ATTACHMENT D - QUALITY ASSURANCE SURVEILLANCE PLAN.doc
DOC document 62 KB Posted
- Solicitation number
- 36C10X24Q0395
About this file
This document is a Quality Assurance Surveillance Plan (QASP) that outlines the process for evaluating the contractor's performance under a federal contract. The QASP defines the performance standards, acceptable quality levels, and methods of surveillance that the government will use to monitor the contractor's compliance. It covers services such as emergency repairs, preventive maintenance, and supply of consumables for various copier/multifunction printer equipment. The key details include the roles and responsibilities of the Contracting Officer and Contracting Officer's Representative, the performance metrics and rating scales, and the frequency of measurement and documentation of performance. This QASP is related to a federal contract opportunity for Copier/Multifunction Printer Maintenance services, with a Solicitation Number of 36C10X24Q0395, issued by the Department of Veterans Affairs Strategic Acquisition Center Frederick.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT C 36C10X24Q PRICE COST SCHEDULE.docx | DOCX document | |
| ATTACHMENT A PWS Multfunction Printer Copier Maintenance.pdf | ||
| 36C10X24Q0395_1.docx | DOCX document | |
| ATTACHMENT B_Questions and Answers Template.xlsx | XLSX spreadsheet | |
| 36C10X24Q0395 Combined Synopsis Solicilation - Copier-Printer Maintenance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. Government Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COTR shall keep a quality assurance file. The CO is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
3. Performance Standards Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, paragraph 3.2 in the Performance Work Statement (PWS), includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| Task |
| ID |
| Indicator |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Incentive/ |
Disincentives
Emergency Repairs Paragraph
3.1 and Paragraph 3.2 of the PWS
| 1 |
| Ricoh MP4504 serial# C738B400057 |
| To be performed as Needed |
Maintain equipment in operational order IAW manufacturers specifications
| 95% |
| Inspection upon completion |
| 2 |
| Ricoh MP6503 serial# C069C400124 |
| To be performed as Needed |
Maintain equipment in operational order IAW manufacturers specifications
| 95% |
| Inspection upon completion |
| 3 |
| Ricoh MP3055 MPG serial# C307G400013 |
| To be performed as Needed |
Maintain equipment in operational order IAW manufacturers specifications.
| 95% |
| Inspection Upon Completion |
| 4 |
| Rioch MP 3055 MPG serial# |
C307B900061 To be performed as Needed
Maintain equipment in operational order IAW manufacturers specifications.
| 95% |
| Inspection Upon Completion |
Supply Emergency Repair Parts Paragraph 3.2 of the PWS
| 5 |
| Emergency Repair Parts |
| To be provided as needed to facilitate repairs to |
Maintain equipment in operation order IAW manufacturers specifications
| 95% |
| Inspection Upon Completion |
Respond to Service Calls within 4 hours.
Paragraph 3.3 of the PWS
| 6 |
| 4 Hour Response Time for emergency calls |
| Respond as needed to facilitate emergency repairs. |
| 95% |
| Direct Observation |
Perform Quarterly Preventive Maintenance Paragraph 3.2 of the PWS
| 7 |
| Quarterly Preventive Maintenance |
| To be performed quarterly to maintain equipment operational IAW manufacturers specifications. |
| 98% |
| Inspection Upon Completion |
Supply Consumables (Toner/Staples) Paragraph 3.4 of the PWS
| 8 |
| Provide two toner cartridges per copier initially and one monthly |
| Provide two months toners cartridges per copier initially and monthly thereafter to maintain a 1 toner per copier. |
| 95% |
| Inspection Upon Receipt |
Deliver Consumable Supplies within 24 Hours after receipt of order.
Paragraph 3.4 of the PWS
| 9 |
| Deliver Consumable within 24 hours after receipt of order |
| Monthly deliver consumable supplies 24 hours after receipt of order |
| 95% |
| Inspection Upon Receipt |
4. Methods of QA Surveillance Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. INSPECTION UPON COMPLETION. Items 1-5 and Items 7 inspections will be performed upon completion of requested repairs.
b. DIRECT OBSERVATION. Item 6 will be monitored by direct observation of response time.
c. INSPECTION UPON RECEIPT. Items 7-8 will be monitored by inspecting upon receipt of consumables.
5. Ratings Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Items1-6 and Item 8-9 ACCEPTABLE 95% or above UNACCEPTABLE- less than 95%
Items 7
ACCEPTABLE 98% or above
UNACCEPTABLE – 97% or below
6. DOCUMENTING PERFORMANCE
a. Acceptable Performance The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. Unacceptable performance When unacceptable performance occurs, the COR shall inform the contractor and CO. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
9. Frequency of Measurement
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
File details come from the government source that posted it. Updated .