About this file

This is a CAD file attachment related to the Valley Sanitary District (VSD) Campus Master Plan RFP (2025-RFP-009) in California. The file serves as a work-in-progress AutoCAD drawing that provides the site layout and infrastructure details for VSD's main campus. The RFP solicits proposals from qualified engineering and planning firms to develop a comprehensive Campus Master Plan with three conceptual alternatives. The Project focuses on optimizing site functionality, improving accessibility and security, and incorporating sustainability elements including expanded solar infrastructure and covered parking. Key project components include relocation of the Certified Laboratory, construction of a new Office and Training Building, expansion of parking and solar facilities, and general modernization of the existing campus. Deliverables include site planning, conceptual design, renderings, cost estimating, and facilitation of a stakeholder workshop to review proposed alternatives. Final deliverables are due by February 16, 2026, and the selected firm must coordinate closely with VSD throughout the project while adhering to the District's expedited schedule.

The procurement is open to qualified consulting firms with no specific set-aside designations mentioned. Proposers must demonstrate experience in campus planning and engineering design with the ability to manage complex multi-phase projects. The contract will be awarded to a single firm selected through competitive evaluation of proposals. Pricing terms and funding sources are to be determined based on individual proposal submissions and District budget allocations for the planning and design phase.

Other files

File Type Posted
VSD_Campus_Master_Plan_Analysis.pdf PDF
VSD_Campus_Master_Plan_Analysis.pdf PDF
VSD_Campus_Master_Plan_Analysis.pdf PDF
VSD_Campus_Master_Plan_Analysis_RFP.pdf PDF
VSD_Campus_Master_Plan_Analysis_RFP.pdf PDF
VSD_Campus_Master_Plan_Analysis_RFP.pdf PDF
Attachment_C_VSD_WRF_Master_Plan_2025_-_Draft.pdf PDF
Attachment_A_Scope_of_Work.pdf PDF
Attachment_A_Scope_of_Work.pdf PDF
Attachment_F_Geotech_Report_-_Lab_Building_2021.pdf PDF
Attachment_I_50%_Design_Plans_-_11-19-21.pdf PDF
Attachment_K_Lab_Bldg_Schematic_Design_Package_-_4-8-21.pdf PDF
Attachment_D_VSD_Site_CAD_File_-_Work_in_Progress.dwg DWG drawing
Attachment_H_Leighton_Geotechnical_Report_-_11-20-2020.pdf PDF
Attachment_K_Lab_Bldg_Schematic_Design_Package_-_4-8-21.pdf PDF
Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf PDF
Attachment_M_Training_and_Lab_Building_100%_Cost_Estimate_-_11-01-2021.pdf PDF
Attachment_F_Geotech_Report_-_Lab_Building_2021.pdf PDF
Attachment_I_50%_Design_Plans_-_11-19-21.pdf PDF
Attachment_M_Training_and_Lab_Building_100%_Cost_Estimate_-_11-01-2021.pdf PDF
Attachment_E_Earth_Systems_Geotechnical_Report_Jan_2022.pdf PDF
Attachment_M_Training_and_Lab_Building_100%_Cost_Estimate_-_11-01-2021.pdf PDF
Attachment_I_50%_Design_Plans_-_11-19-21.pdf PDF
Attachment_J_Lab_Bldg_Schematic_Design_Cost_Estimate_-_4-19-21.pdf PDF
Attachment_C_VSD_WRF_Master_Plan_2025_-_Draft.pdf PDF
Attachment_E_Earth_Systems_Geotechnical_Report_Jan_2022.pdf PDF
Attachment_K_Lab_Bldg_Schematic_Design_Package_-_4-8-21.pdf PDF
Attachment_C_VSD_WRF_Master_Plan_2025_-_Draft.pdf PDF
Attachment_G_Geotech_Report_for_Lystek_2024-12-11.pdf PDF
Attachment_H_Leighton_Geotechnical_Report_-_11-20-2020.pdf PDF
Attachment_J_Lab_Bldg_Schematic_Design_Cost_Estimate_-_4-19-21.pdf PDF
Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf PDF
Attachment_A_Scope_of_Work.pdf PDF
Attachment_E_Earth_Systems_Geotechnical_Report_Jan_2022.pdf PDF
Attachment_F_Geotech_Report_-_Lab_Building_2021.pdf PDF
Attachment_G_Geotech_Report_for_Lystek_2024-12-11.pdf PDF
VSD_SAMPLE_CONTRACT.pdf PDF
Attachment_G_Geotech_Report_for_Lystek_2024-12-11.pdf PDF
Attachment_H_Leighton_Geotechnical_Report_-_11-20-2020.pdf PDF
Attachment_J_Lab_Bldg_Schematic_Design_Cost_Estimate_-_4-19-21.pdf PDF
Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf PDF
VSD_SAMPLE_CONTRACT.pdf PDF
Attachment_D_VSD_Site_CAD_File_-_Work_in_Progress.dwg DWG drawing
VSD_SAMPLE_CONTRACT.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .