ATTACHMENT D5 Pricing Schedule HB DD FY23.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- HENRY BIGELOW FY23 DRYDOCK REPAIRS
- Solicitation number
- 1305M222QNMAN00702
About this file
This document contains a pricing schedule for drydock repair services for the NOAA research vessel Henry Bigelow. The schedule lists 27 base work items and 16 optional work items covering services such as engine overhauls, hull preservation, cathodic protection system inspection and replacement, and various equipment renewals. It also includes additional items for growth work priced by labor rate and material markup percentage.
The solicitation number is 1305M222QNMAN00702 for FY23 drydock repairs to be performed on the Henry Bigelow. The Department of Commerce National Oceanic and Atmospheric Administration is listed as the contracting agency. Pricing is included for the base work items and optional work items, but unit prices are not provided for the growth work as these would be determined by the labor rate and material markup percentage quoted by offerors.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| NANCY FOSTER DD FY23 |
| RFQ 1305M222QNMAN01380 |
| Attachment D5 |
| Price Schedule |
| SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 3.1 | Temporary Services | JOB | 1 | $ - 0 | $ - 0 |
| 3.2 | Dry Docking & Routine DD Work | JOB | 1 | $ - 0 | $ - 0 |
| 3.3 | Zinc Renewals | JOB | 1 | $ - 0 | $ - 0 |
| 3.4 | Cathodic Protection System Inspection & Replacement | JOB | 1 | $ - 0 | $ - 0 |
| 3.5 | Underwater Body Coating | JOB | 1 | $ - 0 | $ - 0 |
| 3.6 | Rudder and Steering Gear Actuator Overhauls | JOB | 1 | $ - 0 | $ - 0 |
| 3.7 | Freeboard Preservation | JOB | 1 | $ - 0 | $ - 0 |
| 3.8 | Net Reel and Gilson Winch Overhauls | JOB | 1 | $ - 0 | $ - 0 |
| 3.9 | ABS Surveys | JOB | 1 | $ - 0 | $ - 0 |
| 3.10 | Trawl Winch Room Escape Hatch Cover Renewal | JOB | 1 | $ - 0 | $ - 0 |
| 3.11 | Portable and Fixed Fire Extinguishers Inspection | JOB | 1 | $ - 0 | $ - 0 |
| 3.12 | Liferaft Annual Inspection/Test Certificate49 | JOB | 1 | $ - 0 | $ - 0 |
| 3.13 | Fast Rescue Boat Davit Inspection – Year 5 | JOB | 1 | $ - 0 | $ - 0 |
| 3.14 | Engine Overhauls (3512) | JOB | 1 | $ - 0 | $ - 0 |
| 3.15 | Anti-Icing Spool Pipe Replacement | JOB | 1 | $ - 0 | $ - 0 |
| 3.16 | Tank Preservation | JOB | 1 | $ - 0 | $ - 0 |
| 3.17 | DAU Wiring Organizations | JOB | 1 | $ - 0 | $ - 0 |
| 3.18 | Joiner Door Renewal | JOB | 1 | $ - 0 | $ - 0 |
| 3.19 | Watertight Door Replacement | JOB | 1 | $ - 0 | $ - 0 |
| 3.20 | Chiller #2 Compressor Renewals | JOB | 1 | $ - 0 | $ - 0 |
| 3.21 | Mission Hydraulic Cooling Water Piping Redesign | JOB | 1 | $ - 0 | $ - 0 |
| 3.22 | Mission HPU Starter Cabinet Renewal | JOB | 1 | $ - 0 | $ - 0 |
| 3.23 | Stack Vent Louver Installation | JOB | 1 | $ - 0 | $ - 0 |
| 3.24 | Fan Overhauls | JOB | 1 | $ - 0 | $ - 0 |
| 3.25 | SSS & 01 Deck Bunker Station Pipe & Valve Renewals | JOB | 1 | $ - 0 | $ - 0 |
| 3.26 | Dockside Trials | JOB | 1 | $ - 0 | $ - 0 |
| 3.27 | Sea Trails | JOB | 1 | $ - 0 | $ - 0 |
| 4.1 | Dial Telephone & Public Address/General Alarm Systems Upgrade | JOB | 1 | $ - 0 | $ - 0 |
| 4.2 | EK80 System Installation | JOB | 1 | $ - 0 | $ - 0 |
| Total Base Items | $0.00 |
ADDITIONAL ITEMS-GROWTHADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
| SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 5.1/6.1 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 8,000 Unit of Issue: Hour; Extended Price: $____________
| HRS | 8000 | $ - 0 | $0.00 |
| 5.1/6.1 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $133,000.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price:($133,000.00)+ percentage quoted]: $______________ | % | EST $133,000.00 | $ - 0 | $0.00 |
| Additional Temp Services |
(See CAR CLAUSE 1372.271-86)
| EST 1 | DAY | $ - 0 | $0.00 |
| Laydays |
(See CAR Clause 1372.271-89)
| EST 1 | DAY | $ - 0 | $0.00 | |
| Total Growth | $0.00 |
| OPTION ITEMS:Note: These items may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”. | |||||
| SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 7.1 | Main Propulsion Motor Heat Exchanger Renewals | JOB | 1 | $ | $ |
| 7.2 | Outhaul Winch Electric Servo Selector Switch Replacement | JOB | 1 | $ | $ |
| 7.3 | Generator Automation Upgrades | JOB | 1 | $ | $ |
| 7.4 | Gallows Handrail Installation | JOB | 1 | $ | $ |
| 7.5 | Wet Lab SS Sheathing Replacement | JOB | 1 | $ | $ |
| 7.6 | 2 Deck Port Light Removals | JOB | 1 | $ | $ |
| 7.7 | Superstructure Preservation | JOB | 1 | $ | $ |
| 7.8 | Bridge Wing Sheathing Replacement | JOB | 1 | $ | $ |
| 7.9 | Digital Tach Display Installation | JOB | 1 | $ | $ |
| 7.10 | Work Boat Davit Removal | JOB | 1 | $ | $ |
| 8.1 | Bridge Gyro System Replacement | JOB | 1 | $ | $ |
| 8.2 | GMDSS MF-HF Radios & GMDSS Inspection | JOB | 1 | $ | $ |
| 8.3 | OLEX Processor Upgrade | JOB | 1 | $ | $ |
| Total Option Items | $0.00 |
| BASE + OPTIONS | $0.00 |
| BASE + OPTIONS +GROWTH | $0.00 |
&KFF0000REGION 3, TORFP 002
D 6 Pricing Schedule
File details come from the government source that posted it. Updated .