This document contains an attachment with a pricing schedule for the remodel of an emergency department for observation beds. The schedule provides line item estimates for materials, labor, and total costs for general requirements, existing conditions, and various construction divisions including electronic safety and security. The total proposed cost is $14,000.

The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration VISN 21 to remodel the emergency department at the Fresno VA Medical Center to add observation beds. The solicitation number is provided. Pricing is fixed at the rates specified in the attached schedule.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet -RFI 1-38 -ED Beds 02212023.pdf PDF
36C26123R0008 0007.docx DOCX document
36C26123R0008 0006.docx DOCX document
WD_CA20230018_02102023.pdf PDF
36C26123R0008 0005.docx DOCX document
Technical Question Tracking Sheet -RFI 1-36 -ED Beds-MRP-020823.pdf PDF
36C26123R0008 0004.docx DOCX document
36C26123R0008 0003.docx DOCX document
Site Visit_01262023 Sign in Sheet.pdf PDF
36C26123R0008 0002.docx DOCX document
36C26123R0008 0001.docx DOCX document
570-17-210.OPC.DWG.20230112Part-1.pdf PDF
Attachment A_Factor 1_Experience_01052023.xlsx XLSX spreadsheet
570-17-210.OPC.Specs.20221024.pdf PDF
ACM Report.pdf PDF
WD_CA29_11042022.pdf PDF
570-17-210.OPC.DWG.20221021Part-2.pdf PDF
Attachment C_Large Business Subcontracting Plan Template_01032023.docx DOCX document
570-17-210.OPC.DWG.20221021Part-3.pdf PDF
36C26123R0008.docx DOCX document
Attachment D_Request for Information (RFI) Form_36C26123R0008.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT B - PRICING SCHEDULE
Remodel Emergency Department for Observation Beds
DESCRIPTIONMATERIALLABORTOTAL
General Requirements
Project Manager$ 1.00$$ 1.00
Superintendent/Safety$ 1.00$$ 1.00
Quality Control Manager$ 1.00$$ 1.00
Site Facilities/Equipment$$$ - 0
Laborer$$ 1.00$ 1.00
Mobilization$$ 1.00$ 1.00
$$$ - 0
General Requirements Total$ 3.00$ 2.00$ 5.00
Existing Conditions
$$$ - 0
$ 1.00
$$$ 1.00
Existing Conditions Total$ 1.00$ - 0$ 1.00
Concrete
$$$ - 0
$$$ - 0
Concrete Total$ - 0$ - 0$ - 0
Metals
$$$ - 0
$$$ - 0
Metals Total$ - 0$ - 0$ - 0
Thermal & Moisture Protection
$$$ - 0
$$$ - 0
Thermal & Moisture Protection Total$ - 0$ - 0$ - 0
Openings
$$$ - 0
$$$ - 0
Openings Total$ - 0$ - 0$ - 0
Finishes
$$$ - 0
$$$ - 0
Finishes Total$ - 0$ - 0$ - 0
Specialties
$$$ - 0
$$$ - 0
Specialties Total$ - 0$ - 0$ - 0
Equipment
$$$ - 0
$$$ - 0
Equipment Total$ - 0$ - 0$ - 0
Furnishings
$$$ - 0
$$$ - 0
Furnishings Total$ - 0$ - 0$ - 0
Special Construction
$$$ - 0
$$$ - 0
Special Construction Total$ - 0$ - 0$ - 0
Fire Suppression
$$$ - 0
$$$ - 0
Fire Suppression Total$ - 0$ - 0$ - 0
Plumbing
$$$ - 0
$$$ - 0
Plumbing Total$ - 0$ - 0$ - 0
HVAC
$$$ - 0
$$$ - 0
HVAC Total$ - 0$ - 0$ - 0
Integrated Automation
$$$ - 0
$$$ - 0
Integrated Automation Total$ - 0$ - 0$ - 0
Electrical
$$$ - 0
$$$ - 0
Electrical Total$ - 0$ - 0$ - 0
Communications
$$$ - 0
$$$ - 0
Communications Total$ - 0$ - 0$ - 0
Electronic Safety and Security
$ 1.00$ 1.00$ 2.00
$$$ - 0
Electronic Safety and Security Total$ 1.00$ 1.00$ 2.00
Sub Total$ 5.00$ 3.00$ 8.00
Overhead$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Profit$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Bonds and Insurance$ 1.00$ 1.00$ 2.00
TOTAL$ 8.00$ 6.00$ 14.00