This is a technical specifications document for a mobile rock crusher required by the United States Air Force. The Air Force is procuring one (1) brand new Eagle Rock Crusher or equivalent unit (NSN 3820-01-065-3914) capable of processing 200 tons per hour or greater for secondary and tertiary crushing operations. The unit must be track-mounted with a 400 horsepower diesel engine (DEF or REGEN systems acceptable for worldwide operation), featuring a 4-5 cubic yard hopper with two-stage grizzly feeder, jaw crusher with minimum 36" x 24" inlet, two pre-screen decks of at least 20 square feet each, and dual conveyor systems (40-48" wide main conveyor, 24-26" wide side conveyor). All hydraulic and engine fluids, check locations, and controls must be clearly labeled, with the operator's station equipped with safety platforms, ladders, and standard engine monitoring gauges.

The equipment must include manufacturer's standard corrosion/rustproof protection with a minimum five-year life expectancy (automotive-grade primer/paint only; powder coating unacceptable), a 12-month manufacturer warranty, and complete parts and service manuals in both hard copy and electronic format at delivery. The contractor is responsible for delivery to the United States west coast port with final destination in Yigo, Guam. Mandatory familiarization training includes initial operator setup (minimum 24 hours on-site) and maintenance setup (minimum 24 hours on-site) at one location, with warranty commencing upon completion of familiarization. Military data plates with specified nomenclature, serial number, NSN, weight specifications, delivery date, contract number, and shipping details must be affixed to the equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF-Rock Crusher

Requirement Title: Rock Crusher
Agency: AF
QTY: 1
Specifications or Equal:ComplyException
Brand: Eagle Rock Crusher or Equal
Must be brand new
Part Number: NSN: 3820-01-065-3914 (1ea)

SCRNG PLT 200 TPH and UP (Crushing Machine) (D794)

MACHINE REQUIREMENTS
•Capable of processing up to 200 and Over Tons Per Hour producing a wide variety of coarse, medium and fine crushings
•Mobile cone crusher designed especially for secondary and tertiary crushing
•Equipped with return conveyor and either single or double-deck screen
•Track-mounted unit
POWER UNIT
•400 horsepower @ 1800-2100 rpms
•Export Engine: Diesel Exhaust Fluid (DEF) or REGEN systems acceptable, must be capable of operating world-wide. No Ultra-Low Sulfur Diesel (ULSD) – Tier 3 Diesel or equal
oFuel capacity fuel tank
o Tank(s) labeled: “Diesel Fuel Only”
· Capable of operating minimum 30 hours continuous without servicing, other than refueling
· Hydraulic generator
· Power Take-Off
HOPPER/FEEDER
· 4-5 cubic yards
· Two-stage grizzly feeder
· Nominal spacing grizzly
· Feed hopper extensions
JAW CRUSHER
· Jaw inlet: minimum 36 inches x 24 inches
· Min Closed Side Setting (CSS): 1.5-inch recycled / 2-inch natural rock
· Max CSS: 5-inch
· Hydraulic jaw adjustable
CRUSHER
· Direct Drive
· Feed opening: 6 - 8 inches
· Engine power: 200 - 220 horsepower
PRE-SCREEN DECKS
· Deck: Two (2)
· Minimum 20 square feet
MAIN CONVEYOR
· Width: 40 – 48 inches
· Length: 30 - 40 feet
· Discharge height 9 - 11 feet
· Main conveyor height adjustable
· Discharge hood – main conveyor
· Dust encapsulation for conveyors
· Extended main conveyor
SIDE CONVEYOR
· Width: 24 -26 inches
· Length: 20 - 24 feet
· Discharge height: 10-12 feet
FLUIDS
· Maximum capacity
o Diesel fuel
§ Fuel filling pump
§ Fuel truck connection port
o Hydraulic oil
o Engine oil
o Filter kit
o Hight pressure water dust control sprayer with replaceable nozzles
· All check locations clearly labeled
OPERTOR’S STATION
· All controls clearly labeled, illuminated
o Safety platform with ladder/handles for accessing
o Standard machine gauges for monitoring engine operations, fuel, oil pressures, travel controls, conveyor and crusher operations, etc
· Ladder/safety rails for climbing on/off machine
PAINT/CORROSION PROTECTION
· Manufacturer’s standard color
· Maximum manufacturer’s factory corrosion/rustproof protection package throughout
· Minimum 5-year life expectant on rustproof/corrosion protection
Automotive grade primer/paint
· NOTE: Powder coating not acceptable
PARTS and SERVICE MANUALS
· Complete set of manuals available at time of delivery to the Air Force, No Exceptions (1 Hard copy per location, electronic copy to program office)
· Includes parts breakdown, service manual and schedule, repair processes for all parts/components of machine, No Exceptions
· What is your Standard Warranty? USAF minimum requirement is 12 months.
Manufacturer/Dealership will include
· Familiarization, one per location – FB5000 and FB5587
o Initial operator’s set-up (minimum 24 hours, on-site)
o Initial maintenance set-up (minimum 24 hours, on-site)
o Warranty starts upon completion of Familiarization
· Military Marking/Data Plate(s)
· Data Plates will include the following information, at a minimum:
NOMENCLATURE: ___________________________
MAKE AND MODEL: _________________________
MANUFACTURERS SERIAL NUMBER: (VIN____________________)
REGISTRATION #: ___________________________
NSN: _______________________________________
Asset NSN: _______________________________________
VEHICLE CURB WEIGHT:______________LBS
PAYLOAD, MAXIMUM:______________LBS
GROSS WEIGHT MAX:______________LBS
GROSS WEIGHT COMB MAX:__________LBS
DATE OF DELIVERY:__________________
WARRANTY:__________MO___________MILES
CONTRACT NUMBER:______________________
ORDER NUMBER:__________________________
SHIP TO:__________________________________
MARK FOR: _______________________________
US PROPERTY
Delivery Address:
Yigo, Guam (Full address provided at time of award)
Contractor responsible for delivery to United States west-coast port
Delivery POC:
To be provided at time of award. Delivery must be schedule with POC 24 hours prior.

File details come from the government source that posted it. Updated .