Attachment CC SFMD Materials List.pdf
PDF 72 KB Posted
- Attached to
- Rehabilitation of Fire Investigation Burn Cells
- Solicitation number
- 65DPS-S3798
- Issued by
- Churchill County, Nevada
About this file
This is a materials list attachment for an investigation trailer project, likely supporting a state or local contract opportunity for construction or facility setup. The document provides a detailed breakdown of materials required for investigation trailer buildout, with quantities scaled for one, two, and four room configurations. Key materials specified include drywall panels, drywall tape, vinyl horizontal sliding windows, exterior doors (metal or wood), floor sheathing plywood, electrical breaker panels, latex fire sealant caulking, plastic electrical outlets, and electrical light switches. The quantities scale proportionally with room count, indicating flexibility in project scope—one-room configuration requiring 18 drywall panels, two-room requiring 36 panels, and four-room requiring 72 panels. Similar proportional scaling applies to all listed items, with some materials such as floor sheathing showing fixed quantities regardless of room count (5 units for one or two rooms, 10 units for four rooms).
No pricing information, response deadlines, site visit requirements, bidders' conferences, award dates, or contract terms are specified in this materials list. The document serves as a reference guide for bidders to understand the scope of materials needed for the investigation trailer project at various configuration levels, enabling accurate cost estimation and proposal development.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment DD-1 Damage Report.pdf | ||
| Terms-and-conditions-for-services~5.pdf | ||
| 65DPS-S3798 - Insurance Schedule - RFP.docx | DOCX document | |
| 65DPS-S3798-Vendor-Information-Response.pdf | ||
| Standard-form-contract~4.docx | DOCX document | |
| 65DPS-S3798 - Cost Proposal.docx | DOCX document | |
| Certification-regarding-lobbying~5.pdf | ||
| Attachment BB Trailer photos.pdf | ||
| Attachment DD Damage Report.pdf | ||
| Quote Instructions.pdf | ||
| 65DPS-S3798-Reference-Questionnaire.docx | DOCX document | |
| Attachment BB-1 Stand-alone Units.pdf | ||
| 65DPS-S3798 - Request-for-Proposals.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description Quantity for One room
Quantity for Two Rooms
Quantity for Four Rooms
½” Drywall panels 18 36 72 Drywall tape – 250’ rolls 2 4 8 Vinyl Window, horizontal sliding 2 4 8 Exterior door – metal or wood 1 2 4 Floor sheathing – plywood ½” 5 5 10 Breaker panel 1 2 4 Caulking – latex fire sealant 5 10 20 Electrical outlets – Plastic 2 4 8 Electrical light switch 1 2 4
ATTACHMENT CC: Basic Materials List for Investigation Trailer
Table 1