This document provides details for the VOC Abatement System Removal and Paint Booth Modification project at Letterkenny Army Depot. The project requires demolition of the existing VOC abatement system, relocation of a building gas line, and modification of connected ventilation systems for four paint booths to make them standalone systems. The modified ventilation systems must include ductwork, supply and exhaust stacks, booth interlocks for the painting process, control panels, sprinklers for ductwork, no loss exhaust stacks, emergency stops, and paint booth controls for ventilation, sprinklers and alarms. The contractor shall provide all labor and materials to install a complete and usable system, including demolition, gas line relocation, and four operational ventilation systems fully integrated with necessary emergency alarms and controls. Roof, building and concrete repairs are also included where required. The solicitation number for this project is W911N2-21-R-0027.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letterkenny Army Depot 4/30/2021
Description Make No. on
Attach. A Equipment Description Booth
Dimensions Supply CFM Exhaust CFM Recirculation
CFM
Pit
Dimensions
Differential Pressure Equipment Status
Booth 61 (Carousel) ABB 1
Open Face Paint Station #1 10 x 20 x 7 6,000
From VOC System NA NA Photohelic
Add exhaust stack and modify ductwork & controls
Booth 61 (Carousel) ABB 1
Open Face Paint Station #2 10 x 20 x 7 6,000
From VOC System NA NA
Add exhaust stack and modify ductwork & controls
Booth 61 (Carousel) ABB 1 IR Tunnel NA NA 1,900 NA NA
Add exhaust stack and modify ductwork & controls
Booth 61 (Carousel) ABB 1 Convection Oven NA NA 5,000 NA NA Use existing system, demo/modify ductwork
Booth 60 ABB 2 Drive Through w/ Pit 60 x 21 x 16 42,000 21,000 x 2 NA 24 x 3.5 x 7 2 Photohelic
Use existing supply & exhaust , modify ductwork, add exhaust stacks, and control system to stand alone.
Booth 59 ABB 3 Drive Through w/ Pit 60 x 22 x 18 48,000 24,000 x 2 NA 24 x 3.5 x 7 2 Photohelic
Use existing supply & exhaust , modify ductwork, add exhaust stacks, and control system to stand alone.
Booth 58 GFS 4 Split Drive Through
Booth 25 x 16 x 18 4,800 4,800 12,000 x 2 2 Magnehelic Use existing supply & exhaust fans
Booth 58 GFS 4 Split Drive Through
Booth 25 x 16 x 18 4,800 4,800 12,000 x 2 2 Magnehelic Use existing supply & exhaust fans ECU Control
Room ABB 5 VOC Abatement System
Control Room NA Remove control panels and conduit back to main electrical breaker
ECU Bag House ABB 6 Bag Filtration Room NA Demo entire building, equipment, and hazardous waste removal
ECU Stack ABB 7 VOC Abatement System
Exhaust Stack NA Demo entire building, stacks, etc.
ECU Wheel House ABB 8
Solvent laden air fan (SLA) and Zeolite Wheel
#1 NA 28,750
Demo wheel, wheel housing, and non-hazardous waste removal
ECU Wheel House ABB 8
Solvent laden air fan (SLA) and Zeolite Wheel
#2 NA 28,750
Demo wheel, wheel housing, and non-hazardous waste removal
ECU Wheel House ABB 8
Solvent laden air fan (SLA) and Zeolite Wheel
#3 NA 28,750
Demo wheel, wheel housing, and non-hazardous waste removal
ECU Wheel House ABB 8
Solvent laden air fan (SLA) and Zeolite Wheel
#4 NA 28,750
Demo wheel, wheel housing, and non-hazardous waste removal
Ductwork ABB 9 RTO Ductwork NA
Remove all ductwork, structural, insulation, etc. Note: Inside and outside. Some ductwork is on the roof.
ECU RTO ABB 10 RTO NA 9,340
Demo all; May be able to sell RTO with LEAD involvement