Attachment D - VOC and Paint Booth Equipment R1.pdf

PDF 432 KB Posted

Attached to
VOC Sys Removal & Mod of Paint Booth Ventilation
Solicitation number
W911N2-21-R-0027
Issued by

About this file

This document provides details for the VOC Abatement System Removal and Paint Booth Modification project at Letterkenny Army Depot. The project requires demolition of the existing VOC abatement system, relocation of a building gas line, and modification of connected ventilation systems for four paint booths to make them standalone systems. The modified ventilation systems must include ductwork, supply and exhaust stacks, booth interlocks for the painting process, control panels, sprinklers for ductwork, no loss exhaust stacks, emergency stops, and paint booth controls for ventilation, sprinklers and alarms. The contractor shall provide all labor and materials to install a complete and usable system, including demolition, gas line relocation, and four operational ventilation systems fully integrated with necessary emergency alarms and controls. Roof, building and concrete repairs are also included where required. The solicitation number for this project is W911N2-21-R-0027.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letterkenny Army Depot 4/30/2021

Description Make No. on

Attach. A Equipment Description Booth

Dimensions Supply CFM Exhaust CFM Recirculation

CFM

Pit

Dimensions

Differential Pressure Equipment Status

Booth 61 (Carousel) ABB 1

Open Face Paint Station #1 10 x 20 x 7 6,000

From VOC System NA NA Photohelic

Add exhaust stack and modify ductwork & controls

Booth 61 (Carousel) ABB 1

Open Face Paint Station #2 10 x 20 x 7 6,000

From VOC System NA NA

Add exhaust stack and modify ductwork & controls

Booth 61 (Carousel) ABB 1 IR Tunnel NA NA 1,900 NA NA

Add exhaust stack and modify ductwork & controls

Booth 61 (Carousel) ABB 1 Convection Oven NA NA 5,000 NA NA Use existing system, demo/modify ductwork

Booth 60 ABB 2 Drive Through w/ Pit 60 x 21 x 16 42,000 21,000 x 2 NA 24 x 3.5 x 7 2 Photohelic

Use existing supply & exhaust , modify ductwork, add exhaust stacks, and control system to stand alone.

Booth 59 ABB 3 Drive Through w/ Pit 60 x 22 x 18 48,000 24,000 x 2 NA 24 x 3.5 x 7 2 Photohelic

Use existing supply & exhaust , modify ductwork, add exhaust stacks, and control system to stand alone.

Booth 58 GFS 4 Split Drive Through

Booth 25 x 16 x 18 4,800 4,800 12,000 x 2 2 Magnehelic Use existing supply & exhaust fans

Booth 58 GFS 4 Split Drive Through

Booth 25 x 16 x 18 4,800 4,800 12,000 x 2 2 Magnehelic Use existing supply & exhaust fans ECU Control

Room ABB 5 VOC Abatement System

Control Room NA Remove control panels and conduit back to main electrical breaker

ECU Bag House ABB 6 Bag Filtration Room NA Demo entire building, equipment, and hazardous waste removal

ECU Stack ABB 7 VOC Abatement System

Exhaust Stack NA Demo entire building, stacks, etc.

ECU Wheel House ABB 8

Solvent laden air fan (SLA) and Zeolite Wheel

#1 NA 28,750

Demo wheel, wheel housing, and non-hazardous waste removal

ECU Wheel House ABB 8

Solvent laden air fan (SLA) and Zeolite Wheel

#2 NA 28,750

Demo wheel, wheel housing, and non-hazardous waste removal

ECU Wheel House ABB 8

Solvent laden air fan (SLA) and Zeolite Wheel

#3 NA 28,750

Demo wheel, wheel housing, and non-hazardous waste removal

ECU Wheel House ABB 8

Solvent laden air fan (SLA) and Zeolite Wheel

#4 NA 28,750

Demo wheel, wheel housing, and non-hazardous waste removal

Ductwork ABB 9 RTO Ductwork NA

Remove all ductwork, structural, insulation, etc. Note: Inside and outside. Some ductwork is on the roof.

ECU RTO ABB 10 RTO NA 9,340

Demo all; May be able to sell RTO with LEAD involvement

Attachment D - 350 VOC Abatement System Removal and Paint Booth Modification CIP Project

File details come from the government source that posted it. Updated .