Attachment_C._Sustainability_Campus_Site_Map.pdf

PDF 10 MB Posted

Attached to
Commissioning Consulting Services for New Building Construction Projects State and local contract opportunity
Solicitation number
324053
Issued by
Dane County, Madison City, Wisconsin

About this file

The document is a Conceptual Site Plan (Option 5) for the Dane County Sustainability Campus, located at 7103 Millpond Road in Madison, Wisconsin. The site plan depicts a comprehensive layout for a waste management and sustainability facility, featuring multiple functional areas including a visitor entrance, trash lab, tour start point, scale lanes, parking areas, and a large waste management area. The plan includes three primary buildings: an Education and Administration Center (28,000 square feet), a Maintenance Facility/Shop (13,000 square feet), and a Scale Office (1,200 square feet). The site design incorporates various traffic flow patterns for residential vehicles, heavy trucks, commercial vehicles, and staff vehicles, with designated lanes and scales for different types of waste transportation.

The site plan shows sophisticated design elements such as a parking area that can double as an event space, a pavilion with a windmill blade sculpture, and careful consideration of slope gradients and jurisdictional boundaries. The layout demonstrates forward-thinking sustainability principles, with strategic placement of buildings, traffic routes, and green spaces. The plan includes future expansion considerations, such as potential bypass lanes and additional scale infrastructure. The conceptual design is dated 01/07/2025 and was developed by Foth, Saiki, and Strang design firms, indicating a collaborative approach to the campus planning.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VISITOR ENTRANCE,

TRASH LAB & TOUR

START POINT

TURNAROUND FOR STAFF

VEHICLES TRANSPORTING

WASTE FROM RESIDENTIAL

DROPOFF TO LANDFILL

6% SLOPE

6% SLOPE

CITY JURISDICTION

COUNTY JURISDICTION

01/07/2025

PATIO & STAFF

ENTRANCE

PARKING DESIGNED TO DOUBLE

AS EVENT SPACE (SEE PIAZZA AT

THE AGORA AT FITCHBURG

CENTER IMAGES)

PAVILION / WINDMILL BLADE

SCULPTURE / ACTUAL WINDMILL

(SEE WIND CATHEDRAL IMAGE)

8% SLOPE

SCALE LANES:

RESIDENTIAL INBOUND

HEAVY TRUCK SCALE

COMMERCIAL SCALE

(SCALE HOUSE)

COMMERCIAL OUTBOUND SCALE

BYPASS LANE (FUTURE OUTBOUND SCALE)

FUTURE BYPASS LANE

VEHICLE TRAFFIC KEY:

RESIDENTIAL VEHICLES

HEAVY TRUCKS

COMMERCIAL VEHICLES

STAFF VEHICLES

ach2 Text Box Buildings:

1. Education and Administration Center: 28,000 SF

2. Maintenance Facility/Shop: 13,000 SF

3. Scale Office: 1,200 SF

Note: Building square footage (SF) is approximate and subject to change. Education and Administration Center is anticipated to be two-stories.

File details come from the government source that posted it. Updated .