570-17-210.OPC.DWG.20230112Part-1.pdf

PDF 19 MB Posted

Attached to
Z2DA--Remodel Emergency Department (ED) Observation Bed Fresno
Solicitation number
36C26123R0008
Issued by

About this file

This federal contract opportunity is for remodeling the emergency department observation bed area at the Fresno VA Medical Center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is soliciting proposals under solicitation number 36C26123R0008 to remodel the existing ED observation bed area. Offerors should provide design and construction services to upgrade the space for patient care, including modifications to the floor plan, replacement of fixtures and equipment, installation of monitoring systems, and related construction activities. Proposals are due by January 23, 2023 and the contract is expected to be awarded by April 15, 2023. The period of performance is 270 days following award.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet -RFI 1-38 -ED Beds 02212023.pdf PDF
36C26123R0008 0007.docx DOCX document
36C26123R0008 0006.docx DOCX document
WD_CA20230018_02102023.pdf PDF
36C26123R0008 0005.docx DOCX document
Technical Question Tracking Sheet -RFI 1-36 -ED Beds-MRP-020823.pdf PDF
36C26123R0008 0004.docx DOCX document
36C26123R0008 0003.docx DOCX document
Site Visit_01262023 Sign in Sheet.pdf PDF
36C26123R0008 0002.docx DOCX document
36C26123R0008 0001.docx DOCX document
Attachment A_Factor 1_Experience_01052023.xlsx XLSX spreadsheet
570-17-210.OPC.Specs.20221024.pdf PDF
ACM Report.pdf PDF
WD_CA29_11042022.pdf PDF
570-17-210.OPC.DWG.20221021Part-2.pdf PDF
Attachment C_Large Business Subcontracting Plan Template_01032023.docx DOCX document
570-17-210.OPC.DWG.20221021Part-3.pdf PDF
Attachment B_Supplemental Price Breakdown_11222022.xlsx XLSX spreadsheet
36C26123R0008.docx DOCX document
Attachment D_Request for Information (RFI) Form_36C26123R0008.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E. SHIELDS AVE

E. CLINTON AVE

N

B L A

C K

S T

O N

E A

V E

E. SHIELDS AVE

E. MCKINLEY AVE

E. OLIVE AVE

N

F R

E S

N O

S T

N

F

IR

S T

S T

N

C E

D A

R A

V E

N

M A

P L E

A V

E

VACCHCS

PROJECT REVIEW

DATE: APPROVED: DIRECTOR

DATE: APPROVED: CHIEF OF STAFF

DATE: APPROVED: CHIEF, SAFETY SERVICE

DATE: APPROVED: CHIEF ENGINEER

DATE: APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES

DATE: APPROVED: CONTRACTING OFFICER

DATE: APPROVED: CONTRACTING OFFICER'S REPRESENTATIVE

N O R T H

F R E S N O

S T R E E T

EAST HARVARD AVENUE

N O R T H

A N G U S

S T R E E T

EAST CLINTON AVENUE

TANK

O2

TANK

O2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ELECTRICAL: MECHANICAL:

P2S ENGINEERING, INC.

5000 E. SPRING STREET, 8TH FLOOR

LONG BEACH, CA 90815-5218

562.497.2999

B31

B3

B32

B24

B25

B2

B22A

B1

OPC

B27

B34

B

B19& B19A

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O P

C .A

R C

H .r v t

/2

/2

:4

:2

P

M

G-000

GENERAL COVER SHEET

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

ISSUED FOR CONSTRUCTION

09/11/2022

570-17-210 REMODEL ED BEDS FOR OBSERVATION BEDS - OPC

VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM

VICINITY MAP

NOT TO SCALE THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY

INSPECTIONS, TESTING AND WRITTEN REPORTS FOR ALL

DIVISIONS ARE PAID BY THE GENERAL CONTRACTOR.

CONTRACTOR SHALL EMPLOY THIRD-PARTY INSPECTION

CONSULTANTS TO PERFORM ALL INSPECTIONS REQUIRED BY THIS

CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY

REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY

INSPECTOR QUALIFIED TO PERFORM THE WORK. CREDENTIALS

SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY THIS

CONTRACT. ALL INSPECTIONS, TESTING CERTIFICATIONS, AND

PERMITS ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR.

THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED

INSPECTIONS. VA INSPECTIONS ARE FOR VA USE ONLY, WHEN

PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN ON

THE CONTRACTOR.

SCOPE OF WORK

Section 01 00 00

1. STATEMENT OF BID ITEM(S)

A. CLIN 0001 - ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction, alterations, and necessary removal of existing systems and structures and construction or and certain other items. Project includes modifications to existing HVAC, electrical, and IT.

A new variable air volume air handling unit (AHU-3) will be installed in the basement mechanical room of Building OPC. The unit will be approximately 13,000 CFM and it will consist of an energy recovery wheel, an exhaust fan, a variable frequency drive, return air inlet plenum, a return air sound attenuator, a return/relief fan with fan wall technology and a variable frequency drive, a mixing box with an air side economizer, a MERV 7 pre-filter #1 , a MERV 11 pre-filter #2, a hot water reheat coil, a clean steam humidifier, a chilled water cooling coil, a heating hot water heating coil, a supply fan with fan wall technology and a variable frequency drive, a sound attenuator, final filters MERV 14, and a discharge plenum. Variable frequency drives will be provided for the supply, return, and exhaust air fans. The fixed minimum outside air will be pre-conditioned by the energy recovery ventilation section of the air handling unit. General exhaust will be provided for the toilet rooms, the soiled utility room, the soiled linen room, and the housekeeping closet as required and discharged to atmosphere via the energy recovery ventilation section exhaust air fan. The exhaust air discharge will be terminated a minimum of 25’-0” away from any outside air intakes and/or building opening and a minimum 10’ above the roof level. All spaces will be provided with outdoor air ventilation as required to maintain minimum design air changes per hour in compliance with ASHRAE, IMC, VA, and FGI medical facility design recommendations.

Provide new single duct terminal units with hospital grade liner, hot water reheat coil, valve actuator, airflow sensor, duct probe temperature sensor, and factory mounted Metasys controller shall be provided at each location identified on the mechanical plans and schedules. Additional items include a thermostat, a valve set, control wiring and conduit, and power wiring and conduit to provide a complete and operational system at each installation. Each valve set includes a stainless-steel hose with a Belimo or equal pressure independent control valve, strainer, and isolation valves on the HWS and HWR valve set. A network controller panel shall be provided to serve a maximum of 60 terminal units. Electrical 120V feeders shall be extended to each terminal unit with all associated conduit, mounting hardware, junction boxes and fittings. Each terminal unit shall be provided with a 120V/24V power supply to actuate the damper and valve controllers. New electrical feeders shall be supplied by new emergency power panels and circuit breakers as shown on the drawings.

In addition to sealing all new penetrations, Contractor is responsible for providing fire stopping for all existing, unprotected penetrations in the Area of Work. Contractor shall bid (100 penetrations and a deductive change order will be issued if the actual number is less than the estimated number.

All systems are to be commissioned as new with re-commissioning after one year from Government Acceptance. In addition provide seasonal commissioning per Specification 01 91 00 for all mechanical systems.

NO ACM (ASBESTOS CONTAINING MATERIAL) IS ALLOWED ON THIS PROJECT. NO

DUCT ADHESIVE OR ROOF ADHESIVE SHALL CONTAIN ACM. CONTRACTOR IS TO

SUBMIT ALL PRODUCT FOR REVIEW WITH A CERTIFICATE FROM THE PRODUCT

MANUFACTURER THAT NO ACM IS PRESENT IN THE PRODUCT.

Revisions: Date:

THERE IS NO LEAD OR ASBESTOS MATERIAL DESIGNED INTO THIS PROJECT.

SIGNATURE 09/11/2022 DATE

AUTHOR: MAT PERKINS, AIA, NCARB, PMP, LEED AP BD+C

TRIPLE C - THE A&E GROUP

/11

/20

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O P

C .A

R C

H .r v t

/1

/2

:3

:4

A

M

G-001

GENERAL DRAWING INDEX

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

- DRAWING INDEX -

SHEET NUMBER SHEET NAME 35% SUBMITTAL 65% SUBMITTAL 95% SUBMITTAL

100% PRE-FINAL

SUBMITTAL

100% FINAL

SUBMITTAL

GENERAL

G-000 GENERAL COVER SHEET Yes Yes Yes Yes Yes

G-001 GENERAL DRAWING INDEX Yes Yes Yes Yes Yes

G-002 GENERAL VA PROJECT NOTES Yes Yes Yes Yes Yes

G-050 GENERAL TYPICAL FIXTURE MOUNTING HEIGHTS Yes Yes Yes Yes Yes

G-101 GENERAL LIFE SAFETY PLAN AND CODE DATA Yes Yes Yes Yes Yes

G-102 PHASING PLAN No No No No Yes

G-103 PHASING PLANS No No No No Yes

GI200 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY MEASURES Yes Yes Yes Yes Yes

GI201 GENERAL PRECONSTRUCTION INFECTION CONTROL RISK ASSESSMENT No No No Yes Yes

CIVIL

CD101 CIVIL DEMO PLAN Yes

CS101 CIVIL SITE PLAN Yes Yes Yes Yes Yes

CS501 CIVIL DETAIL SHEET 1 No No Yes Yes Yes

STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES Yes

S-002 GENERAL STRUCTURAL NOTES CONTINUED Yes

S-350 FRAMING SECTION AND ENLARGED PLANS Yes

S-520 FRAMING DETAILS Yes

ARCHITECTURE

A-002 ARCHITECTURAL ABBREVIATIONS & SYMBOLS Yes Yes Yes Yes Yes

AD100 ARCHITECTURAL DEMO PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes

AD100B ARCHITECTURAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

AD150 ARCHITECTURAL DEMO REFLECTED CEILING PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes

AD150B ARCHITECTURAL DEMO REFLECTED CEILING PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

A-100 ARCHITECTURAL FLOOR PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes

A-100B ARCHITECTURAL FLOOR PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

A-100B-1 ARCHITECTURAL DIMENSION PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

AC100 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - OVERALL Yes Yes Yes Yes Yes

AC100B ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

A-200 ARCHITECTURAL PROPOSED BUILDING ELEVATIONS Yes Yes Yes Yes Yes

A-350 EXTERIOR WALL SECTIONS & DETAILS No No Yes Yes Yes

A-351 EXTERIOR ENLARGED PLANS & DETAILS No No No No Yes

A-401 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes Yes

A-402 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes Yes Yes

A-511 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes Yes

A-512 ARCHITECTURAL DETAILS No Yes Yes Yes Yes

A-601 ARCHITECTURAL DOOR SCHEDULE Yes Yes Yes Yes Yes

A-701 INTERIOR WALL TYPES Yes Yes Yes Yes Yes

A-721 HEAD-OF-WALL DETAILS Yes Yes Yes Yes Yes

A-722 PARTITION FRAMING DETAILS Yes Yes Yes Yes Yes

A-901 ARCHITECTURAL INTERIOR RENDERINGS No Yes Yes Yes Yes

SIGNAGE

AW100B ARCHITECTURAL SIGNAGE PLAN No No Yes Yes Yes

AW601 ARCHITECTURAL SIGNAGE NOTES AND SCHEDULE No No Yes Yes Yes

INTERIOR DESIGN

IN100B INTERIOR FINISH FLOOR PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

IN601 INTERIOR FINISH LEGEND & ROOM FINISH SCHEDULE Yes Yes Yes Yes Yes

IN701 INTERIOR FINISH COLOR BOARDS Yes Yes Yes Yes Yes

EQUIPMENT

Q-100B EQUIPMENT PLAN - LEVEL B - AREA B No Yes Yes Yes Yes

Q-600 EQUIPMENT SCHEDULE No Yes Yes Yes Yes

FIRE PROTECTION

FX001 FIRE PROTECTION LEGEND No No Yes Yes Yes

FXD100B FIRE PROTECTION DEMOLITION PLAN - LEVEL B - AREA B No No Yes Yes Yes

FX100B FIRE PROTECTION PLAN - LEVEL B - AREA B No No Yes Yes Yes

PLUMBING

P-001 PLUMBING LEGEND No No Yes Yes Yes

PD100B PLUMBING DEMOLITION PLAN - LEVEL B AREA B No No Yes Yes Yes

PD100D PLUMBING DEMOLITION PLAN - LEVEL B AREA D No No Yes Yes Yes

PP100B PLUMBING PLAN - LEVEL B AREA B No No Yes Yes Yes

PP100D PLUMBING PLAN - LEVEL B AREA D No No Yes Yes Yes

PG100B PLUMBING MEDICAL GAS PLAN - LEVEL B - AREA B No No Yes Yes Yes

P-701 PLUMBING SCHEDULES No No Yes Yes Yes

MECHANICAL

M-001 MECHANICAL LEGEND Yes Yes Yes Yes Yes

MS101 MECHANICAL TEMPORARY SITE PLAN Yes Yes Yes Yes Yes

MD100 MECHANICAL DEMO PLAN - OVERALL No No No No Yes

MD100A MECHANICAL DEMO PLAN -LEVEL B - AREA A Yes Yes Yes Yes Yes

MD100B MECHANICAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

MD100C MECHANICAL DEMO PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes

MD100D MECHANICAL DEMO PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes

MD102 MECHANICAL DEMO PLAN - ROOF LEVEL Yes Yes Yes Yes Yes

MH100 MECHANICAL DUCT PLAN - LEVEL B - OVERALL No No No No Yes

MH100A MECHANICAL DUCT PLAN - LEVEL B - AREA A Yes Yes Yes Yes Yes

MH100B MECHANICAL DUCT PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

MH100C MECHANICAL DUCT PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes

MH100D MECHANICAL DUCT PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes

MH102 MECHANICAL PLAN - ROOF LEVEL Yes Yes Yes Yes Yes

MP100A MECHANICAL PIPING PLAN - LEVEL B - AREA A No No Yes Yes Yes

MP100B MECHANICAL PIPING PLAN - LEVEL B - AREA B No No Yes Yes Yes

MP100C MECHANICAL PIPING PLAN - LEVEL B - AREA C No No Yes Yes Yes

MP100D MECHANICAL PIPING PLAN - LEVEL B - AREA D No No Yes Yes Yes

M-501 MECHANICAL DETAILS Yes Yes Yes Yes Yes

M-502 MECHANICAL DETAILS Yes Yes Yes Yes Yes

M-601 MECHANICAL AIR FLOW DIAGRAM - SUPPLY AIR Yes Yes Yes Yes Yes

M-602 MECHANICAL AIR FLOW DIAGRAM - RETURN & EXHAUST AIR Yes Yes Yes Yes Yes

M-701 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes

M-702 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes

M-703 MECHANICAL SCHEDULES Yes Yes Yes Yes Yes

M-704 MECHANICAL CUT SHEETS No Yes Yes Yes Yes

M-705 MECHANICAL CUT SHEETS No Yes Yes Yes Yes

M-801 MECHANICAL CONTROLS LEGEND Yes Yes Yes Yes Yes

M-802 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes

M-803 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes

M-804 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes Yes

M-805 MECHANICAL POINTS SCHEDULE Yes Yes Yes Yes Yes

M-901 MECHANICAL REFERENCES No No Yes Yes Yes

M-902 MECHANICAL REFERENCES No No Yes Yes Yes

ELECTRICAL

E-001 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS Yes Yes Yes Yes Yes

ED100A ELECTRICAL DEMO PLAN -LEVEL B - AREA A Yes Yes Yes Yes Yes

ED100B ELECTRICAL DEMO PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

ED100C ELECTRICAL DEMO PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes

ED100D ELECTRICAL DEMO PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes

ED102 ELECTRICAL DEMO PLAN - ROOF LEVEL Yes Yes Yes Yes Yes

EL100B ELECTRICAL LIGHTING PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

EP100A ELECTRICAL POWER PLAN - LEVEL B - AREA A Yes Yes Yes Yes Yes

EP100B ELECTRICAL POWER PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

EP100C ELECTRICAL POWER PLAN - LEVEL B - AREA C Yes Yes Yes Yes Yes

EP100D ELECTRICAL POWER PLAN - LEVEL B - AREA D Yes Yes Yes Yes Yes

EP102 ELECTRICAL POWER PLAN - ROOF LEVEL Yes Yes Yes Yes Yes

ET100B ELECTRICAL SYSTEMS PLAN - LEVEL B - AREA B Yes Yes Yes Yes Yes

E-601 PARTIAL ONE LINE DIAGRAM Yes Yes Yes Yes Yes

E-701 ELECTRICAL SCHEDULES AND DETAILS Yes Yes Yes Yes Yes

E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes Yes

Grand total: 108

Revisions: Date:

/11

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O P

C .A

R C

H .r v t

/1

/2

:3

:5

A

M

G-002

GENERAL VA PROJECT NOTES

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES

GENERAL SEALANT / CAULKING NOTES

GENERAL DEMOLITION

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED BY LOCAL AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR

TO FABRICATION AND CONSTRUCTION. IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS

ARE DISCOVERED FOLLOW PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR

INFORMATION (RFI).

4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES

AND LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL

KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER

AND PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE FULL SCOPE OF WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13

REQUESTS FOR INFORMATION (RFI).

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL

VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS.

REPORT DISCREPANCIES TO ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING WORK

RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION PRIOR TO BIDDING, THE

CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY TIME, METHOD, SYSTEM,

PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11. VV: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS VV IS NOT IN THE CONTRACT.

HOWEVER, THE CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK INDICATED AS VV.

12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH COR, INCLUDING STAGING

AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS,

INTERRUPTION OF UTILITIES. SEE SPECIFICATIONS.

13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S

WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION

IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH

FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.

14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN DISSIMILAR METALS. SEE

SPECIFICATIONS.

15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE

SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR

MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL

AS APPROVED BY ARCHITECT AND COR.

16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES,

MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL

AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.

17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK PERMITS TO BE COORDINATED WITH

COR. SUBMIT CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.

1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES ARE DISCOVERED AFTER THE BID FOLLOW PROCEDURES LISTED IN SECTION 01 33 23 PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.

2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION, SHOP DRAWINGS, AND COORDINATION DRAWINGS; CONTRACTOR SHALL VERIFY DIMENSIONS AND RECOMMEND DIMENSIONAL MODIFICATIONS AS

REQUIRED.

3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR ELEVATIONS.

4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.

MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION

RELATED TO EQUIPMENT SIZES AND CLEARANCES.

5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").

FLOOR PLAN DIMENSIONS

1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM OUTSIDE GRIDLINE TO OUTSIDE

GRIDLINE) AS SHOWN.

2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF MASONRY

WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.

3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").

4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR MAKES THE

PLACEMENT CLEARER, THE DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.

5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH" OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2"

(1/4" CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL DIMENSIONS.

6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS (2.5"-DOOR HANDLE PLUS

1" -WALL STOP PLUS 1/2" GB=4.0")

7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTED "CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES OF

FINISHES.

8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION REQUIRED.

ROOF PLAN DIMENSIONS

1. UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE TO A FIXED WALL AND

LADDER, OR MECHANICAL EQUIPMENT DETERMINED BY DUCT PENETRATIONS BETWEEN JOISTS.

2. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT RAILS, HVAC EQUIPMENT, SCREEN WALLS, ANTENNAS, WALK PADS, LADDERS, SCUPPER LOCATIONS, ETC., MAY BE LOCATED FROM MECHANICAL AND ELECTRICAL DRAWINGS OR LOCATED BY SCALING. CONFIRM ALL ROOF ITEM DIMENSIONS WITH THE ARCHITECT AND COR

PRIOR TO CONSTRUCTION.

VERTICAL DIMENSIONS

1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION ABOVE MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS.

ELEVATIONS BELOW 0'-0" ARE "-" (PREFIXED WITH A MINUS SIGN).

2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF DECKING OR

SHEATING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.

3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD- BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS). HEIGHT REFERENCES

SHOULD BE TO THE NEXT LOWER FINISH FLOOR ELEVATION

4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO. EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL PENETRATIONS, UNO.

5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR - ELEVATION CHANGE IN INCHES FROM THE FINISHED FLOOR ELEVATION (FFE) NEXT TO IT.

FIRE ALARM

1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN ACCORDANCE WITH CLASS "a"

PROTECTION OF NFPA 101 LIFE SAFETY CODE.

2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES; AND SECTION 28

31 00 FIRE DETECTION AND ALARM FOR APPROVAL PRIOR TO THE INSTALLATION.

FIRE EXTINGUISHERS

1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE

EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH

EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL

EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE.

EXIT AND EMERGENCY LIGHTING

1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH

LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND

CHANGES OF DIRECTION. EXIT WAY; CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A

SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED.

EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL.

EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2" BELOW

THE THRESHOLD.

2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC

GUIDELINES.

FIRE SPRINKLER SYSTEM

1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES TO BE RETAINED AND REUSED.

CONTRACTOR TO VERIFY THE EXACT SIZE AND LOCATION IN FIELD.

2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS TO BE INSTALLED IN ACCORDANCE

WITH 2016 NFPA 13.

3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD PIPED, NO FLEXIBLE CONNECTIONS ARE

PERMISSIBLE.

FIRE & SMOKE DAMPERS

1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED AND REUSED.

2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM. THE BUILDING IS EQUIPPED WITH A FIRE

SPRINKLER AND FIRE ALARM SYSTEM.

FIRE STOPPING

1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE STOPPING.

GENERAL

1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED

MANNER.

2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A

FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50

WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES

AND ADHESIVES NORMALLY APPLIED.

3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING

ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE

DENSITY NOT TO EXCEED 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84.

4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44"

ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING

HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. DOOR

CLOSERS (EXCEPT FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM AN OPEN POSITION OF

70 DEGREES, THE DOOR WILL TAKE AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE

LATCH, MEASURED FROM THE LEADING EDGE OF THE DOOR.

5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED:

A. INTERIOR DOORS - 5 lbs.

B. EXTERIOR DOORS - 8.5 lbs.

C. FIRE DOORS - 15 lbs.

8. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE

SEALED WITH A UL APPROVED METHOD AND MATERIAL.

1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION.

2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING THE PRE-CONSTRUCTION WALK THROUGH.

4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE REMOVAL, INSTALLATION OR CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE

WALL, FLOOR, AND/OR ROOF ASSEMBLY.

5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS. COORDINATE CONTRACTOR STAGING AREA AND PUBLIC

ACCESS WITH COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN PROJECT AREA.

6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.

7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED UTILITY & DEMOLITION WORK AND PROJECT PHASING NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH COR.

1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION MANUAL

FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR

REPAINTING WORK.

2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR

SPECIFICATION. REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING, SURFACE

TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF

OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER TYPES OF

PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND FACTORY

PRIMING.

3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT

INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT

PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS

(INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED,

UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER. PAINTING SCOPE ITEMS

MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS AND PAINTING GENERAL NOTES.

THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.

4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND EXTERIOR

EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED METAL

SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL

WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND MECHANICAL WORK IN

ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED OTHERWISE IN THE

PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND PLUMBING WORK IS COVERED

IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.

5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF

MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE INTENDED

OPERATION OF ANY ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.

6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE SURFACE IS LARGER

THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE ENTIRE

SURFACE SHALL BE REPAINTED TO ENCLOSING EDGES OR CORNERS.

7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND EQUIPMENT, PRE- FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM OR SURFACE, FOLLOW

PROCEDURES LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).

8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL

SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER, BRASS, BRONZE AND SIMILAR FINISHED MATERIALS.

9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS

WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED

AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL

CONCRETE IN PIPE SPACE.

10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY IF

PAINTED.

11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.

12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT.

1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE

EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS.

PROPER PRIMING MUST BE USED WITH SEALANTS.

2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE USED, FOLLOW PROCEDURES

LISTED IN SECTION 01 33 23.

3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND

VERTICAL CONCRETE JOINTS AND AS NOTED.

4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL

BE USED AT MASONRY AND CONCRETE CONTROL JOINTS.

5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE

PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT

UNLESS NOTED OTHERWISE.

6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.

7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED

EQUIPMENT FRAMES AND EXPOSED SUPPORTS.

8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL MATERIALS

(TILE TO BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).

9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.

10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.

11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE

ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.

12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.

Revisions: Date:

/11

EMERGENCY

EYEWASH

M

IN

6'

-8

M

IN

2'

-3

DIMENSION TO BOTTOM OF

KNEE SPACE

DIMENSION TO SPRAY HEAD

M A

X

3' -0

" M A

X 4'

-0

EMERGENCY

EYEWASH / SHOWER

DIMENSION TO

SPRAY HEAD

RECESSED OR SURFACE

MOUNTED F.E. CABINET

M A

X R

E A

C H

4' -0

" M A

X 5'

-0

M A

X

3' -3

ACCESSIBLE

ROBE HOOK

TOILET PAPER

HOLDER

TOILET

SANITARY

NAPKIN

DISPOSAL

N C

GRAB BARS

WALL

LAVATORY PAPER TOWEL

DISPENSER

SOAP DISPENSER

MIRROR, CENTER

OVER LAV

DIMENSION TO

COIN OPERATOR

SANITARY

NAPKIN

VENDOR

DIMENSION TO

BOTTOM OF

KNEE SPACE

DIMENSION

TO SPOUT

ELECTRIC

WATER

COOLER

TOWEL BAR

MIN

4'-0"

2' -1

2' -4

2' -9

M

IN

'-0

M

A X

4" 1'

-6

C L

C L

1' -6

3'-6" 1'-0"

2' -1

0"

MIN.

1'-6"

3' -5

3' -1

1"

C L

3' -7

M

IN

2'

-4

M A

X

3' -1

M A

X 4'

-0

CL CL

CL

C L

9" MAX

7" MIN

NOTE:

VERIFY ACCESORIES WITH TOILET SIZE

CL

5' -5

C L

ROBE HOOK

3'-4"

8"

1'-0"

GRAB BARS

3'-0" @ STF TLT

2'-0"

1' -6

2' -9

M

IN

'-0

M

A X

C L

16" MIN, 18" MAX

CL

1'-0" MIN.

CL

3'-0" CL

CLCL

SWING UP GRAB BAR,

OMIT AT STF TLT

2' -1

1"

C L

MIN.

1'-6"

1"

MARKER BOARD OR TACK

BOARD, 36" HIGH OR

HIGHER

TEMPERED GLASS MIRROR

WITH FRAME

MARKER BOARD OR TACK

BOARD, LESS THAN 36"

HIGH

7' -0

6' -0

M

IN

6' -2

1'-6"

(2) COAT HOOKS

ON PLAM STRIP

4' -6

C L

M A

X 4'

-0

C L

1'' BETWEEN CRASH RAILS

AND CORNER GUARD OR

DOOR FRAME

CRASH RAIL

CORNER GUARD

CRASH RAIL

PROTECTIVE WALL

COVERING

VERIFY W/

OWNER'S

FURNITURE 1'' BETWEEN HAND RAILS

AND CORNER GUARD OR

DOOR FRAME

CHAIR RAIL

CHAIRS (NIC)

HAND RAIL

CORNER GUARD

1' -0

3' -0

2' -6

2' -1

0"

C L

ADA AUTOMATIC DOOR

PUSH PAD

ROOM SIGNAGE MOUNT ON

LATCH SIDE OF DOOR

5' -0

2"

3' -4

C L

C L

COORDINATE LOW VOLTAGE AND HIGH VOLTAGE INSTALLATION WITH HARDWARE REQUIREMENTS. HARDWARE

INSTALLER TO CERTIFY POWER SOURCE IS SIZED FOR LEAF SIZE AND WEIGHT.

ENSURE ACCESSIBLE OPERATION IS ON UPS AND EMERGENCY POWER

1' -3

HEADWALL LEGEND

N POWER RECEPTACLE (NORMAL POWER)

C RED POWER RECEPTACLE (EMERGENCY POWER)

O OXYGEN

A MEDICAL AIR

V VACUUM

B BLANK

PH PHONE JACK

NC NURSE CALL

O

CB

AV

OAV

PH

C

B

C

C

CB

N

N

NC

O

CB

AV

OAV

PH

C

B

C

C

CB

N

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O P

C .A

R C

H .r v t

/2

/2

:4

:3

P

M

G-050

GENERAL TYPICAL FIXTURE MOUNTING

HEIGHTS

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS N.

BLANCHARD

ISSUED FOR

CONSTRUCTION

1/4" = 1'-0" D6

TYPICAL EMERGENCY FIXTURES MOUNTING HEIGHTS

1/4" = 1'-0" B4

TYPICAL FIXTURE MOUNTING HEIGHTS

1/4" = 1'-0" C6

TYPICAL WALL MOUNT EQUIPMENT MOUNTING HEIGHTS

*NOTE NOT ALL ITEMS ARE USED. SEE FLOOR

PLANS AND ELEVATIONS FOR EQUIPTMENT .

1/4" = 1'-0" B2

TYPICAL WALL PROTECTION MOUNTING HEIGHTS

1/4" = 1'-0" D4

TYPICAL SIGNAGE MOUNTING HEIGHTS

3/8" = 1'-0"

D9

TYPICAL HEADWALL DETAIL

Revisions: Date:

/11

E

N

F

F

E

N

S

S

S

S

F

DN

LIFE SAFETY SYMBOLS

XX PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES REFER

TO SCHEDULE)

FIRE ALARM PULL

EXIT LIGHTING

XXX

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHERS

FIRE HOSE CABINETS

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

WIDTH PROVIDED

P: XX"

R: XX" 1A

WIDTH REQUIRED

APPLICABLE BUILDING CODES

• 2018 NFPA 101 LIFE SAFETY CODE & 2016 NFPA 72 NATIONAL FIRE ALARM AND

SIGNALING CODE & 2016 NFPA 13 STANDARD FOR INSTALLATION OF SPRINKLER

SYSTEMS. EXCEPTION OF NFPA 5000 AND NFPA 900

• 2018 INTERNATIONAL MECHANICAL CODE (IPC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2017 NATIONAL ELECTRICAL CODE (NEC)

• 2018 INTERNATIONAL PLUMBING CODE (IPC)

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN

CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN

SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF

STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW

FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS

AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:

MEMORANDUM OF UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,

ENERGY, AND TRANSPORTATION MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE

GENERAL REQUIREMENTS SECTION 01 00 00 AND 01 35 26 OF THE VA MASTER

CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD

62.1-2016; MEDICAL SPACES - ASHRAE 170-2013, NON-MEDICAL SPACES -

ASHRAE 62.1-2016

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD

15–2013

• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED BY VA

STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE STANDARD OR CODE

SHALL BE USED

APPLICABLE BUILDING GUIDES

• VA FIRE PROTECTION DESIGN GUIDE, 7TH EDITION (2015)

BUILDING CODE DATA

CONSTRUCTION TYPE:

TYPE III (200) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: RECONSTRUCTION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:

STRUCTURAL FRAME 0 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 0 HOURS

ROOFS/ CEILINGS 0 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS

STORAGE 1 HOURS

CLASSIFICATION OF OCCUPANCY:

EXISTING: AMBULATORY HEALTH CARE Occupancy per Chapter 20.

EXISTING: HEALTH CARE Occupancy per Chapter 18/19 18/19.1.1.4.2 (3) Changes of Occupancy. A change from a hospital or nursing home to an ambulatory health care occupancy shall not be considered a change in occupancy or occupancy subclassification.

18/19.1.1.4.3 REHABILITATION (1) MAJOR REHABILIATION SHALL INVOLVE THE

MODIFICATION OF THAN 50%, OR MORE THAN 4500 FT2, OF THE AREA OF THE

SMOKE COMPARTMENT.

MIXED BUILDING OCCUPANCY TYPE:

PRIMARY - HEALTHCARE

SECONDARY - AMBULATORY HEALTH CARE OCCUPANCY

6.1.14.1.3 Where incidental to another occupanct, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantilre, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or stucture, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section

8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

18.2.6.2.1 The travel distance between any point in a room and an exit shall not exceed 150 ft.

18.2.6.2.2 The maximum travel distance...shall be permitted to be increased by 50 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

HEALTH CARE OCCUPANCY; PROTECTED = 200'-0"

OCCUPANT LOAD:

18.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

CALCULATED OCCUPANT LOADS

PROJECT AREA = 90 TOTAL OCCUPANTS

MEANS OF EGRESS:

18.2.3 Capacity of Means of Egress.

18.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

18.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 44 in. (1120 mm).

18.2.4 Number of Means of Egress.

18.2.4.3 Not les than two exits of the types described in 18.2.2 shall be accessible from each smoke compartment.

18.2.4.4 Egress from smoke compartments addressed in 18.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.

PROTECTION OF VERTICAL OPENINGS:

18.3.1 Protection of Vertical Openings.

18.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

18.3.2 Protection from Hazards.

18.3.2.1 Hazardous Areas

18.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 18.3.2.1.2 and 18.3.2.1.3 shall be protected as indicated.

18.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material

18.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.

18.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

18.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

ENERGY CODE REQUIRMENTS:

CLIMATE ZONE 3B.

WALLS, ABOVE GRADE:

METAL FRAMED: R-13 + R-7.5CI

BOPC.1

A

BOPC.2 BOPC.3 4 5 65.A

A.1

B

B.1

C

D

E

BOPC.F

BOPC.G

CLINICAL

CHARTING

RM

B1C29B1C29

LOCKER

RM

B1C20AB1C20A

AREAWAY

103103

ELEVATOR

B-19B-19

VESTIBULE

106106

SOCIAL

WORK

OFFICE

B1C01B1C01

LINEN

CART

ALCOVE

TRANSFORMER

RM

B1C17AB1C17A

ON-CALL

RM

B1C18B1C18TOILET

B1C19B1C19

STAFF

LOUNGE

B1C20B1C20

STAIR

B1C21B1C21

TOILET

B1C08B1C08

TRAUMA

RM

SMALL

B1C06B1C06

TRAUMA

RM

LARGE

B1C07B1C07

X-RAY

ALCOVE

118118

CORRIDOR

B1C-4B1C-4

ELECTRIC

CLOSET

B1C16B1C16 TELEPHONE

CLOSET

B1C15B1C15

OBSERVATION/

TREATMENT

RM

B1C11B1C11

ENTRANCE

INTERVENTION

(SECLUSION)

ROOM

B1C28B1C28

TRIAGE

RM

B1C31B1C31

AOD/

CHECK-IN

B1C30B1C30

MECHANICAL

ROOM

B1C17B1C17

LINEN

CLOSET

B1C41B1C41

LINEN

CLOSET

B1C42B1C42

STAIR

NO.4

B1C43B1C43

ELEVATOR

EQUIP

RM

B1C40B1C40

LINEN

CLOSET

B1C39B1C39

CHIEF

OF ER

B1C35B1C35

HEAD

NURSE

B1C37B1C37

EMS

CLOSET

B1C36B1C36

CORRIDOR

B1C-1B1C-1

WAITING

B1C-1B1C-1

MALE

RR

B1C33B1C33

FEMALE

RR

B1C32B1C32

ELEVATOR

S-5S-5

PATIENT

COMFORT

ROOM

BC127BC127

CHARTING

ALCOVE

POLICE

DISPATCH

B1C02B1C02

CORRIDOR

B1C-5B1C-5

OBSERVATION/

TREATMENT

RM

B1C10B1C10

ELEV.

EQUIP/

SUMP

178178

OBSERVATION/

TREATMENT

RM

B1C12B1C12

OBSERVATION/

TREATMENT

RM

B1C13B1C13

OBSERVATION/

TREATMENT

RM

B1C09B1C09 OBSERVATION/

TREATMENT

RM

B1C14B1C14

C O

R R

ID

O

R B

C

-2 B

C

-2

PROCEDURE

RM

B1C05B1C05

WHEELCH.

SCALE

EXAM

AREA

B1C04B1C04

EXAM

AREA

B1C03B1C03

999 SF

651 SF

255 SF

181 SF

119 SF

177 SF

7126 SF

389 SF

178 SF

3500 SF

927 SF

VESTIBULE

154 SF

AREA TO BE RENOVATED

2,452 GSF

Occupancy Classification

(NFPA) HEALTH CARE

(NFPA) INDUSTRIAL

SMOKE COMPARTMENT 1

8,355 GSF

SMOKE COMPARTMENT 1

8,355 GSF

AREA TO BE RENOVATED

2,452 GSF

NEW

OBSERVATION

ROOM

B1C34KB1C34K

NEW

NURSES

STATION

B1C34FB1C34F

PAT TLT

B1C34JB1C34J

NEW

OBSERVATION

ROOM

BC24BC24

NEW

OBSERVATION

ROOM

B1C23B1C23

NEW

OBSERVATION

ROOM

B1C21B1C21

HAC

BC50BC50

SOILED

UTILITY

B1C53B1C53

CORRIDOR

B1C-9B1C-9

NURSE

STATION

B1C29AB1C29A

CORRIDOR

B1C-1AB1C-1A

SMOKE COMPARTMENT 2

7,263 GSF

OPC BUILDING 1

ELEVATOR

S-6S-6

B1

B1

B3

B12

SMOKE COMPARTMENT 2

7,263 GSF

B17

B17

B17

B17

B8

B10 B7

B6

B6

B6

B5

B4

B9

B19

B13B14

B15

CLEAN

UTILITY

B1C52B1C52

STF TLT

BC51BC51

P : 5

1/ 2"

R : 3

0"

P: 6' - 11" R: 3' - 0"

P : 6

R

: 3

0"

P : 2

1/ 2"

R : 3

0"

P : 3

1/ 2"

R : 3

0"

P: 3' - 8 1/2" R: 3' - 0"

P : 3

1/ 2"

R : 3

0"

P: 5' - 8" R: 3' - 0"

P: 7' - 8" R: 3' - 0"

CT

SCANNER

B1C46B1C46

EQUIP

STOR

B1C44B1C44

CONTROL

ROOM

B1C45B1C45

PAT

HOLDING

B1C47B1C47

HAC

B1C49B1C49

C O

R R

ID

O

R B

C

B C

PAT TLT

B1C25AB1C25A

CLEAN

UTILITY

BC26BC26

F E

C

FEC

F E

C

FE

F E

C

IPC TABLE 403.1

Classification Description

Water Closets Lavatories

BathTubs /Showers

Drinking Fountain OtherMale Female Male Female

Business

Buildings for the Transaction of business, professional services, other services involving merchandise, office buildings, banks, light industrial and similar uses

1 per 25 for the first 50 and 1 per 50 for the remainder exceeding 50

1 per 40 for the first 80 and 1 per 80 for the remainder exceeding 80

- 1 per 100 1 service sink

90 Occupants -

Required 3 3 - 2

Providing 3 2 2 2 2 2 1 service sink

1 service sink

Unisex

Unisex

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O P

C .A

R C

H .r v t

/1

/2

:3

:5

A

M

G-101

GENERAL LIFE SAFETY PLAN AND CODE DATA

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS C. LOWERY

ISSUED FOR

CONSTRUCTION

1/8" = 1'-0" F2

GENERAL CODE AND LIFE SAFETY PLAN - BASEMENT

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH

FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH

HATCH PATTERNS.

Path ID Travel Distance

B1 96' - 3"

B3 5' - 6"

B4 6' - 2"

B5 49' - 8"

B6 123' - 5"

B7 33' - 6"

B8 28' - 7"

B9 92' - 1"

AREA SCHEDULE (occupancy area)

Area Style - occupancy classifications AREA SPACE USE

SF PER

OCCUPANT

OCCUPANCY

LOAD

CAPACITY

FACTOR -

STAIRWAYS

REQUIRED

STAIRWAY

WIDTH

CAPACITY

FACTOR - OTHER

REQUIRED

WIDTH - OTHER COMMENTS

00_BASEMENT_OPC

(NFPA) HEALTH CARE 10,221 SF Ambulatory health care 150 SF 74 0.3" 22.2" 0.2" 14.8"

(NFPA) HEALTH CARE 409 SF Business Use: (other than - Air traffic control tower observation levels) 150 SF 4 0.3" 1.2" 0.2" 0.8"

(NFPA) HEALTH CARE 0 SF In other than storage and mercantile ccupancies 500 SF 0 0.3" 0.0" 0.2" 0.0"

(NFPA) INDUSTRIAL 3,620 SF Special-purpose industrial 0 0.3" 0.0" 0.2" 0.0" N/A Refer to NFPA Occupant Load Factor table: 7.3.1.2

(NFPA) HEALTH CARE 999 SF Waiting spaces 100 SF 10 0.3" 3.0" 0.2" 2.0" Refer to NFPA 12.1.7.2 and 13.1.7.2

15,248 SF 88 26.4" 17.6"

Path ID Travel Distance

B10 4' - 11"

B12 43' - 11"

B13 72' - 2"

B14 44' - 3"

B15 93' - 1"

B17 273' - 9"

B18 234' - 0"

B19 47' - 3"

Revisions: Date:

/11

E

N

F

DN

BOPC.1

A

BOPC.2 BOPC.3 4 5 65.A

A.1

B

B.1

C

D

E

BOPC.F

BOPC.G

CLINICAL

CHARTING RM

B1C29B1C29

LOCKER RM

B1C20AB1C20A

AREAWAY

103103

Elevator B-19B-19

VESTIBLUE

SOCIAL WORK

OFFICE

B1C01B1C01

LINEN CART

ALCOVE

TRANSFORMER

RM

B1C17AB1C17A

ON-CALL RM

B1C18B1C18

TOILET

B1C19B1C19

STAFF

LOUNGE

B1C20B1C20

STAIR

B1C21B1C21

TOILET

B1C08B1C08

TRAUMA RM

SMALL

B1C06B1C06

TRAUMA RM

LARGE

B1C07B1C07

X-RAY

ALCOVE

B1C07AB1C07A

CORRIDOR

B1C-4B1C-4

ELECTRIC

CLOSET

B1C16B1C16 TELEPHONE

CLOSET

B1C15B1C15

OBSERVATION/

TREATMENT

RM

B1C11B1C11

ENTRANCE

TRIAGE RM

B1C28B1C28

TRIAGE RM

B1C31B1C31

AOD/

CHECK-IN

B1C30B1C30

LINEN

CLOSET

B1C41B1C41

LINEN

CLOSET

B1C42B1C42

STAIR NO.4

B1C43B1C43

ELEVATOR

EQUIP RM

B1C40B1C40

LINEN

CLOSET

B1C50B1C50

POLICE CHIEF

OFFICE

B1C35B1C35

PUBLIC

AFFAIRS

B1C37B1C37

EMS CLOSET

B1C36B1C36

CORRIDOR

B1C-1B1C-1

WAITING

B1C-1B1C-1

CLOSET

B1C34DB1C34D

MALE RR

B1C33B1C33

FEMALE RR

B1C32B1C32

ELEVATOR

S-5S-5

ELEVATOR

S-6S-6

OBS BEDS

ROOM

B1C-6AB1C-6A

CORRIDOR

B1C-6B1C-6

PATIENT

COMFORT

ROOM

B1C27B1C27

HEAD NURSE

B1C53B1C53

CLOSET

SPD

B1C51B1C51

POLICE

DISPATCH

B1C02B1C02

CORRIDOR

B1C-5B1C-5

OBSERVATION/

TREATMENT

RM

B1C10B1C10

Elev. Equip/

SUMP

178178

OBSERVATION/

TREATMENT

RM

B1C12B1C12

OBSERVATION/

TREATMENT

RM

B1C13B1C13

OBSERVATION/

TREATMENT

RM

B1C09B1C09

OBSERVATION/

TREATMENT

RM

B1C14B1C14

TOILET

B1C24B1C24

OBSERVATION/

TREATMENT

RM

B1C23B1C23

CORRIDOR

B1C-2B1C-2

PROCEDURE

RM

B1C05B1C05

EXAM AREA

190190

EXAM AREA

B1C03B1C03

NURSE

B1C34AB1C34A

NURSE

STATION

B1C29AB1C29A

VESTIBLUE

CORRIDOR

B1C-1AB1C-1A

CORRIDOR

B1C-9B1C-9

CORRIDOR

B1C-7B1C-7

CORRIDOR

B1C-8B1C-8

CRASH CART

ALCOVE

OBSERVATION/

TREATMENT

RM

B1C26B1C26

OPC BUILDING 1

OBSERVATION/

TREATMENT

RM

B1C22B1C22

CHIEF OF ER

B1C52B1C52

OBSERVATION/

TREATMENT

RM

B1C25B1C25

SMALL TOILET

B1C34CB1C34C

SOILED

UTILITY RM

B1C55B1C55

TOILET

B1C54B1C54

TEMPORARY LINES TO TEMPORARY AHU

CONTROL

ROOM

B1C61B1C61

CT SCANNER

B1C62B1C62

MECHANICAL

ROOM

B1C39B1C39

CORRIDOR

B1C58B1C58

PAT HOLDING

B1C59B1C59

HAC

B1C57B1C57

EQUIP STOR

B1C60B1C60

1b

1a

CAV-1-7

CAV-1-6

CAV-1-2

CAV-1-5

CAV-1-4

VAV-1-1

VAV-1-5

CAV-1-8

CAV-1-9

VAV-1-6

VAV-1-12

VAV-1-13 VAV-1-14

VAV-1-8

VAV-1-9

VAV-1-11

VAV-1-16

VAV-1-17

VAV-1-18

VAV-1-4VAV-1-3

CAV-1-3

CAV-1-1

VAV-1-2

VAV-1-7

1-AHU-3

VAV-1-15

VAV-1-20

VAV-1-21

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .