Attachment A - VOC Device Project.pdf
PDF 1 MB Posted
- Attached to
- VOC Sys Removal & Mod of Paint Booth Ventilation
- Solicitation number
- W911N2-21-R-0027
About this file
This solicitation requests offers for a turnkey project involving the demolition of an existing VOC abatement system and modifications to the ventilation systems for four paint booths. The project scope includes demolishing the VOC system components and connecting ductwork, relocating a building gas line, and modifying the ventilation systems for booths 58, 59, 60 and 61 to create standalone systems for each booth. The new systems are to include supply and exhaust ductwork, booth interlocks for painting processes, control panels, sprinklers for ductwork, no loss stacks for exhaust stacks, and emergency stops and controls integrated with paint booth controls, sprinklers, and alarm systems. Offerors are to provide all labor, materials, and installation to deliver fully functional and compliant standalone ventilation, painting, fire suppression, and alarm systems for each booth. The solicitation is issued by the Department of the Army Materiel Command Contracting Command located at Redstone Arsenal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A
VOC ABATEMENT SYSTEM DEMO AND PAINT BOOTH
VENTILATION MODIFICATION PROJECT
Notes:
VOC Abatement System = ECU
1. Complete demo (Housings/ductwork 6-10 and equipment)
2. Demo inside of #5, all computers and controls.
3. Demo all connecting ductwork inside and outside (that is not necessary for stand-alone paint booth ventilation).
4. Demo all makeup dampers for ECU
5. Ductwork between #4 and #6 from bag house to rooftop ductwork is to be demo'd.
Notes:
1. Paintbooths 58,59,60,61 ventilation systems shall be modified so that each booth shall be stand-alone.
3. Existing makeup fans and exhaust fans shall be incorporated into each booth's ventilation system.
4. New supply and exhaust ductwork shall be manufactured and installed to create four stand-alone ventilation systems.
AutoCAD SHX Text
MENS
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
VENT
AutoCAD SHX Text
SYS
AutoCAD SHX Text
HAZMAT
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
EMISSIONS
AutoCAD SHX Text
UNIT
AutoCAD SHX Text
(ECU)
AutoCAD SHX Text
DUST COLLECTOR
AutoCAD SHX Text for Booth 50
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
SZ
AutoCAD SHX Text
STEP
AutoCAD SHX Text
DN
AutoCAD SHX Text
PAINT
AutoCAD SHX Text
BOOTH 59
AutoCAD SHX Text
VENT
AutoCAD SHX Text
SYS
AutoCAD SHX Text
BOOTH 58
AutoCAD SHX Text
PAINT
AutoCAD SHX Text
PAINT
AutoCAD SHX Text
BOOTH 60
AutoCAD SHX Text
PAINT CAROUSEL 61
AutoCAD SHX Text B33
AutoCAD SHX Text B34
AutoCAD SHX Text B35
AutoCAD SHX Text A33
AutoCAD SHX Text A34
AutoCAD SHX Text A35
AutoCAD SHX Text A36
AutoCAD SHX Text A37
AutoCAD SHX Text A38
AutoCAD SHX Text A39
AutoCAD SHX Text A40
AutoCAD SHX Text A41
AutoCAD SHX Text A42
AutoCAD SHX Text A43
AutoCAD SHX Text A44
AutoCAD SHX Text A45
AutoCAD SHX Text A46
AutoCAD SHX Text Office 2
AutoCAD SHX Text
BREAK
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
SNACK BAR
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
AutoCAD SHX Text Buff POR Sample
AutoCAD SHX Text
RTO
AutoCAD SHX Text Ductwork
AutoCAD SHX Text Rotor Wheel House
AutoCAD SHX Text Main Stack Area
AutoCAD SHX Text Bag House
AutoCAD SHX Text #1
AutoCAD SHX Text #2
AutoCAD SHX Text #3
AutoCAD SHX Text #4
AutoCAD SHX Text #5
AutoCAD SHX Text #6
AutoCAD SHX Text #7
AutoCAD SHX Text #8
AutoCAD SHX Text #9
AutoCAD SHX Text #10
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .