Attachment_C.pdf

PDF 238 KB Posted

Attached to
Landfill Stormwater Collection & Gas System Repair & Installation
Solicitation number
B-2-25-27
Issued by
Brevard County, Florida

About this file

This document is a detailed technical engineering drawing set for a Landfill Gas (LFG) Extraction and Collection System, specifically for Brevard County's Solid Waste Management Department in Florida. The technical drawings provide comprehensive schematics for various critical infrastructure components, including vertical well pipe perforation, geomembrane boot details, gas header/stormwater letdown crossings, air supply line valves, air line termination and blow-off valves, and LFG lateral tie-in details.

The drawings specify precise technical specifications for constructing and installing landfill gas extraction infrastructure, including detailed cross-section views of well construction, pipe junctions, valve placements, and geological interface requirements. The engineering drawings demonstrate a comprehensive approach to managing landfill gas extraction, stormwater management, and associated piping systems, with multiple detailed views showing installation methods, material specifications, and structural integration techniques across different components of the gas collection system.

View the file

Other files

File Type Posted
Bid_Tabulation.pdf PDF
NOA.pdf PDF
Bid_Tabulation_-_Notice_of_Intent_2.pdf PDF
Bid_Tabulation_-_Names_Only_3.pdf PDF
Addendum_4.pdf PDF
B-2-25-27_Addendum_3.pdf PDF
B-2-25-27_Addendum_2.pdf PDF
B-2-25-27_Addendum_1.pdf PDF
Attachment_B_-_FEMA_BYRD_Contract_Provisions.pdf PDF
Attachment_A_-_Price_Sheet_2024.xlsx XLSX spreadsheet
B-2-25-27_Inv_+_Specs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .