Attachment D_GLS Administration Building Technical Specifications.pdf
PDF 23 MB Posted
- Solicitation number
- 6923G526R0094
About this file
This is a Technical Specifications document for the construction of a new 10,750 square foot GLS Administration Building and a new 1,900 square foot attached maintenance garage in Massena, New York. The project must comply with the Guiding Principles for Sustainable Federal Buildings and GSA Building Guidelines. The specifications encompass comprehensive divisions covering general requirements, existing conditions, concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, fire suppression, plumbing, HVAC, electrical systems, communications, electronic safety and security, earthwork, exterior improvements, and utilities. Key administrative requirements include submittal procedures through web-based project software and electronic document services, preconstruction and progress meetings, construction progress schedules, quality assurance and testing by independent agencies, and special inspections for steel and concrete construction per ICC and AWS standards. The specifications mandate 50% minimum construction waste recycling, VOC content restrictions on interior products and coatings per EPA and SCAQMD standards, temporary facilities including fencing, security, sanitary facilities, and weather protection, and a comprehensive closeout process with operation and maintenance manuals and materials transparency documentation. Commissioning is required for the building envelope, plumbing systems, HVAC systems, electrical systems including uninterruptible power systems, and electronic safety and security systems. The contractor must provide equipment-specific testing tools and calibrated measuring instruments, with dataloggers and independent monitoring equipment supplied by the Commissioning Authority.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 323119_RV1 Security Fencing and Gates.pdf | ||
| 6923G526R0094 A00006.pdf | ||
| Specification-Echelon II.docx | DOCX document | |
| 6923G526R0094 A00005.pdf | ||
| 6923G526R0094 A00004.pdf | ||
| 2026-09-21 GLS Admin E AD-3.pdf | ||
| 6923G526R0094 A00003.pdf | ||
| Site Visit Sign-In Sheet.xlsx | XLSX spreadsheet | |
| Addendum 9-17-26.zip | ZIP file | |
| 6923G526R0094 QA.xlsx | XLSX spreadsheet | |
| 6923G526R0094 A00002.pdf | ||
| Attachment C_GLS Administration Building Drawings_RV1.pdf | ||
| GLS Administration Building Technical Specifications_Revised Sections 9.03.26.zip | ZIP file | |
| RFP_6923G526R0094_RV1.pdf | ||
| 6923G526R0094 A00001.pdf | ||
| Attachment E_Brand Name Justification_Redacted.pdf | ||
| RFP_6923G526R0094.pdf | ||
| Attachment A_Statement of Work.pdf | ||
| Attachment B_Pricing Sheet.xlsx | XLSX spreadsheet | |
| Attachment C_GLS Administration Building Drawings.pdf | ||
| Attachment F_Davis Bacon WD NY20260116.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Specifications
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 011000 – SUMMARY
SECTION 012500 – SUBSTITUTION PROCEDURES
SECTION 013000 – ADMINISTRATIVE REQUIREMENTS
SECTION 014000 – QUALITY REQUIREMENTS
SECTION 014216 – DEFINITIONS
SECTION 014533 – CODE-REQUIRED SPECIAL INSPECTIONS & PROCEDURES
SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS
SECTION 016000 – PRODUCT REQUIREMENTS
SECTION 016116 – VOC CONTENT RESTRICTIONS
SECTION 017000 – EXECUTION AND CLOSEOUT REQUIREMENTS
SECTION 017419 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 017800 – CLOSEOUT SUBMITTALS
DIVISION 02 – EXISTING CONDITIONS
SECTION 024119 – SELECTIVE DEMOLITION
DIVISION 03 – CONCRETE
SECTION 033001 – CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
SECTION 042000 – UNIT MASONRY
SECTION 047200 – CAST STONE MASONRY
DIVISION 05 – METALS
SECTION 051200 – STRUCTURAL STEEL
SECTION 052119 – OPEN WEB STEEL JOISTS K-SERIES
SECTION 053100 – STEEL DECKING
SECTION 054000 – COLD-FORMED METAL FRAMING
SECTION 055000 – METAL FABRICATIONS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
SECTION 061000 – ROUGH CARPENTRY
SECTION 062000 – FINISHCARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 072100 – THERMAL INSULATION
SECTION 072600 – VAPOR RETARDERS
SECTION 074113 – METAL ROOF PANELS
SECTION 074213 – METALWALL PANELS
SECTION 074213.23 – METAL COMPOSITE MATERIAL WALL PANELS
SECTION 075323 – EPDM THERMOSET SINGLE-PLY ROOFING
SECTION 076200 SHEET METAL FLASHING AND TRIM
SECTION 077123 – MANUFACTURED GUTTERS AND DOWNSPOUTS
SECTION 077200 – ROOF ACCESSORIES
SECTION 078400 – FIRESTOPPING
SECTION 079200 – JOINT SEALANTS
DIVISION 08 - OPENINGS
SECTION 081213 – HOLLOW METAL FRAMES
SECTION 081416 – FLUSH WOOD DOORS
SECTION 083613 – SECTIONAL DOORS
SECTION 084313 – ALUMINUM-FRAMED STOREFRONTS
SECTION 084413 – GLAZED ALUMINUM CURTAIN WALLS
SECTION 084435 – FIRE-RATED GLAZED ASSEMBLIES
SECTION 087100 – DOOR HARDWARE
SECTION 087101 – HARDWARE SETS
SECTION 088000 – GLAZING
DIVISION 09 - FINISHES
SECTION 092116 – GYPSUM BOARD ASSEMBLIES
SECTION 093000 – TILING
SECTION 095100 – ACOUSTICAL CEILINGS
SECTION 096519 – RESILIENT TILE FLOORING – KARNDEAN
SECTION 096813 – TILE CARPETING
SECTION 099123 – INTERIOR PAINTING
SECTION 099300 – STAINING AND TRANSPARENT FINISHING
DIVISION 10 – SPECIALTIES
SECTION 102800 – TOILET, BATH, AND LAUNDRY ACCESSORIES
SECTION 107113 – EXTERIOR SUN CONTROL DEVICES
SECTION 107113.43 – FIXED SUN SCREENS
SECTION 107500 – FLAGPOLES – CONCORD AMERICAN FLAGPOLE
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
SECTION 123200 – MANUFACTURED WOOD CASEWORK
SECTION 123600 – COUNTERTOPS
DIVISION 13 – SPECIAL CONSTRUCTION
DIVISION 21 – FIRE SUPPRESSION
SECTION 210517 – SLEEVES & SLEEVE SEALS FOR FIRE SUPPRESSION PIPING
SECTION 210518 – ESCUTCHEONS FOR FIRE SUPRESION PIPING
SECTION 210523 – GENERAL-DUTY VALVES FOR WATER-BASED FIRE-
SUPPRESSION PIPING
SECTION 210524 – BACKFLOW PREVENTERS
SECTION 210529 – HANGERS AND SUPPORTS FOR FIRE SUPPRESSION PIPING
AND EQUIPMENT
SECTION 210553 – IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND
EQUIPMENT
SECTION 211119 – FIRE DEPARTMENT CONNECTIONS
SECTION 211313 – SPRINKLER SYSTEMS
SECTION 211317 – WATER MIST SYSTEMS
SECTION 213113 – ELECTRICAL-DRIVE, CENTRIFUGAL FIRE PUMPS
SECTION 213900 – CONTROLLERS FOR FIRE-PUMP DRIVERS
DIVISION 22 - PLUMBING
SECTION 220515 – PLIMBING FIRESTOPPING
SECTION 220553 – PLUMBING IDENTIFICATION
SECTION 220719 – PLUMBING PIPING INSULATION
SECTION 221005 – PLUMBING PIPING
SECTION 221006 – PLIMBING PIPING SPECIALTIES
SECTION 223000 – PLUMBING EQUIPMENT
SECTION 224000 – PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
SECTION 230515 – MECHANICAL FIRESTOPPING
SECTION 230553 – IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 230593 – TESTING, ADJUSTMENT, AND BALANCING FOR HVAC
SECTION 230713 – DUCT INSULATION
SECTION 230719 – HVAC PIPING INSULATION
SECTION 230900 – BUILDING AUTOMATION SYSTEM
SECTION 232300 – REFRIGERANT PIPING
SECTION 233100 – HVAC DUCTS AND CASINGS
SECTION 233300 – AIR DUCT ACCESSORIES
SECTION 233416 – CENTRIFUGAL HVAC FANS
SECTION 233700 – AIR OUTLETS AND INLETS
SECTION 237223 – PACKAGED AIR-TO-AIR RECOVERY UNITS
SECTION 238101 – TERMINAL HEAT TRANSFER UNITS
SECTION 238129 – VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
DIVISION 26 – ELECTRICAL
SECTION 260513 – MEDIUM-VOLTAGE CABLES
SECTION 260519 – LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS &
CABLES
SECTION 260526 – GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 260529 – HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 260553.13 – CONDUIT FOR ELECTRICAL SYSTEMS
SECTION 260553.16 – BOXES FOR ELECTRICAL SYSTEMS
SECTION 260536 – CABLE TRAYS FOR ELECTRICAL SYSTEMS
SECTION 260553 – IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 260573 – POWER SYSTEM STUDIES
SECTION 260583 – WIRING CONNECTIONS
SECTION 260923 – AUTOMATIC LIGHTING CONTROLS
SECTION 261219 – PAD-MOUNTED FR3, MEDIUM-VOLATGE
TRANSFORMERS/VFI
SECTION 262100 – LOW VOLTAGE ELECTRICAL SERVICE ENTRANCE
SECTION 262413 – SWITCHBOARDS
SECTION 262416 – PANELBOARDS
SECTION 262726 – WIRING DEVICES
SECTION 262816.16 – ENCLOSED SWITCHES
SECTION 263213 – ENGINE GENERATORS
SECTION 263600 – TRANSFER SWITCHES
SECTION 264300 – SURGE PROTECTIVE DEVICES
SECTION 265100 – INTERIOR LIGHTING
SECTION 265600 – EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
SECTION 270100 – BASIC COMMUNICATION REQUIREMENTS
SECTION 271000 – FIBER OPTIC & COPPER CABLING BACKBONE
SECTION 271100 – TELECOMMUNICATION ROOMS
SECTION 271600 – HORIZONTAL CABLING
SECTION 271700 – TESTING, IDENTIFICATION AND ADMINISTRATION
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
SECTION 283101 – PROTECTED PREMISES FIRE ALARM SYSTEM
DIVISION 31 – EARTHWORK
SECTION 310000 – EARTHWORK
SECTION 310100 – SITE SOIL REQUIREMENTS
SECTION 311000 – SITE CLEARING
SECTION 311300 – SELECTIVE TREE REMOVAL AND TRIMMING
SECTION 312319 – CONSTRUCTION DEWATERING
SECTION 312513 – EROSION AND SEDIMENT CONTROL
SECTION 315000 – EXCAVATION SUPPORT AND PROTECTION
DIVISION 32 – EXTERIOR IMPROVEMENT
SECTION 321216 – ASPHALT PAVING
SECTION 321613 – PORTLAND CEMENT CONCRETE CURBS
SECTION 321723 – PAVEMENT MARKINGS
SECTION 323111 – GATE OPERATORS
SECTION 323113 – CHAIN LINK FENCE AND GATE
SECTION 323119 – SECURITY FENCING AND CANTILEVER GATE
DIVISION 33 – UTILITIES
SECTION 330509 – THRUST RESTRAINT FOR UTILITY PIPING
SECTION 330525 – SUPPORT AND PROTECTION OF UTILITIES
SECTION 331213 – WATER SUPPLY BACKFLOW PREVENTER ASSEMBLIES
SECTION 331216 – WATER UTILITY DISTRIBUTION VALVES
SECTION 331220 – FIRE HYDRANTS
SECTION 331300 – DISINFECTION OF WATER UTILITY DISTRIBUTION
SECTION 331416 – SITE WATER UTILITY DISTRIBUTION PIPING
SECTION 333103 – DRAINAGE PIPE (SANITARY)
SECTION 333913 – MANHOLES AND DRAINAGE STRUCTURES WITH FRAMES
AND COVERS
SECTION 334104 – CORRUGATED POLYETHYLENE STORM DRAIN PIPE
SECTION 334105 – PLASTIC STORM DRAINAGE PIPE
DIVISION 34 – TRANSPORTATION
SECTION 344113 – TRAFFIC SIGNS
Technical Appendix:
Geotechnical Report –
SUBSURFACE INVESTIGATION AND GEOTECHNICAL EVALUATION
SERVICES – BY ATLANTIC TESTING LABORATORIES – DATED 8/2/2024
GLS ADMINISTRATION BUILDING & MAINTENANCE GARAGE -
STORMWATER POLLUTION PREVENTION PLAN – DATED 6/16/2026
Technical Specifications
GLS Administration Building and Maintenance Garage
Summary Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
011000 - 1
SECTION 011000
SUMMARY
PART 1 GENERAL
1.1 PROJECT
A. Project Name: GLS Administration Building and Maintenance Garage
B. The Project consists of the construction of a new 10,750 s.f. office building and a new 1,900 s.f. attached maintenance garage. The project will comply with the Guiding Principles for Sustainable Federal Buildings, and GSA Building Guidelines.
1.2 REFERENCED SECTIONS
A. Please refer to all specification sections for contractor required tasks.
B. Section 013000 Administrative Requirements for submittal procedures.
C. Section 017419 Construction Wast Management and Disposal for reports and plan.
1.3 DEFINITIONS
A. Substantial Completion: Substantial completion of work is achieved when the owner can safely and legally use, occupy, and operate the building and site facilities for its intended purpose.
Minor unfinished items may remain.
B. CO: Contracting Officer
C. COR: Contracting Officer’s Representative.
END OF SECTION 011000
SECTION 012500
SUBSTITUTION PROCEDURES
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
2.1 GENERAL REQUIREMENTS
A. With the exception of the fire protection system, whenever a material, article, or piece of equipment is identified on the plans or in the Specifications by reference to manufacturers' or vendor's names, trade names, catalog numbers, or makes, it is identified to establish a standard of quality, performance, and/or basis of design. Such references shall be read as if followed by the words 'or equal'. Equivalent offerings are acceptable and will be approved by the government as long as they meet the standards, salient characteristics, and performance requirements listed within the contract documents.
B. A substitution request for products, assemblies, materials, and equipment constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the basis of design product, equipment, assembly, or system.
2. Agrees to provide a warranty for the substitution that is equal to or greater than the warranty of the specified Basis of Design product.
3. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to the Government.
4. Waives claims for additional costs or time extension that may subsequently become apparent due to the substitution.
5. Agrees to bear all costs associated with independent testing or evaluation required by the Government to prove the proposed substitution meets the specified salient characteristics.
C. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.
D. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
E. Limit each request to a single proposed substitution item.
If a substitution request is rejected by the Government, the Contractor shall promptly provide the originally specified Basis of Design product at no additional cost to the Government and without impacting the project schedule, unless the Contracting Officer's Representative (COR) grants written approval to submit a secondary substitution request based on valid, documented extenuating circumstances.
F. Substitution requests must be submitted a minimum of forty-five (45) days prior to the date the material or equipment must be ordered to maintain the project schedule. The Government requires a minimum of ten (10) business days to review substitution requests. Any project delays resulting from late submissions or the time required to evaluate an 'or equal' product are the sole responsibility of the Contractor.
Only the Contracting Officer (CO) or the designated Contracting Officer's Representative (COR) holds the authority to approve substitution requests. Approval will be granted in writing.
G. Substitution requests must be submitted separately from standard product data and shop drawing submittals and must be prominently marked as a 'SUBSTITUTION REQUEST' on the transmittal.
END OF SECTION 012500
Administrative Requirements Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
013000 - 1
SECTION 013000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. General administrative requirements.
B. Web-based project software service.
C. Electronic document submittal service.
D. Preconstruction meeting.
E. Progress meetings.
F. Construction progress schedule.
G. Contractor's daily reports.
H. Progress photographs.
I. Coordination drawings.
J. Submittals for review, information, and project closeout.
K. Number of copies of submittals.
L. Requests for Interpretation (RFI) procedures.
M. Submittal procedures.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 WEB-BASED PROJECT SOFTWARE SERVICE
A. Web-Based Project Software Service: Provide, administer, and use web-based project software to host and manage project communication and documentation.
1. Include, at minimum, the following features:
a. Project directory, including Owner, Contractor, subcontractors, Architect, Architect's consultants, and other entities involved in the project. Include names of contact persons and contact information for each entity.
b. Access control for each entity and for each workflow process to determine each entity's digital rights to create, modify, view, and print documents.
c. Workflow planning, allowing customization of workflow for each project entity.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
013000 - 2
d. Creation, logging, tracking, and notification for project communications.
e. Tracking of project communication statuses in real time, including timestamped response log.
f. Procedures for viewing PDFs or similar file formats, allowing markups by each entity. Provide security features to lock markups against changes once submitted.
g. Tracking of payment applications (in addition to GLS required process).
h. Tracking of contract modifications (in addition to GLS required process).
i. Creation and distribution of meeting minutes.
j. Document management for drawings, specifications, and coordination drawings, including revision control.
k. Management of construction progress photographs.
l. Mobile device compatibility.
m. Creation of data analytics reports.
n. Creation and export of editable logs for software functions. Provide Owner, Architect, and Architect's consultants with rights and ability to download logs when requested.
o. Only the Contracting Officer’s Representative (COR) and Contracting Officer (CO) shall have authorization to approve submitted items.
2. Provide up to 20 user licenses for use by Owner, Architect, Architect's consultants, and other entities involved in the project.
3. Comply with the software service's current published licensing agreements.
4. Training: Provide one-hour, web-based training session for users of software service.
Further training is the responsibility of the user.
a. Representatives of Owner are scheduled and included in this training.
5. Web-Based Project Software Services: The selected service is:
3.2 ELECTRONIC DOCUMENT SUBMITTAL SERVICE
A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF, MS Word, or MS Excel) format, as appropriate to the document, and transmitted via an Internet-based submittal service that receives, logs and stores documents, provides electronic stamping and signatures, and notifies addressees via email.
1. Besides submittals for review, information, and closeout, this procedure applies to Requests for Interpretation (RFIs), progress documentation, documentation of contract
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
013000 - 3 modification documents (e.g. supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, Contractor's correction punchlist, and any other document any participant wishes to make part of the project record. Documentation of these on the service does not replace GLS required procedures, but is in addition to them.
2. Owner, Contractor and Design Team are required to use this service.
3. It is Contractor's responsibility to submit documents in allowable format.
4. Subcontractors, suppliers, and Architect's consultants will be permitted to use the service at no extra charge.
5. Users of the service need an email address, internet access, and PDF review software that includes ability to mark up and apply electronic stamps (such as Adobe Acrobat, www.adobe.com, or Bluebeam PDF Revu, www.bluebeam.com), unless such software capability is provided by the service provider.
6. All other specified submittal and document transmission procedures apply, except that electronic document requirements do not apply to samples or color selection charts.
B. Submittal Service: The selected service is:
C. Training: One, one-hour, web-based training session will be arranged for all participants, with representatives of Architect and Contractor participating; further training is the responsibility of the user of the service.
D. Project Closeout: Architect will determine when to terminate the service for the project and is responsible for obtaining archive copies of files for Owner.
3.3 PRECONSTRUCTION MEETING
A. Attendance Required:
1. Owner.
2. Architect.
3. Contractor.
B. Agenda:
1. Execution of Owner-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
013000 - 4
5. Designation of personnel representing the parties to Contract and COR.
6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
C. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.4 PROGRESS MEETINGS
A. Attendance Required:
1. Contractor.
2. Owner.
3. Design team representation as required.
4. Contractor's superintendent.
5. Major subcontractors.
B. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Other business relating to work.
C. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.5 CONSTRUCTION PROGRESS SCHEDULE
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
013000 - 5
A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
B. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
C. Within 10 days after joint review, submit complete schedule.
D. Submit updated schedule with each Application for Payment.
3.6 PROGRESS PHOTOGRAPHS
3.7 COORDINATION DRAWINGS
3.8 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to the COR for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 017800 - Closeout Submittals.
3.9 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
013000 - 6
6. Manufacturer's field reports.
7. Other types indicated.
3.10 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 017800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
D. Submit for Owner's benefit during and after project completion.
3.11 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Samples: Submit the number specified in individual specification sections; one of which will be retained by the Government.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
END OF SECTION 013000
Quality Requirements Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
014000 - 1
SECTION 014000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. References and standards.
D. Testing and inspection agencies and services.
E. Control of installation.
F. Mock-ups.
G. Manufacturers' field services.
H. Defect Assessment.
1.2 RELATED REQUIREMENTS
A. Section 013000 - Administrative Requirements: Submittal procedures.
B. Section 014216 - Definitions.
C. Section 014219 - Reference Standards.
1.3 QUALITY ASSURANCE
A. Testing Agency Qualifications:
1.4 TESTING AND INSPECTION AGENCIES AND SERVICES
A. Owner will engage the services of an independent testing agency to perform other specified testing.
B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
PART 3 EXECUTION
2.1 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
014000 - 2
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from COR before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
2.2 MOCK-UPS
A. Tests shall be performed under provisions identified in this section and identified in the respective product specification sections.
B. Assemble and erect specified items with specified attachment and anchorage devices, flashings, seals, and finishes.
C. Architect will use accepted mock-ups as a comparison standard for the remaining Work.
D. Where mock-up has been accepted by Architect and is specified in product specification sections to be removed, protect mock-up throughout construction, remove mock-up and clear area when directed to do so by Architect.
2.3 TESTING AND INSPECTION
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with CO, COR, and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Cooperate with CO, COR, and Contractor of observed irregularities or non-compliance of Work or products.
5. Submit reports of all tests/inspections specified.
B. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
014000 - 3
2. Agency may not approve or accept any portion of the Work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the Work.
C. Contractor Responsibilities:
1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.
3. Provide incidental labor and facilities:
a. To provide access to Work to be tested/inspected.
b. To obtain and handle samples at the site or at source of Products to be tested/inspected.
c. To facilitate tests/inspections.
d. To provide storage and curing of test samples.
4. Notify COR and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.
5. Upon written authorization of CO, Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
6. Upon written authorization of CO, Arrange with Owner's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
D. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by COR.
E. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.
2.4 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust, and balance equipment, and other similar preparatory duties as applicable, and to initiate instructions when necessary.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
014000 - 4
B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
2.5 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
END OF SECTION 014000
Definitions Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
014216 - 1
SECTION 014216
DEFINITIONS
PART 1 GENERAL
1.1 SUMMARY
A. Other definitions are included in individual specification sections.
1.2 DEFINITIONS
A. Furnish: To supply, deliver, unload, and inspect for damage.
B. Install: To unpack, assemble, erect, apply, place, finish, cure, protect, clean, start up, and make ready for use.
C. Product: Material, machinery, components, equipment, fixtures, and systems forming the work result. Not materials or equipment used for preparation, fabrication, conveying, or erection and not incorporated into the work result. Products may be new, never before used, or re-used materials or equipment.
D. Project Manual: The book-sized volume that includes the procurement requirements (if any), the contracting requirements, and the specifications.
E. Provide: To furnish and install.
F. Supply: Same as Furnish.
G. CO: Contracting Officer
H. COR: Contracting Officer’s Representative
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION 014216
Code-Required Special Inspections and Procedures Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
014533 - 1
SECTION 014533
CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Code-required special inspections.
B. Submittals.
1.2 REFERENCE STANDARDS
A. ACI CODE-318 - Building Code Requirements for Structural Concrete and Commentary; 2019 (Reapproved 2022).
B. AISC 360 - Specification for Structural Steel Buildings; 2022.
C. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection; 2023.
D. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2020, with Errata (2023).
E. AWS D1.3/D1.3M - Structural Welding Code - Sheet Steel; 2018, with Errata (2022).
F. AWS D1.4/D1.4M - Structural Welding Code - Steel Reinforcing Bars; 2018, with Amendment (2020).
G. ICC (IBC)-2018 - International Building Code; 2018.
H. SDI QA/QC - Standard for Quality Control and Quality Assurance for Installation of Steel Deck; 2022.
1.3 SUBMITTALS
A. See Section 013000 - Administrative Requirements, for submittal procedures.
B. Special Inspection Agency Qualifications: Prior to the start of work, the Special Inspection Agency is required to submit the following to the COR:
1. Submit agency name, address, and telephone number, names of full time registered Engineer and responsible officer.
2. Submit copy of report of laboratory facilities inspection made by NIST Construction Materials Reference Laboratory during most recent inspection, with memorandum of remedies of any deficiencies reported by the inspection.
3. Submit certification that Special Inspection Agency is acceptable to AHJ.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
014533 - 2
C. Special Inspection Reports: After each special inspection, Special Inspector is required to promptly submit at least two copies of report; one to the CO, and one to the COR.
1.4 SPECIAL INSPECTION AGENCY
A. Owner will engage the services of a Special Inspection Agency to perform inspections and associated testing as required by the NYS building code.
B. Employment of agency in no way relieves Contractor of obligation to perform work in accordance with requirements of Contract Documents.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 SCHEDULE OF SPECIAL INSPECTIONS, GENERAL
A. Frequency of Special Inspections: Special Inspections are indicated as continuous or periodic.
1. Continuous Special Inspection: Special Inspection Agency is required to be present in the area where the work is being performed and observe the work at all times the work is in progress.
2. Periodic Special Inspection: Special Inspection Agency is required to be present in the area where work is being performed and observe the work part-time or intermittently and at the completion of the work.
3.2 SPECIAL INSPECTIONS FOR STEEL CONSTRUCTION
A. Structural Steel: Comply with quality assurance inspection requirements of ICC (IBC)-2018.
B. Cold-Formed Steel Deck: Comply with quality assurance inspection requirements of SDI
QA/QC.
C. Open-Web Joists and Joist Girders: Comply with requirements of ICC (IBC), Table 1705.2.3.
1. End Connections - Welding or Bolted: Comply with requirements of SJI 100; periodic.
2. Bridging - Horizontal or Diagonal:
D. Welding:
1. Structural Steel and Cold Formed Steel Deck:
a. Complete and Partial Joint Penetration Groove Welds: Verify compliance with AWS D1.1/D1.1M; continuous.
b. Multipass Fillet Welds: Verify compliance with AWS D1.1/D1.1M; continuous.
c. Single Pass Fillet Welds Less than 5/16 inch Wide: Verify compliance with AWS D1.1/D1.1M; periodic.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
014533 - 3
d. Plug and Slot Welds: Verify compliance with AWS D1.1/D1.1M; continuous.
e. Single Pass Fillet Welds 5/16 inch or Greater: Verify compliance with AWS D1.1/D1.1M; continuous.
f. Floor and Roof Deck Welds: Verify compliance with AWS D1.3/D1.3M;
continuous.
2. Reinforcing Steel: Verify items listed below comply with AWS D1.4/D1.4M and ACI CODE-318, Section 3.5.2.
a. Verification of weldability; periodic.
b. Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames as well as where it is referenced in older codes. Elements of special structural walls of concrete and shear reinforcement; continuous.
c. Shear reinforcement; continuous.
d. Other reinforcing steel; periodic.
3.3 SPECIAL INSPECTIONS FOR CONCRETE CONSTRUCTION
A. Reinforcement, Including Prestressing Tendons, and Verification of Placement: Verify compliance with ACI CODE-318, Chapters 20, 25.2, 25.3, 26.6.1-26.6.3; periodic.
B. Design Mix: Verify plastic concrete complies with the design mix in approved Contract Documents and with ACI CODE-318, Chapter 19, 16.4.3, 26.4.4; periodic.
END OF SECTION 014533
Temporary Facilities and Controls Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
015000 - 1
SECTION 015000
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.1 DESCRIPTION
A. Provide construction facilities and temporary controls necessary for the Work, unless otherwise indicated.
1. The construction facilities and temporary controls specified to be provided by a particular Contract shall be kept operational by that Contractor for the Work of all related Contracts at all times Work is being performed by a Contractor.
2. The construction facilities and temporary controls specified to be provided by a particular Contractor shall be installed as soon after award of the Contract as necessary to enable the Work of each Contract to proceed on schedule, and maintained until completion of the Work of all related Contracts unless otherwise directed in writing.
3. Any Contractor who requires additions to the construction facilities and temporary controls specified to be provided by another Contractor, shall provide and maintain them.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Section 310000 “Earthwork”
B. Section 312513 “Erosion and Sediment Control”
C. Section 315000 “Excavation Support and Protection”
D. Section 321216 “Asphalt Paving”
E. Section 323113 “Chain Link Fence and Gate”
F. Section 344113 “Traffic Signs”
1.3 SECTION INCLUDES
A. Temporary sanitary facilities.
B. Temporary Controls: fencing.
C. Waste removal facilities and services.
D. Field offices.
1.4 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
015000 - 2
B. Maintain daily in clean and sanitary condition.
1.5 FENCING, BARRIERS, AND ENCLOSURES
A. Construction: Commercial grade chain link fence with black privacy slats.
B. Provide fence around construction site per the civil plan and details sheets. Equip with vehicular and pedestrian gates with locks. Provide motorized gate for the main entry temporary access vehicular gate.
C. All Work: Provide barriers during performance of the Work to:
1. Prevent unauthorized entry to work areas.
2. Allow for occupancy of areas adjacent to Site. Protect existing facilities and adjacent properties from damage.
3. Scaffolding, Hoist, and Equipment Barriers: Provide temporary fence enclosures as required to prevent unauthorized persons from coming in contact with ground supported scaffolding, hoists, and equipment.
D. The Contractor is responsible for remobilization of fencing, gates and pedestrian pathways to accommodate Work.
E. Provide temporary fence enclosure around work and staging areas per the following requirements:
1. Portable Fence with Gates: Provide temporary chain link construction fence and gates conforming to Drawings and Specifications.
2. Each post shall be provided with temporary base supports, properly secured per manufacturer recommendations.
F. Deviations from the fence and gate post components and installations requirements as noted above and within the Contract Documents shall not be permitted without permission from the
COR.
G. Contractor shall maintain the fencing and gates, with locks, throughout the entire project.
Coordinate with staff and security protocol. The Owner will always require copies of keys to any locks for access.
H. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Wherever locks are installed – two shall be installed – one provided by the Contractor and one to be provided by the Owner – so that the Owner can gain access to any locked area at any time. If Contractor has to install any locks that the Owner does not have keys to – Contractor shall provide one set of keys to Owner within 1 hour of lock being installed.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
015000 - 3
I. The Contractor is responsible for remobilization of fencing, gates, and pedestrian pathways to accommodate Work.
1.6 WATER CONTROLS
A. Provide and maintain pumping equipment necessary to keep the work areas free from water.
Discharge water into existing storm drainage systems or otherwise disperse as directed.
1.7 SECURITY
A. Provide security and facilities to protect Work, existing facilities, and Owner's operations from unauthorized entry, vandalism, or theft.
B. The Contractor is responsible to restore, by the end of each workday, existing in place safety/security items such as fencing, doors, screens, locks, alarm system components, that required removal, replacement, or adjustment to perform the Work, unless otherwise authorized in writing by the Owner.
1.8 FIRE PREVENTION
A. Take precautions necessary to prevent fires.
B. Furnish and maintain a currently inspected 20 pound capacity multi-class ABC fire extinguisher as required and by locations and classes of fire exposures.
C. Do not use flammable liquids, other than those specified, within a building without the written approval from the Owner & Engineer.
1.9 WASTE REMOVAL
A. See Section 017419 - Construction Waste Management and Disposal, for additional requirements.
B. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.
C. Provide containers with lids. Remove trash from site periodically.
D. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction.
E. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.
1.10 FIELD OFFICES
A. Office: Weathertight, with lighting, electrical outlets, heating, cooling equipment, and equipped with sturdy furniture, drawing rack, and drawing display table.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
015000 - 4
B. Locate offices a minimum distance of 30 feet from existing and new structures.
1.11 WORK AREA MAINTENANCE AND DEWATERING
A. Provide and maintain work areas free from trash and debris. Ensure construction trash and debris does not enter into areas accessible by the public.
B. Provide and maintain pumping equipment necessary to keep the work areas free from water.
Discharge water into existing storm drainage systems or otherwise disperse as directed.
C. The Contractor is responsible for snow and ice removal at the site. This includes clearing on-site access routes, staging and storage areas, walkways, and construction entrances in order to provide safe access to all areas of work.
1.12 PROJECT OR LIMIT OF WORK ACCESS
A. Routes of ingress and egress on the premises to the location of the work areas shall be as shown on the drawings and specified in the Contract Documents. Contractor shall identify these routes in their submitted staging plan.
B. Keep designated access roads clear of dirt and debris resulting from the Work. Traffic control devices including Signs, Cones, Barricades, and Striping shall be in accordance with the most recent version of The Manual of Uniform Traffic Control Devices and the Contract Documents.
C. Provide means of removing mud from vehicle wheels before entering paved roads.
1.13 PARKING
A. Unmetered on street parking adjacent to the site is available. Parking of vehicles on the project site shall be allowed as coordinated with the Owner. All vehicles shall remain in approved areas only.
1.14 PROJECT INFORMATION SIGNS, BILLBOARDS & BANNERS
A. Provide signs as indicated below. Unauthorized signs are not permitted.
1. Project Identification Signs: Provide two (2) Project identification signs (Owner will provide text and graphics in a compatible digital file as directed by the Contractors sign fabricator – sign size will be 4’-0” x 8’-0”- sign shall be printed on vinyl with weather resistant ink – vinyl sign shall be mounted on ¾” x 4’-0” x 8’-0” sign board as supported by two pressure treated 4”x 4”x10’-0” posts - placed 3’-0” into the ground with concrete footing/encasement).
2. Temporary Traffic Signs: Contractor to provide all traffic and pedestrian traffic control signs required for MPT and as specified on the drawings necessary to complete their work. At the end of the project, all temporary traffic signs shall become the property of the Owner (costs for this shall be accounted for in the base offer.)
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
015000 - 5
a. Provide temporary, directional signs for construction personnel and visitors in accordance with Construction Staging Plans.
3. Maintain and touchup all signs so they remain legible at all times.
1.15 RUBBISH REMOVAL
A. Waste Disposal Facilities: Contractor shall provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Comply with progress cleaning requirements in Division 01. If construction waste is stored in areas visible to the public – containers and waste shall be removed on a daily basis. Project contractors will be responsible for management of waste related to their activities.
B. Clean up and containerize the rubbish (refuse, debris, waste materials, and removed materials and equipment) resulting from the Work at least once a day and more often if the rubbish interferes with the work of others or presents a hazard. Leave work areas broom clean, except where more stringent cleaning is specified, at the end of each day. Locate containerized rubbish on the Site where directed.
1. Burning of rubbish will not be permitted.
2. Also comply with the requirements of Section 017419 “Off-Site Transportation and Disposal”.
1.16 RELOCATION AND REMOVALS
A. The Contractor shall be responsible for relocation of all items labeled as “Temporary” shown in the drawings and contract documents as necessary as directed by the Owner. These items shall include but are not limited to: Temporary construction fence, temporary gates, temporary picnic tables, and temporary umbrellas.
B. Remove the construction facilities and temporary controls when they are no longer required.
Restore permanent facilities used for or connected to temporary facilities to their original condition or better.
C. Remove temporary roads and paved areas not intended for or acceptable for integration into permanent construction. Where area is intended for landscape development, remove soil and aggregate fill that do not comply with requirements for fill or subsoil. Remove materials contaminated with road oil, asphalt and other petrochemical compounds, and other substances that might impair growth of plant materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary entrances, as required by authorities having jurisdiction.
D. At Substantial Completion, repair, renovate, and clean permanent facilities used during construction period. Comply with final cleaning requirements specified in Division 01.
1.17 SUBMITTALS
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
015000 - 6
A. Construction Staging Plan: The Contractor shall prepare a detailed plan submittal depicting all temporary facilities, utility hookups, staging areas, parking areas for construction personnel and temporary routes as they relate to vehicles and pedestrians. The Contractor shall update and maintain this plan throughout the course of construction. The plan and updates to the plan will be subject to review and approval by the COR. Proposed revisions to the plan will be reviewed at bi-weekly project meetings for input and approval by the COR. Reference Specification Division 02.
1. Included with the Construction Staging Plan, the Contractor shall submit detailed means and methods for sidewalk protection, including curb ramping, and maintaining existing storm drainage patterns.
2. The Construction Staging Plan shall include a Maintenance and Protection of Traffic (MPT) Plan for continued Contractor access to all site entrances and include all means to ensure the safety of motorists, bicyclists and pedestrians during construction.
B. Fire-Safety Program: Show compliance with requirements of NFPA 241 and all authorities having jurisdiction. Indicate Contractor personnel responsible for management of fire-prevention program.
1.18 USE CHARGES
A. General: Installation and removal of charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost, including, but not limited to, Owner and his forces (construction or otherwise) and contractors, Construction Manager, Engineer, testing agencies, and authorities having jurisdiction.
B. Water Service from Existing System: Water and Sewer from Owner's existing systems is not available for use. The Contractor shall provide connections and extension of existing services as required for construction operation.
C. Electric Power Service from Existing System: Electric power from Owner's existing system is not available for use. The Contractor shall provide connections and extension of existing services as required for construction operations and all temporary power needs.
1.19 TEMPORARY LIGHT AND POWER
A. Electrical energy for temporary light and power is not available from the Owner so the Contractor shall be included necessary Work in their costs.
B. Site Security Lighting shall be included in the site electrical work. Provide sufficient site lighting for security purposes so patrons may walk outside of construction site safely.
C. All Work:
1. The Contractor shall coordinate and phase the temporary power requirements with the schedule of construction and submit schemes to the COR for approval.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
015000 - 7
2. Provide portable source of electricity for temporary light and power of adequate capacity for the performance of the Work until the temporary electrical service can be utilized for temporary light and power.
3. Keep the site lighting maintained and energized in all Work areas from dusk to dawn, 7 days per week.
4. Provide temporary feeder and distribution panel, including frames and plywood mounting stand, with outlet array consisting of minimum 20 duplex GFCI (20 amp) on dedicated circuits. Provide all in accordance with NEC requirements.
5. Provide lamps and fuses including replacements required.
6. Install materials for temporary light and power in conformance with the National Electrical Code.
7. Provide temporary lighting as required to maintain a minimum of 10 foot candles in the Work areas.
8. Materials for temporary light and power need not be new if they are in satisfactory operating condition.
9. Provide ground-fault protection for personnel (such as portable plug-in type ground-fault circuit-interrupters) on single phase 15 and 20 ampere receptacle outlets which are in use.
10. Receptacle outlets, portable cord connectors and attachment plugs shall have standard NEMA configurations.
11. Provide temporary wiring and equipment in conformance with the National Electrical Code.
12. As the progress of the Work allows, and as approved, completed portions of the permanent wiring and electrical service may be utilized for temporary light and power.
1.20 CONSTRUCTION HEAT
A. Construction Heat: Provide construction heat as differentiated from Temporary Heat to accomplish the following:
1. Protect materials and equipment being installed as part of the Contract from freezing.
2. Enable workers to accomplish their respective tasks in a satisfactory manner.
3. Maintain construction schedules.
1.21 TEMPORARY HEAT
A. Provide temporary heat, starting at such time as directed, when in the opinion of the Owner, the buildings, or any major part is enclosed.
Aubertine and Currier Architects, Engineers & Land Surveyors, PLLC Printed: 8/7/2026
015000 - 8
1. Buildings, or any part of it, shall be considered enclosed when the exterior walls and roof deck or overhead closures are sufficiently completed to exclude the elements, except for windows, doors, ventilators, and similar openings which shall be temporarily sealed watertight with suitable closures.
2. In the event a building under construction is of window wall design, and the window walls are not installed as scheduled, provide temporary weathertight wall closures in sufficient time so as not to delay construction of the building.
1.22 TEMPORARY WATER
A. Temporary water service is not available.
B. Contractor to provide temporary water and metering for construction (including trailers that will remain during construction). Prevent waste of water.
1.23 TEMPORARY TOILETS
A. Provide toilet facilities for Contractors’ and subcontractors employees engaged on the Project.
Locate toilets where directed and maintain them in a sanitary condition.
NUMBER OF EMPLOYEES MINIMUM NUMBER OF FACILITIES*
20 or less 1 toilet
20 or more 1 toilet and 1 urinal per 40 employees
200 or more 1 toilet and 1 urinal per 50 employees
*Toilet/Urinal Combinations shall count as only one facility. Provide separate female and male facilities.
B. Locate toilet facilities no more than 1000 feet from any work location.
1.24 PROTECTION OF WORK AND EXISTING PROPERTY
A. Protect installed Work and existing property during performance of the Work.
B. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
C. Protect finished surfaces, stairs, and other surfaces from traffic, dirt, wear, damage, and movement of heavy objects by covering them with durable sheet materials.
D. The Contractor is responsible for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .