This document is an attachment containing Data Item Descriptions (DIDs) related to a draft Performance Work Statement (PWS) for a planned Federal Aviation Administration (FAA) Aircraft Parts-Contractor Logistics Support (AC Parts-CLS) contract. The DIDs outline the specific reporting and documentation requirements for the contractor, including a Monthly Status Report and a Parts Management Program. Key details include the requirement for the contractor to establish and maintain a Parts Management Program to ensure use of parts meets contractual requirements, reduce parts proliferation, enhance reliability and supportability, and reduce life-cycle costs. The contractor must make the parts management process documentation available to the FAA for review. The related pre-solicitation notice indicates the FAA is seeking information on a potential contract to purchase and/or exchange aircraft parts for its fleet to streamline the parts ordering process.

View the file

Other files

File Type Posted
Schedule B - AC Contractor Logistics Support.xlsx XLSX spreadsheet
Market Survey Aircraft Parts-Contractor Logistics Support 040224.docx DOCX document
Attachment A - Statement of Work.docx DOCX document
Attachment D -Top 10 Vendor Report FY22.xlsx XLSX spreadsheet
Attachment B - draft AC Parts-CLS CDRLs.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page Federal Aviation Administration (FAA) Flight Program Operations (AJF) - Aircraft Parts-Contractor Logistics Support

Attachment 2: Data Item Description

Date: November 21, 2023

DID

Block A
DID NumberBlock B
DID TitleBlock C
SOW ReferenceBlock D
Approval CodeBlock E
FrequencyBlock F
Initial SubmissionBlock G
Subsequent SubmissionsBlock H
Electronic FormatBlock I
Hardcopy RequiredBlock J
If hardcopy required, number of copiesBlock K

Special Instructions MSR-001 Monthly Status Report NA A Monthly See Block K Seek Block K Seek Block K MS Office Compatible No N/A A. The Contractor must submit the report within five (5) days of the first full month after the contract award date and every fifth (5th) day thereafter.

B. The Contractor must submit the report within five (5) days of the first full month after the contract award date and every fifth (5th) day thereafter.

PWP - 001 Parts Management Program (PWP) SOW-5.0 A As Required

NA As Required MS Office Compatible No N/A A. The Contractor must establish and maintain a Parts Management Program (PMP) IAW Flight Program Operations FAA accepted-GMM and CAMP.

B. This program must ensure that the use of parts meets contractual requirements, reduces proliferation of parts within and across FAA systems and equipment through standardization, enhances reliability and supportability to meet material readiness objectives, and reduces total life-cycle costs. The Contractor must describe how the parts management process is validated, how process improvements are incorporated, and how process variation is controlled.

C. The procedures, planning, and all other documentation and data that define the PMP and the parts selected for use shall be made available to the FAA for its review. The FAA may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and adequacy of the implementing procedures.

&F Page &P

Instructions Approval Code This block indicates requirement for Government approval of the data item. Requirements are indicated by a one or two character code as follows:

CodeMeaning
AFormal, written approval is required prior to final acceptance of the data item by the Government. If it is determined that certain of the contractual requirements for this data item are not satisfied, the Government will notify the Contractor of each deficient area and will withhold final acceptance pending corrections of all deficiencies by the Contractor. Any revisions to approved documents shall also require formal written approval. In the event of conflict between the approved document(s) and the contract, including the SOW and all referenced specifications, the contract shall take precedence.
N/ANo approval required.

Frequency This block specifies the frequency of submittal for the data item. Data of a recurring type shall be submitted at the end of the reporting period established in this field unless otherwise indicated. Codes are as follows:

CodeMeaning
AnnlyAnnually
1 Time/ROnce with revisions
2 TimesTwice
MthlyMonthly
NLTNo later than

Date for First Submittal This block contains the date that the initial data submission is to be delivered to the Government. This date may be an actual calendar date or keyed to an event. Codes are as follows:

Code
Meaning
TBPTo Be Proposed

Date of Subsequent Submission For data that is submitted more than once, this block contains the requirements for all submissions after the initial submittal. Codes used are the same as those used for Column F.

Distribution and Addresses Unless otherwise indicated on the CDRL, the electronic format will be delivered via email, KSN or FTP server, compatible with Microsoft Windows/Office Suite of products and as approved by the Government. All CDRLs must be delivered in both editable and non-editable format. Electronic submissions must be in accordance with FAA Order 1600.75. The designation "LT" indicates that a copy of the Letter of Transmittal is required for that addressee. All Electronic submissions will be the property of the FAA and the FAA reserves the right to reproduce all documents for FAA use.

&12J-7 Contract Data Requirements Listing.1.5 Page &P image1.emf

File details come from the government source that posted it. Updated .