRATION
A.2 = AUDITORIUM
B = ADMINISTRATION
C = SPECIALTY CLINICS
C.2 = MAIN HOSPITAL
E = MENTAL HEALTH
E.2 = MENTAL HEALTH
F = SPECIALTY CLINICS
H = MENTAL HEALTH
H.2 = MENTAL HEALTH
H.3 = MENTAL HEALTH
J = WAREHOUSE
L = MAIN HOSPITAL
M = MAIN HOSPITAL
N = MAIN HOSPITAL
P = MAIN HOSPITAL
S = EMERGENCY DEPARTMENT
S.2 = EMERGENCY DEPARTMENT
S.3 = EMERGENCY DEPARTMENT
S.4 = EMERGENCY DEPARTMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
A u to d e s k D o c s /D e s ig n R e p la c e
R o o f
B u ild in g
/5
-2
-3
.0
.A
.L V
.r v t
/7
/2
:0
:3
P M
GI003
PROJECT INFO & CODE
REQUIREMENTSAwen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
02/07/2025
REPLACE ROOF FOR
BUILDING 1 BLDG 1
6900 N. PECOS ROAD,
NORTH LAS VEGAS, NV 89086
593-24-302
100% CONSTRUCTION
DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
PM PM
CODE ANALYSIS
THE 'REPLACE ROOF FOR BUILDING 1' PROJECT OF THE VA SOUTHERN NEVADA HEALTHCARE SYSTEM (VASNHS) SITE INTENDS TO REMEDIATE AND RESOLVE ISSUES WITH THE EXISTING ROOF DUE TO DETERIORATING CONDITION AND WATER INTRUSION OF THE MAIN HOSPITAL ROOF. THE ROOF IS AT
THE END OF ITS DESIGN LIFE AND REQUIRES ATTENTION DUE TO DEGRADATION AND WATER
INTRUSION DUE TO FAILURE OF THE ROOFING SYSTEM OR BY INADVERTENT PUNCTURE BY
EQUIPMENT OR STAFF.
THE A/E TEAM HAS PROVIDED ARCHITECTURAL AND CONSULTANT DESIGN AND ASSESSMENT TO
RECOMMEND REPAIR OR REPLACEMENT OF THE ROOF BASED ON OBSERVATIONS AND SURVEYS OF
EXISTING CONDITIONS. AN IR SCAN SURVEY AND SUBSEQUENT MOISTURE PENETRATION STUDIES
WERE COMPLETED TO VERIFY AREAS OF THE ROOF IN NEED OF FULL REPLACEMENT.
CONSTRUCTION PROJECT WILL EMPLOY THREE MAIN LEVELS OF DESIGN RESOLUTION:
1. CLEANING OF THE ROOF SURFACE WHERE RUST, MOISTURE, VEGETAL GROWTH/MOSS, GREASE, GRANULAR BUILD-UP HAVE ACCUMULATED.
2. REPAIR OF PENETRATION AREAS WHERE CONDUITS, BOOTS, AND SEALANTS HAVE FAILED. REPAIR
OF SURFACE CONDITIONS WHERE EXISTING ROOF COVER SHEET IS PHYICALLY TORN, DAMAGED, BUBBLED AND/OR FAILED.
3. REPLACEMENT OF ROOFING AREAS DOWN TO STRUCTURAL DECKING WHERE MOISTURE
PENETRATION HAS OCCURED, INCLUDING REPLACEMENT OF INSULATION LAYERS AND LAYERS
BELOW COVER SHEET. AN IR SCAN SURVEY WAS COMPLETED TO VERIFY THESE AREAS. THE GC IS REQUIRED TO CONDUCT A SECOND IR SCAN SURVEY AT THE TIME OF CONSTRUCTION TO VERIFY
WET ROOF INSULATION AREAS.
A PRE-BID WALKTHROUGH IS HIGHLY RECOMMENDED IN ORDER TO QUANTIFY THE EXTENT OF PATCH AND REPAIR NECESSARY AT THE ROOF, AS WELL AS THE EXTENT OF FLASHING NEEDING REPAIR OR REPLACEMENT. GC TO FIELD VERIFY IN FIELD ALL NECESSARY PATCH AND REPAIR LOCATIONS TO EXISTING ROOFING, AND ANY ALL FLASHING AND COPING LOCAITONS IN NEED OF REPLACEMENT, AND
INCLUDE IN BID.
ONCE ALL REPAIRS HAVE BEEN MADE, THE ROOF WILL BE LIQUID COATED WITH A TWO-PLY
POLYEURETHANE BASED ROOFING SYSTEM. SPECIFICATIONS OFFER MORE DETAIL ON THIS PROCESS
AND PERFORMANCE OF ADEQUATE PRODUCTS.
PROJECT SCOPE AREAS INCLUDE:
1. BUILDING 1 (MAIN HOSPITAL BUILDING - ROOF AREAS A, A.2, B, C, C.2, E, E.2, E.3, F, H, H.2, H.3, J, L, M, N, P, S, S.2, S.3, S.4 AND OVERRUN AREAS AT ELECTRICAL/MECHANICAL ENCLOSURES AS WELL AS
ROOFING OVER COVERED ENTRIES AND CORRIDORS AS INDICATED BELOW AND DETAILED IN
DRAWINGS)
SCOPE OF WORK
1. VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A
MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR
IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA
DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT
VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
(WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN
DOCUMENTS, SEE NOTES BELOW)
• NFPA 99 LIFE SAFETY CODE (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC)
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL
ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE
INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,
COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE
RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM
OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL
CONDITIONS.
• REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
APPLICABLE CODES AND STANDARDS
2. LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL
IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS,
INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ)
AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH
ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT
PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES
NOT PAY FOR REVIEW OR INSPECTION FEES.
3. NFPA 99 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY
CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 99 AND DOCUMENTS
REFERENCED BY NFPA 99 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF
THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE
LATEST EDITION OF NFPA 99 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT
ADDRESSED BY NFPA 99 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE
REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN
THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 99 OR A DOCUMENT REFERENCED BY NFPA 99, THE REQUIREMENTS OF NFPA 99 OR THE DOCUMENT REFERENCED BY NFPA 99 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE
IBC REQUIREMENTS ARE DIFFERENT).
4. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA
REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED
NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE
ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE VA TO ENSURE A
CONSISTENCY SYSTEM WIDE.
A B
C E
KEY PLAN
A .2
L M
F N P H
S.2
S J
E.2 C.2
S.4
H.2
H.3
S.3
PROJECT NAME:
VA SOUTHERN NEVADA HEALTHCARE SYSTEM (VASNHS)
REPLACE ROOF BUILDING 1
PROJECT ADDRESS:
6900 N. PECOS RD.
NORTH LAS VEGAS, NV 89086
BUILDING CLASSIFICATION:
BASIC OCCUPANCY GROUP(S):
(NFPA 99)
OCCUPANCY GROUP I
CONSTRUCTION TYPE:
(EXISTING)
TYPE II 222, SPRINKLERED
BASIC ALLOWABLE AREA:
(222 FULLY SPRINKLERED)
OCCUPANCY GROUP I-2 – UNLIMITED
ACTUAL HEIGHT
6 STORY HOSPITAL
MINIMUM FIRE RESISTIVE REQUIREMENTS:
(NFPA 99)
ELEMENT RATING
BEARING WALLS, EXTERIOR 2-HOUR
BEARING WALLS, INTERIOR 2-HOUR
NON-BEARING WALLS, INTERIOR 0-HOUR
STRUCTURAL FRAME 2-HOUR
STRUCTURAL FRAME, SUPPORTING ROOF ONLY 1-HOUR
SHAFT ENCLOSURES 2-HOUR
FLOORS AND FLOOR/CEILINGS 2-HOUR
ROOFS AND ROOF/CEILINGS 1-HOUR
HORIZONTAL EXIT 2-HOUR
SMOKE BARRIER (COMPARTMENTS) 1-HOUR
HAZARDOUS AREA SEPARATIONS 1-HOUR
SOILED LINEN ROOMS 1-HOUR
STORAGE ROOMS > 100 SF 1-HOUR
CORRIDORS
(NFPA 99)
EXCEPTION 3, WITHIN BUILDINGS PROTECTED THROUGHOUT
BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM, 1-HOUR
FIRE RESISTANCE RATING IS NOT REQUIRED.
MAXIMUM TRAVEL DISTANCE TO EXITS
(NFPA 99)
TRAVEL DISTANCE 200-FEET
COMMON PATH OF TRAVEL 100-FEET
DEAD-END CORRIDOR 50-FEET
FIRE SUPPRESSION
THE FACILITY IS FULLY SPRINKLERED PER NFPA 13
BUILDING DATA
LEVEL ROOF AREA PROGRAM AREA (SF)
LEVEL 7 (L,M,N,P) ROOF AREA L MAIN HOSPITAL 11616 SF
LEVEL 7 (L,M,N,P) ROOF AREA L - ELEV OVERRUN MAIN HOSPITAL 795 SF
LEVEL 7 (L,M,N,P) ROOF AREA L - MECH OVERRUN MAIN HOSPITAL 140 SF
LEVEL 7 (L,M,N,P) ROOF AREA M MAIN HOSPITAL 12469 SF
LEVEL 7 (L,M,N,P) ROOF AREA M - MECH OVERRUN MAIN HOSPITAL 140 SF
LEVEL 7 (L,M,N,P) ROOF AREA N MAIN HOSPITAL 11238 SF
LEVEL 7 (L,M,N,P) ROOF AREA N - ELEV OVERRUN MAIN HOSPITAL 865 SF
LEVEL 7 (L,M,N,P) ROOF AREA N - MECH OVERRUN MAIN HOSPITAL 140 SF
LEVEL 7 (L,M,N,P) ROOF AREA N - STAIR OVERRUN MAIN HOSPITAL 344 SF
LEVEL 7 (L,M,N,P) ROOF AREA P MAIN HOSPITAL 12060 SF
LEVEL 7 (L,M,N,P) ROOF AREA P - MECH OVERRUN MAIN HOSPITAL 140 SF
LEVEL 7 (L,M,N,P) ROOF AREA P - STAIR OVERRUN MAIN HOSPITAL 353 SF
LEVEL 7 (L,M,N,P) 50300 SF
LEVEL 4 (C,C.2,F) ROOF AREA C SPECIALTY CLINICS 28259 SF
LEVEL 4 (C,C.2,F) ROOF AREA C - 4B101 SPECIALTY CLINICS 567 SF
LEVEL 4 (C,C.2,F) ROOF AREA C - MECH OVERRUN SPECIALTY CLINICS 829 SF
LEVEL 4 (C,C.2,F) ROOF AREA C - MECH OVERRUN SPECIALTY CLINICS 370 SF
LEVEL 4 (C,C.2,F) ROOF AREA C - MECH OVERRUN SPECIALTY CLINICS 37 SF
LEVEL 4 (C,C.2,F) ROOF AREA C - MECH OVERRUN SPECIALTY CLINICS 49 SF
LEVEL 4 (C,C.2,F) ROOF AREA C - MECH OVERRUN SPECIALTY CLINICS 393 SF
LEVEL 4 (C,C.2,F) ROOF AREA F SPECIALTY CLINICS 28380 SF
LEVEL 4 (C,C.2,F) ROOF AREA F - 4A101 SPECIALTY CLINICS 296 SF
LEVEL 4 (C,C.2,F) ROOF AREA F - 4A201 SPECIALTY CLINICS 242 SF
LEVEL 4 (C,C.2,F) ROOF AREA F - 4B201/4B402 SPECIALTY CLINICS 412 SF
LEVEL 4 (C,C.2,F) ROOF AREA F - MECH OVERRUN SPECIALTY CLINICS 393 SF
LEVEL 4 (C,C.2,F) ROOF AREA F - MECH OVERRUN SPECIALTY CLINICS 829 SF
LEVEL 4 (C,C.2,F) ROOF AREA F - MECH OVERRUN SPECIALTY CLINICS 49 SF
LEVEL 4 (C,C.2,F) ROOF AREA F - MECH OVERRUN SPECIALTY CLINICS 370 SF
LEVEL 4 (C,C.2,F) ROOF C.2 SPECIALTY CLINICS 8204 SF
LEVEL 4 (C,C.2,F) 69678 SF
LEVEL 3 (E,E.2,H,H.3,S) ROOF AREA A.2 AUDITORIUM 6831 SF
LEVEL 3 (E,E.2,H,H.3,S) ROOF AREA E MENTAL HEALTH 14727 SF
LEVEL 3 (E,E.2,H,H.3,S) ROOF AREA E.2 MENTAL HEALTH 3823 SF
LEVEL 3 (E,E.2,H,H.3,S) ROOF AREA H MENTAL HEALTH 6457 SF
LEVEL 3 (E,E.2,H,H.3,S) ROOF AREA H.3 EMERGENCY DEPARTMENT 485 SF
LEVEL 3 (E,E.2,H,H.3,S) ROOF AREA S EMERGENCY DEPARTMENT 7247 SF
LEVEL 3 (E,E.2,H,H.3,S) 39571 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA 1C101 MAIN HOSPITAL 153 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA 1C397 MAIN HOSPITAL 151 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA A ADMINISTRATION 15585 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA B ADMINISTRATION 28854 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA H.2 EMERGENCY DEPARTMENT 660 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA S.2 EMERGENCY DEPARTMENT 16858 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA S.2 OVERRUN EMERGENCY DEPARTMENT 372 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA S.3 EMERGENCY DEPARTMENT 999 SF
LEVEL 2
(A,B,S.2,S.3,S.4,H.2)
ROOF AREA S.4 EMERGENCY DEPARTMENT 2697 SF
LEVEL 2 (A,B,S.2,S.3,S.4,H.2) 66329 SF
LEVEL 1 (J) ROOF AREA J WAREHOUSE 17785 SF
LEVEL 1 (J) 17785 SF
TOTAL IN SCOPE AREA 243663 SF
ROOF AREASAESBESTOS NOTES
ABATEMENT SCHEDULE
LEVEL
ID
AREA MATERIAL DISCRIPTION
# LOCATION
LEVEL 2 (A,B,S.2,S.3,S.4,H.2)
ROOF AREA B
DEMO
192 SF ROOFING MEMBRANE
LEVEL 2 (A,B,S.2,S.3,S.4,H.2)
ROOF AREA B
DEMO
9 SF ROOFING MEMBRANE
LEVEL 3 (E,E.2,H,H.3,S)
ROOF AREA
H DEMO
121 SF ROOFING MEMBRANE
LEVEL 4 (C,C.2,F)
ROOF AREA F
DEMO
170 SF ROOFING MEMBRANE
TOTAL AREA 492 SF
1. ASBESTOS DATA IS NOT AVAILABLE FOR THE ROOF MEMBRANE, THE MATERIAL
SHOULD BE ASSUMED TO CONTAIN ASBESTOS AND RENOVATION AND/OR
DEMOLITION ACTIVITIES SHOULD NOT START UNTIL THE CONTRACTOR
PROVIDES SAMPLING AND ANALYSIS IN THE AREAS WHERE WORK IS TO OCCUR
PER SPECIFICATION SECTION. IF ASBESTOS FOUND, PARTIES CONDUCTING
RENOVATION AND/OR DEMOLITION ACTIVITIES SHOULD FOLLOW ALL
APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS IN HANDLING
IDENTIFIED AND SUSPECT ACM AND IN ACCORDANCE WITH SPECIFICATION
SECTION 02 82 13.21, ASBESTOS ROOFING ABATEMENT.
2. SAMPLING AND ANALYSIS OF ROOFING MATERIAL TO BE CONDUCTED AT AREAS
OF ROOF DEMOLITION. REFER TO THE FOLLOWING VIEWS/SHEETS FOR
REFERENCE TO SPECIFIC DEMOLITION AREAS:
• C1/AE402B
• F1/AE402B
• C1/AE403H
• C1/AE404F
WALK PAD AREAS
WALK PAD AREA SCHEDULE
LOCATION WALK PAD AREA
LEVEL 1 - AREA J 1001 SF
LEVEL 2 - AREA A 1548 SF
LEVEL 2 - AREA B 2346 SF
LEVEL 2 - AREA S.2 95 SF
LEVEL 3 - AREA E 1117 SF
LEVEL 3 - AREA E 334 SF
LEVEL 3 - AREA H 273 SF
LEVEL 3 - AREA S 749 SF
LEVEL 4 - AREA C 1496 SF
LEVEL 4 - AREA F 2848 SF
LEVEL 7 - AREA L 1317 SF
LEVEL 7 - AREA M 1489 SF
LEVEL 7 - AREA N 1906 SF
LEVEL 7 - AREA P 2010 SF
TOTAL AREA 18,529 SF
VIEW NUMBERING EXAMPLE
THE NUMBER OF THE MODULE WHICH
OCCURS IN THE LOWER LEFT CORNER OF A
SINGLE MODULE OR SEVERAL MODULES
GROUPED TOGETHER WILL DEFINE THE
FINAL VIEW NUMBER AS SHOWN IN THE
ILLUSTRATION TO THE LEFT. ALTHOUGH
THE MODULE NUMBERS OCCUR IN
CONSECUTIVE ORDER, NOT ALL NUMBERS
ARE NECESSARILY USED ON EACH SHEET.
VIEW NUMBERING LAYOUT
VIEWS ARE NUMBERED ACCORDING TO THEIR
LOCATION ON EACH SHEET AND ARE NOT
NUMBERED CONSECUTIVELY. EACH MODULE
MAINTAINS THE ALPHA-NUMERIC VALUE
ASSOCIATED WITH IT. THIS SYSTEM CAN BE
APPLIED TO ANY DRAWING THAT CONTAINS
MULTIPLE IMAGES. THE IMAGES ARE
NUMBERED ACCORDING TO THE MODULE
SYSTEM SHOWN ILLUSTRATED TO THE LEFT.
EACH VIEW MAY OCCUPY ONE OR MORE
WHOLE MODULES. THE VIEW MODULE IS
USED TO ESTABLISH THE IDENTIFYING LABEL
FOR EACH DETAIL NOT TO LIMIT THE SIZE OF
THE DETAIL
B1 B3 B5 B7
C5
D1 D5 D7
E1 E2 E3
F1 F2 F3 F5 F7
A1 A2 A3 A4 A5 A6 A7 A8 A9
B1 B2 B3 B4 B5 B6 B7 B8 B9
C1 C2 C3 C4 C5 C6 C7 C8 C9
D1 D2 D3 D4 D5 D6 D7 D8 D9
E1 E2 E3 E4 E5 E6 E7 E8 E9
F1 F2 F3 F4 F5 F6 F7 F8 F9
A10
B10
C10
D10
E10
F10
ARCHITECTURAL SYMBOLS
CENTER LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
DEMOLITION LINE
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
HIDDEN FEATURES LINE
NEW CONSTRUCTION LINE
PROPERTY LINE
SMOKE BARRIER LINE (ABOVE CEILING)
BREAK, ROUND
BREAK, STRAIGHT
DETAIL INDICATOR
DETAIL/CALLOUT PLAN INDICATOR
DIMENSION LINE, CLEAR
DIMENSION LINE, CENTER OF STUD, UNO
DOOR OPENING/BROWED LIGHT INDICATOR
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
EXTERIOR ELEVATION INDICATOR,
MULTIPLE VIEWS WHERE OCCURS
BUILDING SECTION INDICATOR
GRAPHIC SCALE
AREA NAME AND NUMBER
STRUCTURAL GRID
KEYNOTE
NORTH ARROW
OUT OF SCOPE AREA (BUILDING INTERIOR), REFER TO
FIRE PROTECTION, PLUMBING, MECHANICAL,
ELECTRICAL, AND TELECOM DRAWINGS FOR
ADDITIONAL WORK INSIDE THIS AREA
THERMAL BATT INSULATION
ACOUSTIC BATT INSULATION
S
D2
AE512
D2
AE512
6'-0"
DRAWING BLOCK TITLE
1/4"=1'-0"
C4
D2
AE512
D2
AE512
5 10 15 20
CORRIDOR
C123
A
PROJECT
NORTH
S
6'-0"
AE5121
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
A u to d e s k D o c s /D e s ig n R e p la c e
R o o f
B u ild in g
/5
-2
-3
.0
.A
.L V
.r v t
/7
/2
:0
:3
P M
GI004
GENERAL NOTES & ARCHITECTURAL
SYMBOLSAwen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
02/07/2025
REPLACE ROOF FOR
BUILDING 1 BLDG 1
6900 N. PECOS ROAD,
NORTH LAS VEGAS, NV 89086
593-24-302
100% CONSTRUCTION
DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
PM PM
GENERAL
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED ON GI001, SHEET INDEX.
2. MATERIAL QUANTITIES EXTRACTED BY THE GC FROM THE DESIGN-INTENT MODEL SHOULD BE
USED WITH CAUTION BECAUSE A DESIGN-INTENT MODEL IS NOT CREATED FOR THIS PURPOSE.
THE GC IS OBLIGATED TO DETERMINE, AND ASSUMES ALL RISK FOR, THE SUITABILITY OF THE
DESIGN-INTENT BIM FOR MATERIAL QUANTITY TAKEOFFS.
3. THE GC IS RESPONSIBLE TO ENSURE THAT EQUIPMENT AND SYSTEMS ARE INSTALLED
ACCORDING TO THE CONSTRUCTION COORDINATED MODEL LOCATIONS, WHICH HAVE BEEN
SIGNED OFF BY VA FACILITY MANAGEMENT PERSONNEL, AND ARE REFINED FROM THE AE
DESIGN COORDINATED MODEL LOCATIONS. ANY DEVIATIONS THAT IMPINGE ON SPACE
RESERVATIONS AS NOTED IN VA BIM STANDARDS MUST BE APPROVED BY VA IN WRITING.
4. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE DRAWINGS OF
ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE – SEE “SHEET INDEX”.
5. THE COMPLETE SET OF DRAWINGS CONSIST OF ALL DRAWINGS LISTED BY THE “SHEET INDEX”.
THE WORK DESCRIBED IN ONE SHEET MAY BE REFERENCED AND MAY BE AFFECTED BY WORK
DESCRIBED ON ANOTHER SHEET.
6. THE WORK DESCRIBED IN ONE DISCIPLINE MAY BE REFERENCED AND AFFECTED BY WORK OF
ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHOULD NOT BE
REDISTRIBUTED OR UTILIZED BY THE CONTRACTOR.
7. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES AND SUPPLIERS WITH REQUIREMENTS OF THE CONTRACT
DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE
AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN THE
CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT TRADE.
8. ALL ARCHITECTURAL DRAWINGS ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND
LOCATION OF ALL EXPOSED ELEMENTS OF THE WORK, INCLUDING THAT WORK WHICH IS
ILLUSTRATED PRIMARILY ON DRAWING OF OTHER DISCIPLINES, UNLESS OTHERWISE NOTED ON
THE DRAWINGS.
9. THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND ELEVATIONS
SHOW THE LOCATION OF MANY-BUT NOT ALL – EXPOSED PARTS OF THE WORK. FOR ITEMS NOT
LOCATED EXACTLY, APPLY THE RULES INDICATED BY THE DRAWING “TYPICAL MOUNTING
HEIGHTS AND CONFIGURATION DIAGRAMS” TO DETERMINE THE EXACT LOCATION OF EACH
EXPOSED PART OF THE WORK.
10. REFER TO THE MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR THE DETAILED
DESIGN OF THE MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS, OF WHICH PORTIONS MAY
ALSO MAY BE SHOWN ON THE ARCHITECTURAL DRAWINGS.
11. ALL PARTS OF THE WORK – INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC – SHALL
COMPLY WITH ALL APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND
LAWS OF ALL FEDERAL, STATE DISTRICT, TERRITORIAL AND LOCAL GOVERNMENT AUTHORITIES
HAVING JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT.
12. NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT
WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR
LAW.
13. IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A REGULATORY
REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE ESTABLISHING THE MORE
STRINGENT OR RESTRICTIVE REQUIREMENT:
• THE DRAWINGS AND SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS THAN THOSE SET FORTH BY THE APPLICABLE
REGULATORY REQUIREMENTS,
• WHERE THE DRAWINGS AND SPECIFICATIONS PROVIDE MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS, THE CONTRACTOR SHALL COMPLY WITH THOSE
REQUIREMENTS. WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED RULES,
CODES, REGULATIONS, ORDINANCES, OR LAWS ARE MORE RESTRICTIVE THAN THAT SET
FORTH BY THE DRAWINGS AND SPECIFICATION, THE CONTRACTOR SHALL COMPLY WITH ALL
SUCH MORE RESTRICTIVE REQUIREMENTS. ALTHOUGH SUCH REQUIREMENTS MAY NOT BE
ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.
14. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE
INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND ESTABLISH
MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
15. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS “BASIS OF DESIGN”.
• ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR
ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURERS
AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY THE
DRAWINGS IS THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY.
• THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF
SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE “BASIS OF DESIGN” MAY VARY
FROM THAT SHOWN BY THE DRAWINGS.
• THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN LIEU OF
THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY. HOWEVER, THE CONTRACTOR IS
RESPONSIBLE (AT NO ADDITIONAL EXPENSE TO THE OWNER) FOR ALL COORDINATION AND
REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME FUNCTIONAL
AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE “BASIS OF DESIGN” SHOWN BY THE
CONTRACT DOCUMENTS.
20. CONSTRUCTION, WORKMANSHIP, AND MATERIALS SHALL CONFORM TO THE 2024 NFPA AND
CURRENT VA TIL STANDARDS.
21. THE CONTRACTOR SHALL NOTIFY THE COR WHERE A CONFLICT OR DISCREPANCY OCCURS
BETWEEN THE CONTRACT DOCUMENT AND ANY OTHER PORTION OF THE CONTRACT
DOCUMENTS, FIELD CONDITIONS OR WHERE ANY CONDITIONS ARISE NOT COVERED BY THESE
DOCUMENTS WHEREIN WORK WILL NOT COMPLY WITH THE REQUIREMENTS OF THE NFPA.
22. THESE DRAWINGS INDICATE IN GENERAL THE PROJECT IN TERMS OF ARCHITECTURAL
DESIGN INTENT, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS
AND TYPE OF STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS. THE DRAWINGS DO
NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE
AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. AS INDICATED OR
DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER
EXECUTION AND COMPLETION OF THE WORK.
23. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR
ARCHITECTURAL ROUTING OF CONDUIT, PIPING, DUCTWORK ETC. AT UNDERSIDE OF
CONCRETE SLABS. ROUTING SHALL BE ORTHOGONAL, AND LIKE ITEMS TO BE GANGED AND
TO RUN PARALLEL WITH EVEN SPACING TYPICAL. EXACT ROUTING SHALL BE DETERMINED BY
THE CONTRACTOR, AND LAYOUT SHOP DRAWINGS SUBMITTED FOR ARCHITECTURAL REVIEW
AND APPROVAL PRIOR TO INSTALLATION. CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS
OF ALL MECHANICAL EQUIPMENT PADS AND BASES AS WELL AS POWER AND WATER OR DRAIN
INSTALLATIONS WITH EQUIPMENT MANUFACTURERS BEFORE PROCEEDING WITH THE WORK.
CHANGES TO ACCOMMODATE FIELD CONDITIONS OR SUBSTITUTIONS SHALL BE MADE AT NO
ADDITIONAL COST.
24. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE IN ACCORDANCE WITH VA
PG-18-4 AND CONSIDERED TO BE CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS
QUESTIONS REGARDING SAME, OR THEIR EXACT MEANING, THE ARCHITECT SHALL BE
NOTIFIED FOR CLARIFICATION.
25. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR/WALL SLEEVES AND SHAFTS
IN CONCRETE SLABS/WALLS WITH MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL,
AND ARCHITECTURAL DRAWINGS AND DISCREPANCIES, IF ANY, TO BE BROUGHT TO NOTICE
OF THE ENGINEER PRIOR TO EXECUTION OF WORK.
26. COORDINATE WORK WITH COR, INCLUDING SCHEDULING TIME AND LOCATIONS FOR
DELIVERIES, BUILDING ACCESS, USE OF BUILDING SERVICES AND FACILITIES, AND USE OF
ELEVATORS. MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND OCCUPANTS.
27. ALL EXISTING OR PROPOSED ELEVATIONS (LEVELS) AND DIMENSIONS, ON SITE AND ON
DRAWINGS MUST BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE THE
PREPARATION OF SHOP DRAWINGS OR COMMENCEMENT OF ANY ITEM OF WORK ON THE SITE.
28. ARCHITECTURAL DRAWINGS MUST ALWAYS BE READ IN CONJUNCTION WITH ALL OTHER
RELEVANT SERVICES DRAWINGS AND CONTRACT DOCUMENTS. ANY DISCREPANCY BETWEEN
THESE DRAWINGS AND DOCUMENTS SHOULD BE REPORTED TO THE COR FOR CLARIFICATION
AND VERIFICATION.
FIRE PROTECTION
1. ALL OPENINGS IN SLABS AT MECHANICAL ROOMS (INCLUDING SPACES LEFTOVER IN THE
SHAFTS AFTER INSTALLATION OF DUCTS) MUST BE SEALED OFF WITH NON-COMBUSTIBLE
MATERIALS TO MAINTAIN THE REQUIRED FIRE-RATING CONTINUITY OF THE FLOOR
CONSTRUCTION. CONTRACTOR SHALL SUBMIT SHOP-DRAWINGS FOR APPROVAL FOR ALL
SUCH CASES.
2. ALL OPENINGS AT SLABS, WALLS SHALL BE SEALED OFF (FILLED) WITH NON-COMBUSTIBLE
MATERIALS TO MAINTAIN THE REQUIRED FIRE RATING CONTINUITY OF THE FLOOR, WALL
CONSTRUCTION. ALL HOLES, INCLUDING THOSE FOR MECHANICAL, AND ELECTRICAL
FACILITIES WHICH ARE LOCATED ON FLOOR SLAB, PARTITIONS AND WALLS MUST BE FILLED
WITH NON-COMBUSTIBLE MATERIALS TO PROVIDE REQUIRED FIRE RATING AND SHALL BE
SEALED AGAINST PASSAGE OF SMOKE AND FLAME.
3. A FINISH OR FIRE RATING INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH OF WALL
IS TO BE FINISHED OR FIRE RATED.
4. FIRE RATED ASSEMBLIES SHALL BE PER NFPA 721.1(1), GENERIC ASSEMBLIES OF GYPSUM
HANDBOOK, OR HAVE ICC APPROVAL.
5. PENETRATIONS OF FIRE RESISTANCE-RATED HORIZONTAL ASSEMBLIES AND FIRE
RESISTANCE RATED WALLS SHALL COMPLY WITH SECTION 714 OF THE NFPA, INCLUDING FIRE
DAMPERS AND SMOKE DAMPERS WHERE REQUIRED.
6. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED
PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED
ASSEMBLIES AND THE BOX DOES NOT EXCEED 1/8" UNLESS LISTED OTHERWISE.
METAL WORKS
1. STEEL ELEMENTS NOT SHOWN IN THE CONTRACT DRAWINGS BUT ARE DEEMED NECESSARY
FOR THE SATISFACTORY COMPLETION OF THE WORKS SHALL BE GALVANIZED STEEL PRIMED
& PAINTED WITH TWO COATS OF EPOXY PAINT FOR ALL INTERIOR SITUATIONS AND STAINLESS
STEEL (#316) FOR ALL EXTERIOR SITUATIONS.
2. ALL WELDED STEEL JOINTS SHALL BE GRINDED SMOOTH, PRIMED & PAINTED.
3. ALL WELDING SHALL BE OF SUITABLE TYPE TO STEEL WORKS.
GENERAL NOTES
16. THE CONTRACTOR SHALL NOT SCALE DRAWINGS, THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF WORK AND SHALL NOTIFY THE
OWNER’S REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.
17. ALL WORK PERFORMED SHALL COMPLY WITH THE CONTRACT DOCUMENTS, DRAWINGS, AND
PROJECT MANUAL, INCLUDING THESE GENERAL NOTES. THE CONTRACTOR SHALL COORDINATE
THE INTENT OF THE GENERAL NOTES WITH ALL TRADES. ALL WORK PERFORMED SHALL COMPLY
WITH CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF PUBLIC AUTHORITIES
GOVERNING THE WORK.
18. THE PROJECT MANUAL, BOUND SEPARATELY, IS A PART OF THE CONTRACT DOCUMENTS.
19. THE ORGANIZATION OF THE DRAWINGS AND PROJECT MANUAL SHALL NOT CONTROL THE
CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN ESTABLISHING THE
EXTENT OF WORK TO BE PERFORMED BY ANY TRADE.
GENERAL NOTES GENERAL NOTES
DEMOLITION
1. DEMOLITION IS INTENDED TO PREPARE THE BUILDING TO RECEIVE THE NEW WORK. THE
INFORMATION PROVIDED IN NO WAY INTENDS TO MEAN THAT DEMOLITION IS LIMITED ONLY TO THOSE ITEMS SPECIFICALLY IDENTIFIED. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY
TO EXECUTE DEMOLITION WORK AS REQUIRED TO ALLOW THE EXECUTION OF NEW WORK.
REMOVE ALL EXISTING ITEMS OF CONSTRUCTION AND EQUIPMENT WITHIN THE PROJECT
AREA, INDICATED ON DEMOLITION PLAN, WHETHER SHOWN OR NOT INCLUDING BUT NOT
LIMITED TO FLOOR MATERIAL, BASE, WALLS, CEILINGS, DOORS, DOOR FRAMES, CASEWORK,
ELECTRICAL, MECHANICAL, PLUMBING FIXTURES AND SYSTEM, AS REQUIRED TO
ACCOMMODATE NEW CONSTRUCTION. ANY EXISTING WORK TO REMAIN, IF DAMAGED BY ANY
TRADE OR NEW CONSTRUCTION, SHALL BE PATCHED, REPAIRED OR REPLACED TO MATCH
EXISTING. COMPLY WITH APPLICABLE CODES AND REGULATIONS.
2. REMOVE MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF
THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND
REINSTALLED.
3. REMOVE AND SALVAGE MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER
THEM TO OWNER READY FOR REUSE.
4. REMOVE AND REINSTALL MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE
THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
5. EXISTING TO REMAIN MEANS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE
REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND
SALVAGED, OR REMOVED AND REINSTALLED.
6. SCHEDULE WORK TO MINIMIZE DISRUPTION OF SERVICES. COORDINATE WORK SCHEDULE
WITH THE COR. VA WILL NEED A 2-WEEK NOTICE FOR DISRUPTION OF SERVICES. WORK TIMES
TO BE COORDINATED WITH VA PRIOR TO START OF WORK.
7. COORDINATE WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING WORK TO CONFIRM ACCURACY IN THE DRAWINGS. REPORT ANY DISCREPANCIES
TO THE COR.
8. THE DEMOLITION DRAWINGS ARE CONSIDERED SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK PRIOR TO SUBMISSION OF PROPOSAL.
SUBMISSION TO BE MADE TO COR 2 WEEKS PRIOR TO START OF DEMOLITION.
9. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN
AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO
DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING
ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING FACILITIES. VA TO APPROVE
BARRIER LOCATIONS; BARRIERS TO BE CONSTRUCTED AS INDICATED.
10. DURING DEMOLITION, PROVIDE PROTECTION FOR ALL AIR INTAKE AND AIR HANDLING UNITS TO
REMAIN IN PLACE DURING THE RENOVATION WORK. EQUIPMENT TO REMAIN FUNCTIONAL
DURING CONSTRUCTION. IF NECESSARY TO DISCONNECT OR PAUSE FUNCTION OF ANY
MECHANICAL EQUIPMENT, A SCHEDULE FOR SHUT-DOWN MUST BE REVIEWED AND APPROVED
BY THE COR.
11. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR
REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
12. MISC. SUPPORTS ITEMS, ETC. REQUIRED FOR THE REINSTALLATION OF EQUIPMENT
CONTRACTOR TO REQUEST INFORMATION FROM AE TEAM.
13. ALL DEMOLISHED ITEMS ARE TO BE REMOVED IN THEIR ENTIRETY INCLUDING ALL ASSOCIATED
PIPING, WIRING, HANGERS, SUPPORTS, PROJECTIONS BOLTS NAILS, ETC. FROM EXISTING
SURFACES. PATCH ALL HOLES TO MATCH ADJACENT SURFACES OR PROVIDE NEW FINISHES
PER FINISH PLAN.
14. ALL STRUCTURAL INTERFERENCE OR STRUCTURAL WALLS, BEAMS, JOIST COLUMNS, ETC.
SHALL BE BROUGHT TO THE ATTENTION OF COR FOR DECISION. NO FLOOR OR STRUCTURAL
MEMBERS SHALL BE CUT WITHOUT PERMISSION OF A REGISTERED STRUCTURAL ENGINEER.
ALL PROPOSED SLEEVE / CORING SHALL BE REVIEWED BY COR.
15. HAUL ROUTES AND WORKER PATH OF TRAVEL TO BE FINALIZED AND APPROVED BY THE VA
PRIOR TO START OF WORK. ROUTES SHALL BE APPROVED AT BUILDING EXTERIOR ONLY, NO
INTERIOR PATHWAYS WILL BE AVAILABLE (HOISTWAYS, STAIRWELLS, CORRIDORS, ETC.).
19. DO NOT CUT AND PATCH MISCELLANEOUS ELEMENTS OR RELATED COMPONENTS IN A
MANNER THAT COULD CHANGE THEIR LOAD-CARRYING CAPACITY, THAT RESULTS IN
REDUCING THEIR CAPACITY TO PERFORM AS INTENDED, OR THAT RESULT IN INCREASED
MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY. THESE INCLUDE BUT ARE NOT
LIMITED TO, WATER, MOISTURE, OR VAPOR BARRIERS, MEMBRANES AND FLASHINGS,
EXTERIOR WALL CONSTRUCTION, EQUIPMENT SUPPORTS, PIPING, DUCTWORK, VESSELS, AND
EQUIPMENT, NOISE- AND VIBRATION-CONTROL ELEMENTS AND SYSTEMS.
20. DO NOT CUT AND PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL EVIDENCE OF
CUTTING AND PATCHING. DO NOT CUT AND PATCH CONSTRUCTION EXPOSED ON THE
EXTERIOR OR IN OCCUPIED SPACES IN A MANNER THAT WOULD, IN ARCHITECT'S OPINION,
REDUCE THE BUILDING'S AESTHETIC QUALITIES.
21. BEFORE PROCEEDING, MEET AT PROJECT SITE WITH PARTIES INVOLVED IN CUTTING AND
PATCHING, INCLUDING MECHANICAL AND ELECTRICAL TRADES. REVIEW AREAS OF POTENTIAL
INTERFERENCE AND CONFLICT. COORDINATE PROCEDURES AND RESOLVE POTENTIAL
CONFLICTS BEFORE PROCEEDING.
22. USE MATERIALS IDENTICAL TO IN-PLACE MATERIALS. FOR EXPOSED SURFACES, USE
MATERIALS THAT VISUALLY MATCH IN-PLACE ADJACENT SURFACES TO THE FULLEST EXTENT
POSSIBLE. IF IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED, USE MATERIALS
THAT, WHEN INSTALLED, WILL MATCH THE VISUAL AND FUNCTIONAL PERFORMANCE OF IN-
PLACE MATERIALS.
23. EXAMINE SURFACES TO BE CUT AND PATCHED AND CONDITIONS UNDER WHICH CUTTING AND
PATCHING ARE TO BE PERFORMED. BEFORE PATCHING, VERIFY COMPATIBILITY WITH AND
SUITABILITY OF SUBSTRATES, INCLUDING COMPATIBILITY WITH IN-PLACE FINISHES OR
PRIMERS. PROCEED WITH INSTALLATION ONLY AFTER UNSAFE OR UNSATISFACTORY
CONDITIONS HAVE BEEN CORRECTED.
24. PROVIDE TEMPORARY SUPPORT OF WORK TO BE CUT.
25. PROTECT IN-PLACE CONSTRUCTION DURING CUTTING AND PATCHING TO PREVENT DAMAGE.
PROVIDE PROTECTION FROM ADVERSE WEATHER CONDITIONS FOR PORTIONS OF PROJECT
THAT MIGHT BE EXPOSED DURING CUTTING AND PATCHING OPERATIONS.
26. AVOID INTERFERENCE WITH USE OF ADJOINING AREAS OR INTERRUPTION OF FREE PASSAGE
TO ADJOINING AREAS.
27. WHERE EXISTING SERVICES/SYSTEMS ARE REQUIRED TO BE REMOVED, RELOCATED, OR
ABANDONED, BYPASS SUCH SERVICES/SYSTEMS BEFORE CUTTING TO PREVENT
INTERRUPTION TO OCCUPIED AREAS.
28. EMPLOY SKILLED WORKERS TO PERFORM CUTTING AND PATCHING. PROCEED WITH CUTTING
AND PATCHING AT THE EARLIEST FEASIBLE TIME, AND COMPLETE WITHOUT DELAY. CUT IN-
PLACE CONSTRUCTION TO PROVIDE FOR INSTALLATION OF OTHER COMPONENTS OR
PERFORMANCE OF OTHER CONSTRUCTION, AND SUBSEQUENTLY PATCH AS REQUIRED TO
RESTORE SURFACES TO THEIR ORIGINAL CONDITION.
29. CUT IN-PLACE CONSTRUCTION BY SAWING, DRILLING, BREAKING, CHIPPING, GRINDING, AND
SIMILAR OPERATIONS, INCLUDING EXCAVATION, USING METHODS LEAST LIKELY TO DAMAGE
ELEMENTS RETAINED OR ADJOINING CONSTRUCTION. IF POSSIBLE, REVIEW PROPOSED
PROCEDURES WITH ORIGINAL INSTALLER; COMPLY WITH ORIGINAL INSTALLER'S WRITTEN
RECOMMENDATIONS.
30. IN GENERAL, USE HAND OR SMALL POWER TOOLS DESIGNED FOR SAWING AND GRINDING,
NOT HAMMERING AND CHOPPING. CUT HOLES AND SLOTS AS SMALL AS POSSIBLE, NEATLY
TO SIZE REQUIRED, AND WITH MINIMUM DISTURBANCE OF ADJACENT SURFACES.
TEMPORARILY COVER OPENINGS WHEN NOT IN USE.
31. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES.
32. CUT CONCRETE OR MASONRY USING A CUTTING MACHINE, SUCH AS AN ABRASIVE SAW OR
A DIAMOND-CORE DRILL.
33. CUT OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE REMOVED. CAP, VALVE, OR
PLUG AND SEAL REMAINING PORTION OF PIPE OR CONDUIT TO PREVENT ENTRANCE OF
MOISTURE OR OTHER FOREIGN MATTER AFTER CUTTING. PROCEED WITH PATCHING AFTER
CONSTRUCTION OPERATIONS REQUIRING CUTTING ARE COMPLETE.
34. PATCH CONSTRUCTION BY FILLING, REPAIRING, REFINISHING, CLOSING UP, AND SIMILAR
OPERATIONS FOLLOWING PERFORMANCE OF OTHER WORK. PATCH WITH DURABLE SEAMS
THAT ARE AS INVISIBLE AS POSSIBLE.
35. RESTORE EXPOSED FINISHES OF PATCHED AREAS AND EXTEND FINISH RESTORATION INTO
RETAINED ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF
PATCHING AND REFINISHING.
36. CLEAN PIPING, CONDUIT, AND SIMILAR FEATURES BEFORE APPLYING PAINT OR OTHER
FINISHING MATERIALS. RESTORE DAMAGED PIPE COVERING TO ITS ORIGINAL CONDITION.
37. PROTECT ADJACENT SURFACES; FOR EXAMPLE, BUT NOT LIMITED TO, SILLS, JAMBS AND
HEAD FRAMES AT WINDOWS AND DOORS TO NAME A FEW.
38. REMOVAL OF FIRE ALARM, FIRE SUPPRESSION, PLUMBING, MECHANICAL, ELECTRICAL,
TELECOMMUNICATION, AND SECURITY SYSTEM SHOULD BE LIMITED TO WHAT IS NECESSARY
FOR SAFE REMOVAL OF THE INDICATED WALL OR CEILING. APPROPRIATE LIGHT FIXTURES
SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE LIGHTING LEVELS FOR
CONSTRUCTION.
39. REFER TO STRUCTURAL, FIRE ALARM, FIRE SUPPRESSION, PLUMBING, MECHANICAL,
ELECTRICAL, TELECOMMUNICATION, AND SECURITY SYSTEM DOCUMENTS, FOR ADDITIONAL
DEMOLITION INFORMATION AND WORK.
VIEW NUMBERING SCHEME
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
A u to d e s k D o c s /D e s ig n R e p la c e
R o o f
B u ild in g
/5
-2
-3
.0
.A
.L V
.r v t
/7
/2
:0
:4
P M
GI005
ARCHITECTURAL ABBREVIATIONS
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
02/07/2025
REPLACE ROOF FOR
BUILDING 1 BLDG 1
6900 N. PECOS ROAD,
NORTH LAS VEGAS, NV 89086
593-24-302
100% CONSTRUCTION
DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
PM PM
ARCHITECTURAL ABBREVIATIONS U.N.O.
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABAN ABANDONED
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC
CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER
GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CERTIFICATE OF
OCCUPANCY, CLEANOUT, OR COMPANY
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING
STEEL INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM,
OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF
CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR
FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
OR FIBERGLASS REINFORCED
PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
CONCRETE
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE, LATENT
HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM
MED MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE
DIMENSION
OD OUTSIDE DIMENSION OUTSIDE
DIAMETER
OF/CI OWNER FURNISHED/CONTRACTOR
INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER
INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB…
This is the start of the file's text. The full file is on GovTribe.