This is a cost proposal document for RFP 65DPS-S3798 issued by the Colorado Department of Public Safety for the rehabilitation of fire investigation burn cells. The project involves demolition and reconstruction work on existing burn cell facilities. Vendors are required to submit a detailed cost breakdown that includes the per-demolition project cost and a contingency/reserve amount calculated as a percentage of the total demolition and reconstruction project cost. The proposal structure indicates that this is a phased project with specific deliverables related to demolition and subsequent reconstruction activities.
The contract pricing structure establishes a total contract not-to-exceed amount of $322,768.53. Payment terms are structured in two installments, with fifty percent of the contract value paid prior to the commencement of demolition work and the remaining fifty percent due upon project completion and inspection. Vendors must provide itemized costs for each demolition and reconstruction phase, along with a separate contingency or reserve fund line item to account for potential project variables. This payment structure ensures financial accountability while allowing for phased project execution and completion verification before final payment is released.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment DD-1 Damage Report.pdf | ||
| Attachment CC SFMD Materials List.pdf | ||
| Terms-and-conditions-for-services~5.pdf | ||
| 65DPS-S3798 - Insurance Schedule - RFP.docx | DOCX document | |
| 65DPS-S3798-Vendor-Information-Response.pdf | ||
| Standard-form-contract~4.docx | DOCX document | |
| Certification-regarding-lobbying~5.pdf | ||
| Attachment BB Trailer photos.pdf | ||
| Attachment DD Damage Report.pdf | ||
| Quote Instructions.pdf | ||
| 65DPS-S3798-Reference-Questionnaire.docx | DOCX document | |
| Attachment BB-1 Stand-alone Units.pdf | ||
| 65DPS-S3798 - Request-for-Proposals.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST PROPOSAL – RFP 65DPS-S3798
Rehabilitation of Fire Investigation Burn Cells
Vendor Name: _______________________________________________________
Cost per demolition and project cost $_________________
Contingency/reserve (per demolition and reconstruction project cost) $__________________
Half of the payment will be paid prior to the start of demolition and the remainder upon completion and inspection of the project.
Two payments per demolition and reconstruction of project:
TOTAL CONTRACT NOT TO EXCEED: $322,768.53