Attachment_D._Sustainability_Campus_Project_Schedule.pdf
PDF 127 KB Posted
- Attached to
- Commissioning Consulting Services for New Building Construction Projects State and local contract opportunity
- Solicitation number
- 324053
- Issued by
- Dane County, Madison City, Wisconsin
About this file
The document is a comprehensive work plan for the Dane County Sustainability Campus project, developed by STRONG, dated October 25, 2024. The project is divided into seven distinct phases spanning from October 2024 to January 2027, with key milestones including needs assessment, concept drawings, design development, permitting, construction documents, and bid assistance. The work plan outlines a detailed timeline for project activities, featuring multiple coordination meetings with the owner, design team, city departments, and regulatory bodies, with quality assurance (QA) checkpoints at 25%, 50%, 75%, and 100% completion stages.
The project schedule indicates budget estimates and owner reviews at critical junctures, with specific focus on mechanical systems, electrical systems, technology, site/civil systems, and site permitting. The timeline shows site and building permitting processes, design development, and preparation of documents such as block & stack diagrams, FF&E lists, and preliminary code reviews. The construction is scheduled to be completed in January 2027, with phases covering preliminary concept work, detailed design development, construction documentation, and final bid and contract processes. The work plan demonstrates a structured approach to project management, emphasizing collaborative review, iterative design refinement, and systematic progression through project phases.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Commissioning_Consulting_Services_for_New_Building_Construction_Projects_(Addendum_#2_Revision).pdf | ||
| Anticipated_Systems_to_be_Commissioned_for_Sustainability_Campus.pdf | ||
| Anticipated_Systems_to_be_Commissioned_for_RNG_Maintenance_Shop.pdf | ||
| DRAFT_Compensation_Schedule.pdf | ||
| Attachment_B._Sub._1_to_Res._152,_2013-2014_-_2014_Dane_County_Capital_Budget_Appropriations_Resolution.pdf | ||
| Attachment_E._Dane_County_Green_Building_Policy.pdf | ||
| Dane_County_Design_Guidelines_&_Recommendations.pdf | ||
| Attachment_C._Sustainability_Campus_Site_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Plan - Updated: Oct 25, 2024
MEETINGS---------------->>
PRE-CONSTRUCTION SUBSTANTIAL
MEETING COMPLETION MTG.
DELIVERABLES----------------------->>
2024 2025 2026
MAY JUN JUL AUG SEP
Dane County Sustainability Campus
OCT NOV DEC JAN FEB MAR APR MAY OCT NOVJUN JUL AUG SEPT DEC JAN FEB MAR APR
PHASE 1
PHASE 4 - CONST. DOCUMENTS
PHASE 2 & 3 - DESIGN DEV. / PERMITTING
PHASE 1 - CONCEPT DWGS
- FLOOR PLAN CONFIRMATION
- CODE REVIEW
- BUILDING MATERIAL REVIEW
- INTERIOR DESIGN CONCEPTS
- EXTERIOR BUILDING CONCEPTS
- BUDGET
PHASE 4 - CONST. DOCUMENTS-
- PAGE FLIP
- REVIEW ESTIMATES
- DESIGN SIGN-OFF
- FRONT END SPECIFICATIONS
- FINAL COORDINATION
PHASE 4 - BID ASSISTANCE
- PRE-BID TOUR OR MEETING
- BID REVIEW
- DISCUSS CONTRACTS
PHASE 5 - DOCUMENTATION
- O&M MANUALS
- ON-SITE TRAINING
- PUNCH LIST WALK-THRU
- CLOSE-OUT COMMISSIONING
PHASE 2 & 3 - DESIGN DEV. /
PERMITTING
- MECHANICAL SYSTEMS
- ELECTRICAL SYSTEMS
- TECHNOLOGY
- SITE / CIVIL SYSTEMS
- SITE PERMITING
- INITIAL ESTIMATES
PHASE 5 - CONST. ASSISTANCE
- PRE-CONSTRUCTION
- FIELD VISITS
- PROGRESS MEETINGS
1 2 3 4 5 6
C
D
B
4 4
PHASE 4 - BID ASSISTANCE
PHASE 5 - CONSTRUCTION ASSISTANCE AND DOCUMENTATION
E
DESIGN TEAM
COORDINATION MTG
OWNER
COORDINATION MTG
CD
100%
QA
95%
QA
QA
OWNER
REVIEW
BUDGET
ESTIMATE
A
BUDGET
ESTIMATE
CONSTRUCTION
COMPLETE
BY
JAN. OF 2027
OWNER REVIEW
REGULATORY APPROVAL
MTG
1 3 4
SITE PERMITTING
P P
CITY DEPARTMENTS
2 5 6 7
BUILDING PERMITTING
8 9
BUDGET
ESTIMATE
2 2 2 2 2
3 3 3 3 3 3
F
PHASE 1 - NEEDS ASSESS
- LISTEN
- DATA GATHERING
- VISIONING
- DISCOVER
- BENCHMARKING
- PROGRAMMING
- DESIGN
- BLOCK & STACK DIAGRAMS
P
P
PHASE 2 & 3 - DESIGN DEV./PERMITS
- DEFINED SYSTEMS
- INITIAL ESTIMATE
- FF&E LIST
- DD LEVEL DOCUMENTS
- SITE DEVELOPMENT PERMITS
PHASE 4 - BIDDING ASSISTANCE
- FINAL BID RESULTS
- CONTRACT AWARDS
- BUILDING PLAN APPROVALS
PHASE 4 - CONST. DOCUMENTS
- PLANS
- SPECIFICATIONS
- UPDATED ESTIMATE
PHASE 5 - CONSTRUCTION
- PROGRESS MTG. MINUTES
- FIELD REPORTS
- SHOP DRAWINGS
- CHANGE CONTROL TRACKING
- APPLICATIONS FOR PAYMENT
- PUNCH LISTS
- O&M MANUALS
- WARRANTIES
C D E FPHASE 1 - CONCEPT DRAWINGS
- PRELIMINARY CODE REVIEW
- FINAL BUDGET
- SCHEMATIC DRAWINGS
B
PHASE 1 - NEEDS ASSESSMENT
- PROGRAM STATEMENT
- WORK PLAN
- INITIAL BUDGET
A
2 22
75%
QA
50%
QA
25%
QA
OWNER REVIEW
CD
50%
QA
CD
75%
QA
File details come from the government source that posted it. Updated .