Anticipated_Systems_to_be_Commissioned_for_Sustainability_Campus.pdf

PDF 104 KB Posted

Attached to
Commissioning Consulting Services for New Building Construction Projects State and local contract opportunity
Solicitation number
324053
Issued by
Dane County, Madison City, Wisconsin

About this file

The document is a comprehensive list of anticipated systems to be commissioned for the Dane County Sustainability Campus project, detailing specific technical systems across multiple construction divisions. The systems span Divisions 3-8 for General Construction (including Building Envelope Sealing), Division 22 for Plumbing (Domestic Water and Hot Water Systems), Division 23 for HVAC (including Temperature Control, Building Automation Systems, and various mechanical equipment), Division 26 for Electrical systems, Division 27 for Communications, Division 28 for Electronic Safety and Security, and Divisions 32 & 33 for Exterior Improvements and Utilities.

The document provides a detailed inventory of technical systems to be commissioned, indicating a comprehensive approach to establishing infrastructure for the Sustainability Campus. Key systems include lighting controls, communication cabling, fire alarm systems, access control, video surveillance, high voltage electric vehicle charging stations, and various mechanical and electrical infrastructure components. The breadth of systems suggests a complex, technologically advanced facility with a focus on sustainable and integrated building systems, likely supporting Dane County's renewable energy and waste management objectives.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Anticipated Systems to be Commissioned

(Sustainability Campus)

Divisions 3 thru 8 - General Construction Building Envelope Sealing & Infiltration

Division 22 - Plumbing Domestic Water Systems Domestic Hot Water Systems Plumbing Equipment Plumbing Fixtures Fuel Piping Systems

Division 23 - Heating, Ventilating & Air Conditioning

(HVAC)

Temp. Control & Building Automation Systems Testing & Balancing Variable Frequency Drives Piping Systems, Valves & Specialties Pumps Ductwork, Duct Accessories & Casing Systems Filtration Coils & Heat Exchangers Fans & Air Handlers Compressors & Condensing Units Chillers & Cooling Towers Computer Room Air Conditioning Equipment Boilers & Fuel Fired Equipment Terminal Units Fan Coils, Unit Ventilators, Unit Heaters Energy Recovery Systems Smoke Control Systems

Division 26 - Electrical Lighting & Daylighting Controls Lighting Fixtures & Contactors Exterior Site Lighting & Controls Motor Starters & Motor Control Centers Disconnect Switches & Circuit Breakers Generators & Transfer Switches Metering / Submetering Surge Protective Devices Transformers

Division 27 - Communications Communication Cabling, Outlets & Equipment Audio / Visual Systems Scale Software Integration

Division 28 - Electronic Safety and Security Fire Alarm Systems Access Control Systems Video Surveillance Systems Supervisory Control and Data Acquisition Systems

Divisions 32 & 33 - Exterior Improvements & Utilities Fuel Storage & Distribution Systems High Voltage Electric Vehicle Charging Station