HENRY BIGELOW FY23 DRYDOCK REPAIRS
Solicitation number
1305M222QNMAN00702
Issued by

About this file

This document outlines specifications for drydock repairs to the NOAA research vessel Henry B. Bigelow. The specifications include basic items, additional work items, and optional items to be completed during drydocking. Requirements include temporary services, drydocking, hull cleaning and inspection, engine overhauls, watertight door and joiner door replacements, liferaft inspections, fire suppression system work, and other vessel maintenance, repairs and upgrades. The work will be conducted by the Department of Commerce National Oceanic and Atmospheric Administration.

Key specifications include temporary services such as electrical power, potable water and internet access required at the contractor's facility during drydocking. Drydock and hull work includes blocking, cleaning, hull inspection and preservation. Engine overhaul requirements are defined for the vessel's two SSDG diesel engines. Additional specifications cover cathodic protection system inspection and anode replacement, rudder and steering gear maintenance, and other items such as watertight door, fan, and piping replacements needed to prepare the vessel for future research missions.

View the file

Other files

File Type Posted
Amendment A0004.pdf PDF
Amendment A0003.pdf PDF
HB-162-001 Stack Vent Louver Installation REV P2.pdf PDF
HB-612 FH88 Handrails Liferails Lifelines Key Plan Details.pdf PDF
Amendment A0002.pdf combined.pdf PDF
HB-512 FV04 Fan List.pdf PDF
HB-110 FH04 Hull Sternbody Scantlings FR. 49 - FR. 82 (1).pdf PDF
HB-324 FE09 Switchboards Diagram _ Arrangement.pdf PDF
HB-624 FE70 Impressed Current Cathodic Protection Arr DET Mod.pdf PDF
HB-611 FH87 Windows _ Portlight Key Plan _ Schedule.pdf PDF
HB-432 FE58 Interior Communication Block Wiring Diagram.pdf PDF
HB-438 FE81 IBS System Block Wiring Diagram.pdf PDF
HB-461 FE93 Transducer Arrangement and Installation.pdf PDF
HB Life Raft Certifications - January 2022.pdf PDF
Attachment D1 FY23 Henry Bigelow Dry Dock Repair Specification - Rev. 1 ( dated July 2022.pdf PDF
HB-163 FP19 Seachest Diagram (1).pdf PDF
HB-438-FE81-013-01.pdf PDF
HB-631 FF04 Paint Schedule.pdf PDF
HB-562 FM02 Rudder Arrangement.pdf PDF
ATTACHMENT D6 Pricing Schedule HB DD FY23-Rev.1.xlsx XLSX spreadsheet
HB-432 FE58 Interior Communication Block Wiring Diagram (1).pdf PDF
HB-438- FE81-012-01.pdf PDF
HB-985 FA05 Fire Control Plan.pdf PDF
HB-556 FP09 Hydraulic Diagram.pdf PDF
HB-640 FA27 Joiner Arrangements.pdf PDF
HB-602 FH60 Hull Designation _ Markings.pdf PDF
FE81_IXBlue Gyro.pdf PDF
Amendment A0001 SF30 HB DD.pdf PDF
Amendment A0001 SF30 HB DD.pdf PDF
ATTACHMENT D3 Past Performance Questionnaire.doc DOC document
Miscellaneous-20220712T174338Z-001.zip ZIP file
ATTACHMENT D5 Pricing Schedule HB DD FY23.xlsx XLSX spreadsheet
RFQ HENRY BIGELOW DRYDOCK REPAIRS FY23.pdf PDF
ATTACHMENT D2 Past Performance Information Form.docx DOCX document
ATTACHMENT D4 U S DOL POSTER.pdf PDF
drive-download-20220712T173136Z-001.zip ZIP file
Tech Manuals-20220712T174547Z-001.zip ZIP file
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA SHIP HENRY B. BIGELOW (R225)

FY 2023

Dry Dock REPAIRS

DETAIL SPECIFICATIONS

March 2022 Rev -

NOAA - Port Office Northeast Marine Support Facility

166 Water Street Woods Hole, MA 02543

NOAA Ship Henry B. Bigelow FY23 Dry Dock Repairs March 2022 – Rev -

Table of Contents

1. Scope

2. General

3. Basic Items – ORF 10000

3.1 Temporary Services

3.2 Drydocking and Routine Drydock Work

3.3 Zinc Renewals

3.4 Cathodic Protection System Inspection & Replacement

3.5 Underwater Body Coating

3.6 Rudder and Steering Gear Actuator Overhauls

3.7 Freeboard Preservation

3.8 Net Reel and Gilson Winch Overhauls

3.9 ABS Surveys

3.10 Trawl Winch Room Escape Hatch Cover Renewal

3.11 Portable and Fixed Fire Extinguishers Inspection

3.12 Liferaft Annual Inspection/Test Certificate

3.13 Fast Rescue Boat Davit Inspection – Year 5

3.14 Engine Overhauls (3512)

3.15 Anti-Icing Spool Pipe Replacement

3.16 Tank Preservation

3.17 DAU Wiring Organizations

3.18 Joiner Door Renewal

3.19 Watertight Door Replacement

3.20 Chiller #2 Compressor Renewals

3.21 Mission Hydraulic Cooling Water Piping Redesign

3.22 Mission HPU Starter Cabinet Renewal

3.23 Stack Vent Louver Installation

3.24 Fan Overhauls

3.25 SSS & 01 Deck Bunker Station Pipe & Valve Renewals

3.26 Dockside Trials

3.27 Sea Trials

4. Basic Items – PAC 20000

4.1 Dial Telephone & Public Address/General Alarm Systems Upgrade

4.2 EK80 System Installation

5. Additional Work Items – ORF 30000

5.1 Additional Work Requirements (AIR/Growth)

6. Additional Work Items – PAC 40000

6.1 Additional Work Requirements (AIR/Growth)

7. Option Items – ORF 50000

7.1 Main Propulsion Motor Heat Exchanger Renewals

7.2 Outhaul Winch Electric Servo Selector Switch Replacement

7.3 Generator Automation Upgrades

7.4 Gallows Handrail Installation

7.5 Wet Lab SS Sheathing Replacement

7.6 2 Deck Port Light Removals

7.7 Superstructure Preservation

7.8 Bridge Wing Sheathing Replacement

7.9 Digital Tach Display Installation

7.10 Work Boat Davit Removal

8. Option Items – PAC 60000

8.1 Bridge Gyro System Replacement

8.2 GMDSS MF-HF Radios & GMDSS Inspection

8.3 OLEX Processor Upgrade

9. Appendix

9.1 Standard Specifications

9.2 Drawings

9.3 Tech Manuals

9.4 Government-Furnished Equipment

9.5 Miscellaneous

1. Scope

1.1 These detailed specifications contain requirements for NOAA Ship Henry B. Bigelow (R225) FY23 Dry Dock Repairs.

1.2 Scope and Intent of the Drydock or Dockside Ship Repair

Contract

1.2.1 The National Oceanic and Atmospheric Administration

(NOAA) operates a fleet of research vessels that supports research and mapping for the National Fisheries Service, National Ocean Service, Office of Atmospheric Research and the National Weather Service, as well as provides support to other Federal agencies. These research missions are time sensitive and therefore the data must be collected at specific times during the sailing season to be meaningful. At the end of each sailing season the vessels enter a repair period (drydock or dockside) to address repairs that have been previously identified, perform upgrades to mission systems or ship systems that either extend the life of the ship or provide new data collection capabilities or for safer operations of ships systems as well as address any emergent work that would adversely affect the ships ability to safely perform its mission on schedule, while meeting all regulatory body requirements (American Bureau of Shipping and United States Coast Guard) and all habitability requirements, including any that may be required as a result of contracts for personnel to augment ship staff. The work items in the repair specification are identified well in advance of the performance period in order meet the contracting lead times.

Additional work items (emergent work) may arise during the period between the work package submittal, contract award, or even prior to the start of or during the contract performance period. In accordance with Commerce Acquisition Regulation (CAR) clause 1352.271-72, the Contracting Officer may order additional changes during the contract period of performance to address any additional work items identified as necessary to ensure the intent of the drydock or dockside repair contract is met; that is, that the vessel shall be able to safely perform its mission, that it will meet all habitability requirements and regulatory body requirements, and that such repairs will be timely performed to ensure to the maximum extent practicable that the ship's schedule is not adversely impacted.

2. General

2.1 References

2.1.1 NOAA Standard Specification 00 00 01.07, “General

Requirements”

2.1.2 NOAA Standard Specification MOC-631-2D, “Coating

Systems for Steel Surfaces”

2.1.3 NOAA Drawing HB-085 FA02, “General Arrangements”

2.1.4 NOAA Drawing HB-631 FF04, “Painting Schedule”

2.1.5 NOAA Drawing HB-085 FF01, “Insulation Arrangement”

2.1.6 SECNAV Form 5512-NSNPT

2.2 Requirements

2.2.1 References 2.1.1 through 2.1.5 form a part of these

Detail Specifications. All provisions and requirements contained therein are applicable to all work items, including all additional work items, which are authorized by the Contracting Officer. All work procedures and all materials shall meet ABS Rules.

2.2.2 Unless otherwise stated in these work items, prepare

and coat all new steel, disturbed steel, or otherwise required painted surfaces in accordance with References 2.1.2 and 2.1.4.

If no paint system is identified in the item, then apply the appropriate coating system similar to the area being coated as identified in Paragraph 5.2 of Reference 2.1.2 except that the top coat shall match the surrounding area

2.2.3 There are areas on the ship (mainly in the engine

compartments but not solely) that has lead septum (sheathing) in between the insulation on the bulkheads and overheads.

2.2.4 Provide an electronic copy of all Condition Reports in

Adobe Portable Document Format (.pdf).

2.2.5 The NOAA Ship Henry B. Bigelow, ABS ID Number

06142681, is a fully ABS classed ship. An ABS surveyor will be required for some of the work items on this specification. The contractor shall provide (schedule) the services of the local ABS Surveyor as required by ABS to retain the ship in ABS class during the accomplishment of this specification. Provide a copy of ABS approved welding procedures and a list of currently ABS qualified welders. NOAA will pay for all ABS surveys using a Blanket Purchase Agreement associated with work required by these specifications. The Contractor shall provide a credit for any additional ABS charges associated with rescheduling of surveys and rework surveys which are directly under the control of the Contractor.

2.2.6 Provide a copy of ABS approved welding procedures and

maintain a list of currently ABS qualified welders. This list must be provided prior to any welding on the ship.

2.2.7 The contractor shall provide adequate ventilation

(exhaust) in all areas where hot work (grinding, welding, etc.)

occurs on the ship to ensure that all smoke and airborne debris are removed from the interior spaces of the ship.

2.2.8 Weigh all materials and items removed, installed, or

relocated on the ship. Provide a summary report to the COR indicating the total weight in pounds of the materials and items with a breakdown of their locations by space, deck, frame, distance from centerline, and height off of the deck. A sample Weight Report form is attached to these specifications.

2.2.9 Redline “as-built” drawings for modifications

accomplished by these detail specifications.

2.2.10 Electrical power distribution systems available aboard the ship for Contractor power tools include 480vac via three submersible pump receptacles and 120vac receptacles throughout the ship. If the ship’s electrical systems noted above are not adequate to support the contractor then the contractor is responsible for providing additional electrical services, as needed, to complete all work on this contract.

2.2.11 The Contractor shall minimize shipboard work and

inspections requiring ship’s force and COR presence on December 23 and 30, 2022. Shipboard work may include mechanical tools and light industrial work. The Contractor shall not schedule nor conduct any shipboard hot work during these periods. The contractor shall not conduct any shipboard work on December 26, 2022 or January 2, 2023 as they are considered Federal Holidays.

2.2.12 Vehicle and personnel access to NOAA Ship Henry B.

Bigleow for pre-bid inspections and all work is restricted via gated security. Naval Station Newport requires all personnel needing access onto the base to be vetted prior to entering the base by filling out SECNAV Form 5512-NSNPT, see reference 2.1.6.

All contractors, vendors, and visitors are required to make pre-arrival arrangements for access by submitting SECNAV Form 5512- NSNPT at a minimum of 14 days in advance of the pre-bid inspection date to the Port Engineer via email at kenneth.d.marston@noaa.gov. The port engineer can be reached with any additional questions at 508-642-3986.

2.2.13 The pre-bid inspection will be held at Naval Station

Newport – Pier 2, 68 Peary Street, Newport, RI unless otherwise noted in the solicitation. Pre-bid inspection date is 07/12/2022.

2.2.14 Metrication

a. A combination of Standard English units of measure (feet – pounds) and Metric System International (SI) units of measure (millimeter - kilogram) were used in the builders' drawings, specifications and reference materials for construction, operation, maintenance and repair of this ship.

In this specification for NOAA Ship Henry B. Bigelow, there is a combination of Standard English units and metric units.

2.3 Notes

2.3.1 Descriptive data of NOAA Ship Henry B. Bigelow:

Length Overall: 208.6 feet Beam (Molded): 49.2 feet Displacement: 1,840 metric tons Light Ship

2,479 metric tons Full Load Draft: 20.35 feet Full Load Centerboard

Retracted

29.7 feet Full Load Centerboard Extended mailto:kenneth.d.marston@noaa.gov

Cruising Speed: 12 knots [Max speed 14 knots] Propulsion: Diesel Electric, Single Propeller, Fixed Pitch, with two, in-line 1508 Hp DC Motors

Generators: Caterpillar 3508B, 3512B (two each) 600 volts AC

Bow Thruster: Elliott 40T3S, 360 Degree Electric Service: 480 volts AC Year Built: Commissioned July 2006 Builder: VT Halter Marine Inc., Moss Point, MS

ABS ID: 06142681

IMO Number: 9349057 Construction: Welded Steel Hull, Aluminum

Superstructure Crew size: 22 Bunks: 39 Homeport of Record: Newport, RI

3. Basic Items – ORF 10000

3.1 Temporary Services

3.1.1 Intent

a. Provide all labor, material and equipment for Temporary Services at the Contractor’s Facility.

3.1.2 References

a. NOAA Standard Specification AMC-000-2C, “Temporary Services at Contractor Facilities”

3.1.3 Government-Furnished Material

a. None

3.1.4 Requirements

a. Provide temporary services required in accordance with Reference (a) with shore connection details and additional requirements as follows for the entire performance period:

1. Electrical Shore Power --- Two (2) circuits rated for 480 VAC, 3-Phase, 60-Cycle, 400-Amp continuous service each (800 amps total). The ship’s shore power plugs (2 total) are NATO-standard plug (MIL-C-24368) receptacles located on the 01- Deck aft connection box.

2. Potable Water --- One 1-1/2 inch hose providing a minimum of 100 gallons per minute in a range of 40 to 60 psi.

3. High-Speed, Broadband Internet Connectivity --- Internet connections via local Internet Service Provider (ISP).

High-speed, broadband internet is defined as Digital Subscriber Service (DSL) or cable internet service with typical minimum download speeds of 200 Mbps. The service shall be a business-type account that supports VPN connections and shall include necessary DSL or cable modem provided by the ISP. Provide one high speed connection to the ship. The ship’s connection shall be available while the ship is dockside and while the ship is in the dry dock.

4. Sanitary and Cooling Water --- One 2-1/2 inch hose providing a minimum of 150 gallons per minute in a range of 45 to 60 psi.

5. Sewage Disposal --- One 3-inch cam lock quick-disconnect fitting and hose.

6. Garbage --- One dumpster on the fantail or near the stern of the ship on the pier.

7. Vehicle Parking Spaces --- A minimum of six spaces inside the gate, near the dockside office spaces or the ship, plus a minimum of six more spaces outside the gate.

8. Security --- Security services to make rounds of the ship hourly [this is an increase from every two hours required in reference (a)] on weekdays from 1600 – 0800 and on weekends and federal holidays from 1600 Friday to 0800 Monday.

9. Engine Room Bilge Cleaning --- In addition to disposing of oily water in engine room bilges in Reference (a), pump out and dispose of an estimated 1200 gallons of waste oil from waste oil tank 4-47-1 and an estimated 1200 gallons of oily water from oily water tank 4-47-2. Access these tanks through manhole covers in Engineers Workshop 3-39-01 and Auxiliary Machinery Room 3-39-01. After pumping out these tanks, and after any other work required to be done to these tanks by the work requirements, close access covers with new gaskets.

10. Crane Service --- Provide crane services and rigging services on an as-needed basis for an estimated total of twenty (20) hours for loading or offloading ship’s equipment and loading ship’s stores. Crane loads are estimated not to exceed to 5,000 pounds. Provide the COR with a procedure to request crane services with nominal four hours advance notice. If additional crane service is needed beyond estimated twenty (20) hours, then the COR will provide an additional item request (AIR) to the Contracting Officer for negotiated contract modification.

11. Fast Rescue Boat --- Remove the fast rescue boat from the ship once it is in the dry dock and store in a secure location until the ship is ready to come out of the dry dock or when approved by the COR.

3.1.5 Quality Assurance

a. COR Inspection.

3.1.6 Notes

a. Steam is not required.

END OF ITEM

3.2 Drydocking and Routine Drydock Work

3.2.1 Intent

a. Provide all labor, material and equipment to perform the intermediate drydocking of the ship, cleaning the hull, inspecting underwater body portions of the hull, and refloating the ship.

3.2.2 References

a. NOAA Standard Specification AMC-997-1A, “Drydocking and Routine Drydock Work”

b. NOAA Drawing HB-085 FA04, “Docking Drawing”

c. NOAA Drawing HB-100 FH02, “Hull Forebody Scantlings FR

0 – FR 18”

d. NOAA Drawing HB-100 FH05, “Hull Transom Scantlings FR 82 – Transom”

e. NOAA Drawing HB-110 FH03, “Hull Midbody Scantlings FR

19 – FR 49”

f. NOAA Drawing HB-110 FH04, “Hull Sternbody Scantlings

FR 49 – FR 82”

g. NOAA Drawing HB-461 FE93, “Transducer Arrangement and Installation”

h. NOAA Drawing HB-163 FP19, “Sea Chest Diagram”

i. NOAA Tech Manual HB-244 (FRV40-225-006-010), “Stern Tube Bearing (Thordon Compac) and Shaft Seal (Kobelco)”

j. NOAA Tech Manual HB-562 (FRV40-225-071-010), “High Performance Flap Rudder, Willi Becker”

k. Naval Ships’ Technical Manual Chapter 081, “Waterborne

Underwater Hull Cleaning of Navy Ships”

l. NOAA Docking Report S0700/SWB997

3.2.3 Government-Furnished Material

a. None

3.2.4 Requirements

a. Provide dry docking and routine dry dock work in accordance with Reference (a) and the following:

1. Dry dock the ship within 72-hours of ship’s arrival at the contractor’s facility.

2. Provide a tug(s) to assist in bringing the ship from the pier into the dry dock and to remove the ship from the dry dock to the pier. The tug(s) shall be of sufficient size to easily control the ship to/from the dry dock.

3. Use Reference (b) blocking position 1. Keel block heights shall not be lower than the heights shown on reference (b) to allow for access to transducers and centerboard. Use References (c) through (f) as guides. The blocking must be done as shown on Reference (b) with the aft keel blocks lower than the forward keel blocks. This allows the decks to drain when the ship is on the blocks. Having all the keel blocks being the same height will not be accepted.

4. After positioning and before hauling the ship, conduct a diver’s inspection of underwater keel block positions relative to hull mounted transducers and associated fairings to verify that keel blocks will not come in contact with these fixtures.

5. Ensure that all transducers (hull mounted and centerboard mounted), the 3 temperature probes on starboard side of the ship near frame 38 and the anti-foulant reference cells and anodes, located between frames 24-25 and 81-82 port/starboard sides (4 total) are covered in accordance with Reference (a), paragraph 3.11.6, prior to cleaning the ship’s hull via high pressure spray. Use Reference (g) as a guide for the locations of all the hull mounted and centerboard mounted transducers. DO NOT SPRAY ANY TRANDUCER FACES OR WINDOWS WITH

HIGH PRESSURE SPRAY.

6. While the ship is in drydock, clean each transducer, including centerboard transducers, face or window from the hull bottom using a normal, mild, synthetic soap, water and a soft bristle brush. Only under extreme conditions use a piece of dull wood or very fine grade sand paper (by hand).

a) Do not use strong solvents,

b) Do not attempt to scrape with sheets of metal, screwdrivers or other metallic tools,

c) Do not use high pressure water to clean the transducers or windows.

7. Carefully inspect each transducer, transducer window, mounting hardware and seals for evidence of cracks, scrapes, blistering, corrosion or other anomalies that would indicate an unsound unit. Notify the COR immediately should any of these conditions are found.

8. Photograph and submit a report to the COR on each transducer and window cleaned. Photos should provide enough detail to clearly see the details of each transducer or window surface. Report should include transducer name, location, and condition remarks.

9. All transducers are installed through to the hull in the Transducer room (4-23-0) located between frames 23 and 29, reference 2.1.3. The transducers and types are arranged as outlined in reference (b) and listed in table 3.2.1. All acoustic windows are ¾ inch Plexiglas.

Table 3.2.1: Transducers

Item Equipment Name Manufacturer Model Type

1 Self Noise Hydrophone (a), (b) and (c)

Removed

2 Ship's Depth Finding Transducer

Furuno CA50B-68

/ FE-700

Face

3 Speed Log Transducer Sperry Marine SRD 500 Face

4 Electromagnetic Speed Log Transducer

C.Plath NAVIKNOT

III

Face

5A Acoustic Doppler Current Profiler (ADCP) Transducer

RDI (Ocean Surveyor)

ES 18 Window

8 Fish Finding Transducer Simrad 50/200 D Face

9A Multibeam Sonar Kongsberg EM2040 Face

10 Passive Sonar Transducer

AIRMAR 41065-1-

Face

15 ME-70 Transducer Simrad ME-70 Face

b. Inspect all other shell plate openings listed on references (b), sheet 6, and (h). Provide results on a condition report.

c. Measure and record stern tube bearing wear down readings, specifically the shaft-to Thordon stern tube bearing clearance in accordance with reference (i).

d. Inspect rudder sections to the extent possible without removing rudder welded access plates in accordance with reference (j). Remove bolted covers or obstructions, measure Neck Bearing, Rudder Hinge, Link System slide bolt to slide bushing clearance, completing the BEARING CLEARANCES table in reference (j). Perform an inspection of the rudder with COR, providing for a man-lift or scaffolding to reach all rudder areas. Provide results on a condition report. Notify ABS surveyor of availability for inspection.

e. In addition to feeler gage measurements of bearing/shaft/pin clearances taken above, perform a test of the rudder and the rudder flap clearances by jacking the rudder forward, aft, port and starboard to determine amount of travel at a convenient location to attach dial indicator measuring travel of the rudder with respect to the hull. Measure and record travel and dial indicator location(s) on a condition report.

f. Remove rudder and rudder flap drain plugs and inspect for water leakage into the rudder and flap. Renew and reinstall plugs upon receipt of condition report response.

g. Inspect existing hull mounted zincs for wastage.

These are nominal 23 pound bolted strap type measuring 1-1/4 inch x 6 inch x 12 inch. Check all bolts for tightness. Record condition and location of zincs to document existing conditions and determine cathodic protection system effectiveness. Ships designed zinc anode quantities and locations are as follows:

1. 32 zincs in Bow Thruster Tunnel,

2. 06 zincs in Port Sea Chest,

3. 06 zincs in Starboard Sea Chest.

h. Remove void drain plugs listed below and inspect for water intrusion. Record results on a condition report. Fill and drain or float coat voids and rudder with rust preventive compound complying with MIL-C-16173, Grade 5, or Eureka Fluid Film Liquid A or equal. Reinstall void drain plugs using ABS approved thread anti-seize sealant on all plugs:

1. Skeg drain plug frame 87-88 starboard,

2. Aft stern tube structure,

3. Port & starboard bilge keels,

4. Rudder and rudder blade/flap.

i. Clean/polish the propeller blades in accordance with reference (k), section 081-3.3 and Table 081-3-2.

j. After the propeller has been cleaned and polished, contact the COR to inspect the propeller. After COR inspection, protect the propeller with padding to prevent damage until just prior to undocking.

k. Record hull inspection results on reference (l) in lieu of Docking Report form 2410 in reference (a).

l. Two gangways shall be installed on the ship while in the dry dock. One gangway will be towards the forward end of the ship and one toward the aft end of the ship on opposite side of the ship of the forward gangway.

3.2.5 Quality Assurance

a. COR/Ship’s force inspection.

3.2.6 Notes

a. Verify the tank capacities using reference (b).

3.3 Zinc Renewals

3.3.1 Intent

a. Provide all labor, material and equipment to renew forty-four existing zinc anodes.

3.3.2 References

a. NOAA Drawing HB-085 FA04, “Docking Drawing”

b. NOAA Drawing HB-163 FP19, “Sea Chest Diagram”

3.3.3 Government-Furnished Material

a. None

3.3.4 Requirements

a. Renew existing hull mounted zinc anodes. These anodes are nominal 23 pound bolted strap type measuring 1-1/4 inch x 6 inches x 12 inches. Zinc quantity and locations are as follows:

1. 32 in Bow Thruster Tunnel

2. 06 in Port Sea Chest

3. 06 in Starboard Sea Chest

4. 06 in Centerboard Trunk

NOTE: Do not install new anodes until after the ship’s hull has been painted.

3.3.5 Quality Assurance

a. COR inspection.

3.3.6 Notes

a. None

3.4 Cathodic Protection System Inspection & Replacement

3.4.1 Intent

a. Provide all labor, material and equipment to inspect the ship’s cathodic protection system, inspect and tune up the Cathelco antifouling system and replace the copper anodes.

3.4.2 References

a. NOAA Tech Manual HB-633-01 (FRV40-225-011-010), “Cathodic Protection System, Marimpress Model: ICCP 50A”

b. NOAA Drawing HB-624 FE70, “Impressed Current Cathodic Protection Arr. & Det.”

c. NOAA Drawing HB-163 FP19, “Sea Chests Diagram”

d. NOAA Tech Manual HB-633-02 (FRV40-225-139-010), “Cathelco Antifouling System Manual”

3.4.3 Government-Furnished Material

a. Copper TZX27 Anodes, 18 Total

3.4.4 Requirements

a. Provide the services of a Cathelco factory-authorized field service technician to supervise the evaluation and service of ship’s existing Cathelco Antifouling Protection System after the government furnished copper anodes have been replaced and the ship is back in the water.

b. Prior to any work on this item, and before ship is drydocked, conduct an operational test of ship’s cathodic protection system in accordance with Reference (a). Ship’s Force will operate equipment.

c. Inspect the Marimpress Impress Cathodic Protection System (ICCP) controller, reference cells, and anodes in accordance with Reference (a). Locations are as follows; use

Reference (b) as a guide:

1. Controller in Passage 1-7-01

2. Reference Cells at Frame 24-25 (Located inside the port and starboard No. 2 fuel oil tanks)

3. Anodes at Frame 81-82 (Located inside the Shaft Bossing Void)

d. Using a megohmmeter, measure and record resistance readings between each anode and the hull and between the reference cell and the hull. Readings should be greater than 10 megohms.

e. Open, pump out residual fuel, clean, and certify safe for entry Fuel Oil tanks 4-19-1 #2 Starboard and 4-19-2 #2 Port to gain access to Reference Cells.

f. Renew the reference cells in accordance with reference (a). Unbolt and remove covers and inspect Reference Cell cofferdams from inside the hull and inspect for signs of leakage or corrosion. Clean and re-establish coating inside the cofferdam.

NOTE: The inside of the cofferdams are filled with a wax material which will need to be removed to test the reference cells. Renew the wax material after all successful tests have been completed. The cofferdam is currently filled with Re-Gel by Rainbow Technology Corp.

g. Open and certify safe for entry Shaft Bossing Void 4- 78-0 manhole 4-78-2 to gain access to anodes.

h. Renew the anodes (50A) in accordance with reference (a). Unbolt and remove covers and inspect Anode cofferdams from inside the hull and inspect for signs of leakage or corrosion.

Check that anodes are securely fastened to the hull. Check that the mounting stud hole filler is intact. Clean and re-establish coating inside the cofferdam.

NOTE: The inside of the cofferdams are filled with a wax material which will need to be removed to test the reference cells. Renew the wax material after all successful tests have been completed. The cofferdam is currently filled with Re-Gel by Rainbow Technology Corp.

i. Reinstall reference cell and anode cofferdam covers with new gaskets.

j. Close Fuel Oil tanks 4-19-1 #2 Starboard and 4-19-2 #2 Port and renew gaskets.

k. Close out manhole cover 4-78-2 to Boss 4-78-0 and renew gasket.

l. In conjunction with Ship’s force, follow ship’s lockout/tagout procedures to secure all electrical power serving the anodes in the bow thruster compartment and in the engine room main sea chests.

m. Disconnect the wiring to each of the copper anodes in the bow thruster compartment and in the engine room main sea chests.

n. Renew the existing copper anodes with the government furnished copper anodes in the bow thruster compartment (16 total) and the engine room main sea chests (2 total). See References (c) and (d) as guides for the location of the anodes.

When assembling the new anodes in the flange sleeves, place the following over the stud in this order: Insulating washer, steel washer, brass full nut and brass half nut. Tighten each 27mm nut to 70 ft-lbs with a torque wrench. Do not over tighten as the nuts will strip. Renew the flange gaskets. See Figures 1 and .

Figure 1 – Typical Copper Anode

Figure 2 – Section view of installed anode. Gasket and flange fasteners are not shown.

o. Power tool clean the anode flanges and pipe upstands (items 1 and 2 of Figure 2) and preserve each. Polish up the flange mounting sleeve. See Figure 3.

Figure 3 – Flange Mounting Sleeve

p. Rewire each of the anodes.

q. Upon completion of work clear lockout/tagouts.

r. After all work has been completed, and after the ship is refloated, conduct operational tests for manufacturers field service technician to adjust antifouling protection system parameters.

3.4.5 Quality Assurance

a. COR inspection.

3.4.6 Notes

3.5 Underwater Body Coating

3.5.1 Intent

a. Provide all labor, material and equipment to prepare and re-coat the underwater body coating system.

3.5.2 References

a. NOAA Standard Specification MOC-631-3B, “Underwater Body Ablative Coating System”

b. NOAA Drawing HB-631 FF04, “Paint Schedule”

c. NOAA Drawing HB-602 FH60, “Hull Designation and Markings”

3.5.3 Government-Furnished Material

a. None

3.5.4 Requirements

a. The existing coating system is an Ameron Coating System applied during the ship’s last dry docking; therefore all new paint shall be Ameron brand only for compatibility and in conformity with ship’s Paint Schedule.

b. Prepare and coat the entire underwater body, including the centerboard trunk up to the steel/aluminum interface, with a “Maintenance System” in accordance with the requirements in Reference (a) and as follows:

1. Complete all potential structural steel repairs, access cuts, NDT testing, and hull plate inserts below the waterline, in other work items of these specifications, prior to applying the underwater body coating system.

2. Remove all loose (Spot blast) paint which is not tightly adhered to the hull entirely down to near white metal, SSPC-SP-10. Sandsweep all remaining underbody areas to SSPC-

SP7.

3. To those spot blasted areas of the hull, apply a

“Complete System” in accordance with Reference (a). For bidding purposes, the contractor shall assume 8,000 square feet of the ship’s underwater surface area will require this “Complete System”.

c. The complete coating system consists of the following:

1. Two coats, 5.0-6.0 mils DFT each, Amercoat 235 epoxy. The first coat may be any color, but the second coat shall be gray.

2. Three coats, 4.0-5.0 mils DFT each, ABC #3 ablative antifoulant. The first and third coats shall be red and the second coat shall be black.

3. After the last coat of anti-fouling paint has been applied, the underwater body draft marks shall be repainted, with brushes, using Amercoat 229 White in accordance with references (b) and (c).

d. The maintenance coating system consists of the following:

1. To all prepared surfaces that are not spot blasted to near white metal, apply two new coats, 4.0-5.0 DFT each of the same ablative antifoulant as existing (last three coats of one of the complete systems specified above). The first new coat shall be black and the second new coat shall be red, except in the boottopping both new coats shall be black.

3.5.5 Quality Assurance

a. Conduct joint inspection of hull with Ameron Coatings Company representative after hull has been high-pressure water-washed. Provide detailed “Paint Plan” in accordance with Reference (a), paragraph 4.1.2, to COR prior to starting surface preparation.

b. Conduct joint temperature and humidity readings with Ameron Coatings Company representative prior to each coat of paint applied.

c. Verify all transducers, including the three (3) temperature transducers located on the starboard side of the side shell, are protected prior to surface preparation and painting as identified in Reference (a).

d. Conduct joint inspection of Dry Film Thickness with Ameron Coatings Company representative gaging after each coat of paint is applied.

3.5.6 Notes

3.6 Rudder and Steering Gear Actuator Overhauls

3.6.1 Intent

a. Provide all labor, material and equipment to remove and overhaul the rudder and to overhaul the steering gear actuator.

3.6.2 References

a. Tech Manual HB-562 (FRV40-225-071-010), “High Performance Flap Rudder, Model: Becker FKSR”

b. Drawing HB-562 FM02, “Rudder Arrangement”

c. Tech Manual, HB-561 FRV40-225-128-010, “Steering Gear Model 1xSR662”

3.6.3 Government-Furnished Material

a. None

3.6.4 Requirements

a. Rudder and Rudder Stock Removal

1. Provide a Rolls-Royce/Becker service rep for all work on the rudder.

2. Prior to removing the rudder and with the Rolls- Royce/Becker tech rep operate the rudder from hard over to hard over and record the total travel (in degrees) to each side.

Time the rudder from hard over on one side to hard over on the other side and record the results. Time the rudder in each direction. Record hydraulic pressure noted on Rudder actuator pressure gages in both directions. Record motor amps in each direction using amp meter. Prior to locking out Steering system verify, with the COR, that the rudder is in the zero-degree position referencing the angle indicator mounted on the rudder post. Mark the rudder and hull with punch marks after the zero-degree position has been confirmed. Provide the COR with a condition found report of all readings.

3. Prior to removing rudder, record rudder travel and gap at rudder post (internal to the ship) in the FWD/AFT and Port/STBD directions. Measure and record distance top of rudder is from the hull at the location of the rudder post. Provide recorded readings to the COR.

4. In conjunction with Ship’s force, follow ship’s lockout/tagout procedures to secure all electrical power and hydraulics to the steering gear actuator and pumps.

5. Attach temporary padeyes to the hull and rudder.

Remove the Becker high performance flap rudder in accordance with References (a) and (b). When welding pad eyes to the hull do NOT use or attach the welding lead to the rudder as a welding lead grounding point. If any welding is required on the rudder itself, the ground welding lead must be connected directly to the rudder. At no time should any current from welding travel through the rudder, steering, seals, bearings, or bushings.

Record widening pressures and axial pressures on a condition found report and provide the condition report to the COR.

6. Disassemble the joint link system and inspect the slide bar and bushing and the link pin and bushing for wear in accordance with Reference (a), drawing R-2.41573. Renew all bushings.

7. Disassemble the rudder hinge pins and inspect the hinge pins, bushing, wear rings and thrust rings for wear in accordance with Reference (a), drawing R-2.41576. Renew all bushings, wear rings and thrust rings. Polish all pins.

8. Remove the lower cover (PC 18) on Reference (a), drawing R-1.41572.

9. Support the rudder stock and disassemble the sealing assembly shown of Detail Z of Reference (a), drawing R- 41572. Renew the lip seal ring and O-rings.

10. Renew the neck bushing (PC 2) on Reference (a), drawing R-1.41572.

11. Take bearing clearance measurements in accordance with reference (a) and fill in the Bearing Clearances table in Reference (a). Provide a copy of the Bearing Clearances table to the COR.

12. Clean, preserve and lubricate all mechanical parts and areas that will be inaccessible after assembly in accordance with Reference (a) assembly drawing notes and lubricant table.

b. Steering Gear Actuator Overhaul

1. Provide an OEM certified service engineer to overhaul the steering gear actuator (1 total) in accordance with Reference (c) and as follows:

2. Cut out the plate on the stern ramp to allow for the removal of the actuator. Remove the insulation on the underside of the stern ramp and scrap.

3. Remove top cover and raise the rotor for cleaning and inspection.

4. Build up the bottom part off the rotor by renewing the cylinder seals and new bearing.

5. Renew piston seals on the piston and dividing wall.

6. Renew new upper cylinder seals and top bearings.

7. Lower down the top cover after final inspection.

Renew O-rings on top cover.

8. Replace with OEM new rudder angle indicator POTS.

There are two POTS in each junction box located on the back side of the rudder.

9. Replace with OEM new on each Steering Gear HPU;

Directional control valve blocks to include servos, proximity switches, solenoids, flow control and pressure relief valves.

10. Replace with OEM new Steering Gear HPU; motor, pump, seal housing seals and coupling in accordance with Reference (c). Verify alignment between motor and pump on each HPU. The new pumps must be ABS certified. Turn over the old pumps, motors, etc. to the ship.

11. While the rubber post is removed, power tool clean and preserve the area under rudder post actuator. Remove seal cover, ensure grease paths are clear and free. Replace with new OEM seal cover, fasteners, plugs and 3ea. button type grease fittings for greasing the seal and bushing.

12. Replace j-boxes and terminal strips mounted on HPU tank with OEM new non-metal water tight J-boxes.

13. Check the alignment of the rudder and perform an operational test. Check maneuvering time with all pumps.

c. Rudder Installation

1. Renew all gaskets, seals, O-rings and bushings on the rudderstock, rudder hinge pin and joint link system as shown in Reference (a).

2. Reinstall the rudder in accordance with Reference (a).

3. Contact the COR to witness rudder pull up on the rudder stock. Record pull up distance and widening and axial pressures on the table in Reference (a). Pull up pressures are provided on Reference (a), drawing R-1.41547: Nominal 4.7mm;

Minimum 3.8mm; Maximum 5.6mm. Provide the COR with a copy of the pressures and distances. Confirm that the rudder is in the zero-degree position.

4. After installation of the rudder, record rudder travel and gap at rudder post (internal to the ship) in the FWD/AFT and Port/STBD directions. Measure and record distance top of rudder is from the hull at the location of the rudder post. Provide recorded readings to the COR.

5. Weld the two access covers back on the rudder and perform MT or PT on all of the completed welds. Repair all deficiencies, if any. Renew the removed insulation from the underside of the stern ramp.

6. Remove all temporary padeyes and preserve all disturbed steel areas in accordance with Reference 2.1.2 and

2.1.4 using a “Complete System”.

d. After all work has been completed clear Tagouts / Lockouts with Ship’s Force.

3.6.5 Quality Assurance

a. After the rudder has been installed operate the rudder from hard over to hard over and record the total travel (in degrees) to each side. Time the rudder from hard over on one side to hard over on the other side and record the results.

Time the rudder in each direction. Provide the COR with a report of all readings.

3.6.6 Notes

3.7 Freeboard Preservation

3.7.1 Intent

a. Provide all labor, material and equipment to prepare and re-coat the ship freeboard coating system.

3.7.2 References

a. NOAA Drawing HB-111 FH36, “Fendering Details”

b. NOAA Drawing HB-602 FH60, “Hull Designation & Markings”

3.7.3 Government-Furnished Material

a. None

3.7.4 Requirements

a. Take pictures of the entire freeboard (from boot top to the top of the bulwark) area of the ship prior to start of work so that all markings are restored after all preservation work has been completed. NOTE: The last time the ship was dry docked the lower draft marks where not painted on. These lower draft marks must be painted on during this dry docking.

b. Remove the transom fendering and scrap. See reference (a).

c. Spot blast the entire freeboard where necessary to SP- 10 and sandsweep all remaining areas to remove all contamination in accordance with reference 2.1.4.

d. Preserve the freeboard area in accordance with reference 2.1.4; see page 3 of 34 of the drawing. Ensure all draft marks, thruster marks, frame numbers, centerboard marks, ship’s name, Plimsoll marks, NOAA logo, the work “NOAA” and ship’s hull number are painted on in accordance with reference

(b).

3.7.5 Quality Assurance

a. COR inspection.

3.7.6 Notes

3.8 Net Reel and Gilson Winch Overhauls

3.8.1 Intent

a. Provide all labor, material and equipment to remove the net reel and Gilson winch from the ship and overhaul both winches.

3.8.2 References

a. NOAA Tech Manual HB-591-02 (FRV40-225-048-010), “Trawling and Scientific Winch System, Operating Manual, Rapp Hydema”

3.8.3 Government-Furnished Material

a. None

3.8.4 Requirements

a. In conjunction with Ship’s Force, follow ship’s Lockout and Tagout Procedures to secure/de-energize the Net Reel and Gilson Winch hydraulics.

b. Provide a MacGregor (formerly Rapp Marine) to assist with the overhaul of the winches. Use reference (a) as a guide.

c. Gilson Winch

1. Remove the Gilson Winch from the ship and transport to environmentally control space for overhaul.

2. Remove the three (3) hydraulic motors from the winch and overhaul the motors. Renew all O-Rings, bearings, gaskets, etc.;

3. Renew all bearings, O-rings, gaskets , etc. in the gearbox;

4. Renew the brake band liner;

5. Renew the brake cylinder;

6. Overhaul the control valve;

7. Renew the foundation bolts;

8. Renew the gear oil;

9. Blast and paint the winch, foundation and the deck area inside the foundation. Preserve all steel areas of the winch including the winch hydraulic motors, gearbox, brake band, etc. The top coat shall be black on the winch.

d. Net Reel

1. Remove the Net Reel from the ship and transport to environmentally control space for overhaul.

2. Remove the three (3) port and three (3) starboard hydraulic motors (6 motors total) from the winch and overhaul the pumps. Renew all O-Rings, bearings, gaskets, etc.;

3. Renew all bearings, O-rings, gaskets , etc. in the gearbox;

4. Renew the brake band liners;

5. Renew the brake cylinders;

6. Overhaul the control valves;

7. Renew the foundation bolts;

8. Renew the gear oil;

9. Blast and paint the winch, ship’s superstructure in way of the net reel flanges that are inaccessible when the net reel is in place, net foundations and the deck area inside the foundations. Preserve all steel areas of the net reel including the hydraulic motors, gearboxes, brake bands, etc.

The top coat shall match the existing color.

e. After all connections are free of leaks wrap all hose end fittings with cloth impregnated anti-corrosion grease tape.

f. Clear all Tagouts / Lockouts with Ship’s Force.

3.8.5 Quality Assurance

a. With the assistance of ship’s force, perform an operation test of the net reel and Gilson winch.

3.8.6 Notes

3.9 ABS Surveys

3.9.1 Intent

a. Provide all labor, material and equipment to assist the local ABS Surveyor in completing the required ABS Surveys.

3.9.2 References

a. Chart: Tank Capacity Summary

3.9.3 Government-Furnished Material

a. None

3.9.4 Requirements

a. The contractor is responsible for the disposal of all liquid remaining in the fuel tanks at or below the low suction pipe in each tank. Typically there will be less than 100 gallons of fuel left in each tank.

b. The contractor is responsible for the disposal of all liquids generated in the cleaning of all tanks that are opened for inspection.

c. Any fuel oil, lube oil or hydraulic oil removed from the ship and stored for reinstallation into their respective tanks shall be pumped back onto the ship via a 10 micron filter unless otherwise approved by the COR.

d. The following tanks are to be pumped down, opened, cleaned and certified safe for entry by personnel in accordance with Reference (a). ABS to perform an inspection of each tank.

When closing tanks, renew gaskets, chase threads and clean thread sockets.

Tank Designation Location

No. 2 Center Fuel Oil FRS 19-23

Tank Designation Location

Day Tank, Port Fuel Oil FRS 72-78

Forepeak Ballast FRS D-7

No. 3, Port Ballast FRS 29-39

No. 3, Center Ballast FRS 34-39

No. 3, Starboard Ballast FRS 29-39

No. 4, Center Ballast FRS 39-49

e. Perform a load test on the aft A-Frame. The SWL of the A-Frame is 30,400 pounds. The test weight (125% of the SWL) shall be 38,000 pounds.

3.9.5 Quality Assurance

a. COR inspection.

3.9.6 Notes

a. The transfer of fuel oil may be required by ships force to complete this work item and must be taken into account by the contractor. The dockmaster must be involved to ensure that ships stability is not compromised during this process.

All fluids in the tanks will be returned to the pre-docking levels unless other wised determined by the dockmaster.

3.10 Trawl Winch Room Escape Hatch Cover Renewal

3.10.1 Intent

a. Provide all labor, material and equipment to remove the trawl winch room escape hatch cover and replace with new.

3.10.2 References

a. None

3.10.3 Government-Furnished Material

a. None

3.10.4 Requirements

a. Remove the trawl winch room escape hatch cover located on the aft main deck, starboard side, and provide and install a new cover. The cover spring, spring hinges and hatch cover gasket shall also be renewed. The existing coaming for the hatch cover shall not be replaced. The existing cover is 34 inches by 34 inches on the exterior. The interior dimensions of the coaming is 32 inches by 32 inches.

b. Crop off the tab to bar the hatch open from the existing cover and install on the new cover.

c. Adjust the new hatch dogs to securely close the hatch and make watertight.

d. Adjust the new hatch spring to allow for easy opening/closing of the hatch.

e. The new hatch shall be painted and stenciled like the existing hatch in the interior and exterior. See Figures 1 and

2.

Figure 1: Hatch Cover Exterior

Figure 2: Hatch Cover Interior View

3.10.5 Quality Assurance

a. Chalk test the gasket to ensure complete contact all around the gasket. Adjust if necessary to ensure complete contact.

3.10.6 Notes

3.11 Portable and Fixed Fire Extinguishers Inspection

3.11.1 Intent

a. Provide all labor, material and equipment to perform the annual inspection and certification of the fire system.

3.11.2 References

a. NOAA Drawing HB-985 FA05, “Fire Control Plan”

b. Fire System Inventory (01-05-22)

3.11.3 Government-Furnished Material

a. None

3.11.4 Requirements

a. Do not start on this item until January 2023.

b. All systems and equipment shall be maintained in accordance with requirements as set forth by the OEM, United States Coast Guard (USCG), American Bureau of Shipping (ABS), Code of Federal Regulations (CFR), Department of Transportation (DOT), Occupational Safety and Health Administration (OSHA), National Institute for Occupational Safety and Health (NIOSH), Mine Safety and Health Administration (MSHA), and National Fire Protection Association (NFPA), Underwriters Laboratories (UL), and Factory Mutual Research Corp (FM) as applicable.

c. Servicing technicians for the SCBAs must be covered by a current ABS certificate for Self-Contained Breathing Apparatus Servicing Firms. Provided a copy of the certificate.

d. Repairs on SCBAs shall be accomplished by an OEM authorized repair facility.

e. Servicing technicians for the firefighting equipment and fire detection system must be covered by a current ABS certificate for Fire Extinguishing Systems Inspection/Maintenance Firms. Provided a copy of the certificate.

f. Guarantee workmanship and material against defects for twelve months. Authorized repairs or replacements will be approved within a reasonable time after written notice that the goods are deemed to be defective.

g. Submit a condition report consisting of a detailed list of necessary replacement parts and repairs not already identified.

h. Ensure that any spaces which have CO2 release alarms tested, are safe for entry after thorough ventilation.

i. Coordinate servicing with the local ABS Surveyor as required by ABS.

j. Reports, Tests, Evaluations

1. Inspect and test all fire systems on board the vessel including all:

a) Time delays,

b) Sirens,

c) Heat detectors,

d) Smoke detectors,

e) Pressure switches,

f) Remote pull boxes,

g) Control alarm panels,

h) Two Galley roller doors.

2. Inspect and test the Gaylord Hood Fire Suppression System. Renew all fusible links.

3. Inspect all (fixed & portable) fire extinguishers (CO2, ABC, Purple K and Halotron) throughout the vessel to include the Fast Rescue Boat assigned to the vessel.

4. Install monthly inspection tags on each portable fire extinguisher.

5. Inspect, test and return all SCBA units (facemasks, Air Paks and tanks). Refill SCBA tanks after testing. Air Paks consist of regulator, gauge and hoses.

6. Inspect and test H2S alarms located in the MSD flat.

k. Deliverables

1. After completion of all servicing and repairs, provide an ABS approved, completed Marine Certificate of Inspection.

2. Verify and provide redline markup of reference (a), as necessary.

l. Update reference (b) to reflect the latest changes to the equipment in supplied government format (.xls).

3.11.5 Quality Assurance

a. No additional requirements.

3.11.6 Notes

a. The Contractor shall ensure that their company and technicians, whether employed directly or subcontracted, have Certifications/Approvals that are maintained current throughout the period of performance.

3.12 Liferaft Annual Inspection/Test Certificate

3.12.1 Intent

a. Provide all labor, material and equipment for the annual service and recertification of the ships liferafts.

3.12.2 References

a. NOAA Standard Specification AMC-583-1B, “General Requirements for Liferaft Inspections”

3.12.3 Government-Furnished Material

a. Elliot Liferafts, 6 each

b. Switlik Liferaft, 1 each

3.12.4 Requirements

a. Do not start on this item until January 2023.

b. Perform annual servicing/inspection of the seven (7) liferafts listed in Table 1 in accordance with Reference (a) as modified below:

1. Properly dispose of all replaced material.

2. Replacement pyrotechnic signaling devices (including aerial flares and hand held signals) must be within 9 months of the date of manufacture at the time of servicing.

3. Renew all expired SOLAS equipment pack items.

Liferafts without a radar reflector will be affixed with a weather proof label that reads “RADAR REFLECTOR NOT INCLUDED” on the liferaft case near the manufacturers plate.

4. Submit a condition report consisting of a detailed list of necessary replacement parts, not already identified, and repairs for each individual liferaft. Include photographic evidence for any repairs on a liferaft that may exceed $1,000.

5. Guarantee workmanship and material against defects for twelve months. Authorized repairs or replacements will be approved within a reasonable time after written notice that the goods are deemed to be defective.

6. In addition to being an authorized USCG servicing facility, the liferafts must be serviced by Original Equipment Manufacture’s factory certified technicians.

7. All replacement pyrotechnic signaling devices (including aerial flares and hand held signals) must be within 3 months of the date of manufacture when replaced on the life rafts during servicing.

Table 1: Henry B. Bigelow Liferaft Inventory

MFG SIZE SERIAL # MFG DATE LAST 5th

YEAR

NEXT 5th

YEAR DUE

RELEASE

EXPIRATION

ADDITIONAL PARTS

REPLACEMENTS

Elliot 25 5086300200934 Lot 1551 7/2015 2/2019 12/2024 1/23

Elliot 25 5086300200716 Lot 1551 4/2015 2/2019 12/2024 1/23

Elliot 25 5086300200762 Lot 1551 4/2015 2/2019 12/2024 1/23

Elliot 25 5086300200942 Lot 1551 7/2015 2/2019 12/2024 1/23

Elliot 25 5086300200719 Lot 1551 4/2015 2/2019 12/2024 1/23

Elliot 25 5086300200730 Lot 1551 4/2015 2/2019 12/2024 1/23

Switlik 4 P4-2310 3/2006 2/2019 2/2024 N/A

3.12.5 Quality Assurance

a. Provide a copy of all service records, inspection reports, and certificates to the COR in PDF format.

3.12.6 Notes

3.13 Fast Rescue Boat Davit Inspection – Year 5

3.13.1 Intent

a. Provide all labor, material and equipment to perform the year 5 inspection/groom on the fast rescue boat davit.

3.13.2 References

a. Tech Manual HB-583-03 (FRV40-225-093-010), “Rescue Boat Handling System”

b. SOLAS Rescue Boat…