ATTACHMENT C - BASE OFFER PRICE BREAKDOWN FORM.docx
DOCX document 21 KB Posted
- Attached to
- Z2DA--565-26-110 REPLACE AHU 34
- Solicitation number
- 36C24626Q0827
About this file
This is a Base Offer Price Breakdown Form that serves as a pricing template for responses to RFQ Number 36C24626Q0784, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The form is designed for the replacement of Air Handling Unit #34 under Project 565-26-110. Offerors are required to provide itemized pricing across multiple construction divisions, including labor and material costs broken down by the following categories: General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, Transportation, and Electrical Power Generation.
The form requires contractors to calculate subtotals for all line items and then add overhead, profit, insurance, and bonding costs at percentages to be specified by the offeror, with a final total base proposal price. This template is part of a solicitation that has been superseded by Solicitation Number 36C24626Q0827 due to a technical error in the original RFQ, with adjusted due dates and times reflected in the replacement solicitation.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE PROPOSAL ITEM PRICE BREAKDOWN FORM
RFQ NUMBER: 36C24626Q0784
PROJECT NO./TITLE: Project 565-26-110, Replace Air Handling Unit #34
OFFEROR:
| ITEM |
| DESCRIPTION |
| Labor |
| Material |
| Total Cost |
| Division 1 |
| General Requirements |
| Division 2 |
| Existing Conditions |
| Division 3 |
| Concrete |
| Division 4 |
| Masonry |
| Division 5 |
| Metals |
| Division 6 |
| Wood and Plastic |
| Division 7 |
| Thermal & Moisture Protect |
| Division 8 |
| Doors and Windows |
| Division 9 |
| Finishes |
| Division 10 |
| Specialties |
| Division 11 |
| Equipment |
| Division 12 |
| Furnishings |
| Division 13 |
| Special Construction |
| Division 14 |
| Conveying Equipment |
| Division 21 |
| Fire Suppression |
| Division 22 |
| Plumbing |
| Division 23 |
| HVAC |
| Division 25 |
| Integrated Automation |
| Division 26 |
| Electrical |
| Division 27 |
| Communications |
| Division 28 |
| Electronic Safety & Security |
| Division 31 |
| Earthwork |
| Division 32 |
| Exterior Improvements |
| Division 33 |
| Utilities |
| Division 34 |
| Transportation |
| Division 48 |
| Electrical Power Generation |
Divisions Subtotal:
Overhead/Profit and Insurance
Bond (___%)
Overhead (___%)
Profit (___%)
Subtotal:
TOTAL BASE PROPOSAL ITEM PRICE