570-17-210.OPC.DWG.20221021Part-2.pdf
PDF 15 MB Posted
- Solicitation number
- 36C26123R0008
About this file
This federal contract opportunity solicitation seeks proposals to remodel the emergency department observation bed area at the VA Medical Center in Fresno, California. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is soliciting bids under solicitation number 36C26123R0008 to remodel existing space into an observation bed unit within their emergency department. Interested parties should submit proposals by the deadline to provide construction and remodeling services, including but not limited to demolition, modifications to existing infrastructure, and upgrades to mechanical and electrical systems, to transform current treatment areas into an observation bed facility. The award date is not specified but work is expected to commence upon contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Technical Question Tracking Sheet -RFI 1-38 -ED Beds 02212023.pdf | ||
| 36C26123R0008 0007.docx | DOCX document | |
| 36C26123R0008 0006.docx | DOCX document | |
| WD_CA20230018_02102023.pdf | ||
| 36C26123R0008 0005.docx | DOCX document | |
| Technical Question Tracking Sheet -RFI 1-36 -ED Beds-MRP-020823.pdf | ||
| 36C26123R0008 0004.docx | DOCX document | |
| 36C26123R0008 0003.docx | DOCX document | |
| Site Visit_01262023 Sign in Sheet.pdf | ||
| 36C26123R0008 0002.docx | DOCX document | |
| 36C26123R0008 0001.docx | DOCX document | |
| 570-17-210.OPC.DWG.20230112Part-1.pdf | ||
| Attachment A_Factor 1_Experience_01052023.xlsx | XLSX spreadsheet | |
| 570-17-210.OPC.Specs.20221024.pdf | ||
| ACM Report.pdf | ||
| WD_CA29_11042022.pdf | ||
| Attachment C_Large Business Subcontracting Plan Template_01032023.docx | DOCX document | |
| 570-17-210.OPC.DWG.20221021Part-3.pdf | ||
| Attachment B_Supplemental Price Breakdown_11222022.xlsx | XLSX spreadsheet | |
| 36C26123R0008.docx | DOCX document | |
| Attachment D_Request for Information (RFI) Form_36C26123R0008.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"x
E X
H
"ø
S A
12"ø SA
18"x10"
"ø
E X
H
"x
S A
36"x22" RA
(E)24"x12" SA
5"ø SA
(E)8"ø SA (E)8"ø SA
8"ø RA
(E)16"ø SA(E)8"ø SA
(E)8"ø SA (E)8"ø SA
(E )8
"ø S
A
(E)8"ø SA
(E)42"x12" RA
(E )1
"ø
S A
(E )1
"x
S A
(E)14"ø SA
(E)12"ø RA
(E)8"ø RA
(E)14"ø RA
(E)14"ø RA
(E )1
"ø
R A(E)14"x10" RA
(E )1
"x
R A
(E )8
"ø R
A
(E )1
"x
E X
H
50"x12" RA
50"x12" RA
(E )1
"x
E X
H
(E)14"x8" EXH
(E)14"x8" EXH
(E)14"x8" EXH
(E)12"ø EXH (E)16"x12" EXH (E)14"x8" EXH
(E)14"x8" EXH
(E)10"ø RA (E)8"ø RA
(E)10"ø EXH
10"ø EXH
(E)8"ø EXH
(E)8"ø EXH
(E)6"ø EXH
8"ø5"ø
(E)6"ø SA
8"ø SA12"ø SA
8"ø SA
(E)6"ø EXH (E)6"ø EXH
8"ø SA
8"ø SA
6"ø SA
(E)12"ø SA
(E)8"ø SA
(E)10"ø SA
(E)12"ø SA (E)10"ø SA
(E)10"ø SA (E)8"ø SA
(E)10"ø SA
(E )8
"ø S
A(E)14"x8" RA
(E)14"x8" RA
(E)8"ø SA
(E)8"ø SA
(E)14"ø SA (E)12"ø SA
(E)12"ø SA
6"x6"
(E)8"x8" EXH
(E )8
"x
E X
H
(E)6"x6" EXH
(E)12"ø SA
(E)50"x24" RA
50"x18" EXH
72"x20" OA (E)48"x24" RA
48"x24" RA
8"x8" EXH
26"ø RA 30"ø RA
(E)20"x12" RA (E )1
"x
E X
H
(E)14"ø SA
(E )3
"x
S A
12"ø (E
)1 "x
E X
H 8"ø
"ø
S A
(E)12"ø RA (E)12"ø RA
8"ø8"ø SA
8"ø
8"ø (E
)4 "x
R A
(E)14"ø RA
(E )2
"x
R A
(E)8"ø SA (E)18"x12" EXH
6"ø SA
10"ø RA
10"ø RA
12"ø SA
"x
R A
(E )1
"ø
E X
H
(E)24"x12" SA
(E)8"ø SA
(E)14"ø SA
(E)8"ø RA
(E)18"x12" EXH
F1
MH100D
18"x10" EXH
(E)50"x12" SA
(E)54"x14" SA
14"ø SA 30"x12" EXH
(E)24"x12" SA
(E)10"ø SA (E)10"ø EXH
(E)8"ø SA
(E)6"ø SA
18"x10"
(E)16"x12" SA
(E)30"x12" SA
(E)24"x12" SA
(E)12"ø EXH(E)10"ø EXH
(E)8"ø EXH
(E)8"ø EXH
(E )1
"ø
R A
12"ø EXH
"x
R A
(E)12"x8" SA (E
)2 "x
S A
(E)54"x14" SA
(E )1
"ø
R A
(E )1
"x
S A
(E )1
"ø
S A
(E )1
"x
R A
(E )1
"ø
R A
(E)12"ø RA
42"x12" SA50"x12" SA
(E)37"x12" SA(E)14"ø SA
(E)14"ø SA
(E)6"ø SA
(E)6"ø SA
(E)8"ø SA (E)8"ø SA (E)12"ø SA
(E)8"ø SA
(E )8
"ø S
A (E
)1 "ø
S A
(E )3
"x
S A
(E )2
"x
S A(E
)2 "x
S A
(E )8
"ø S
A
(E)8"ø SA (E)8"ø SA
(E)20"x12" SA8"ø
(E)14"ø SA(E)14"ø SA
(E)14"ø SA
(E )2
"x
S A
(E)14"ø SA
(E)6"ø RA
(E)6"ø RA
(E)8"ø RA(E)10"ø RA
(E)8"ø RA
1b
9 6
1a
2 34
TEMPORARY DUCT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
A B
D C
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O
P C
.M E
.r v t
/2
/2
:2
:4
P
M
MD100
MECHANICAL DEMO PLAN -
OVERALL
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M.PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
1/8" = 1'-0"
HVAC BASEMENT FLOOR PLAN
PROJECT PHASING
01a Phase 1b: Install Temporary AHU and duct connections, commission temporary equipment and switch utilities. Renovate Soutthern portion (B1C21, B1C23, B1C24, B1C51, B1C52, B1C53, BC50, B1C-4). Replace VAV 1-12, VAV 1-13, VAV 1-14, VAV 1-15, and associated ducts and grilles.
Phase 2: After Temporary AHU is commissioned and operational, Remove and replace existing AHU. Can be performed concurrently with next phases.
Phase 3: Renovate Northern Portion (B1C25, B1C26, B1C-6A, B1C34A, B1C34B, B1C34C, B1C34D, B1C34H, B1C34K). Replace VAV 1-8, VAV 1-9, VAV 1-10, VAV 1-11, VAV 1-16, and associated ducts and grilles
Phase 4: Mechanical Phase - Replace VAV 1-17 and associated ducts and grilles.
(B1C37)
Phase 5: Mechanical Phase - Replace VAV 1-6, VAV 1-7, and associated ducts and grilles. Replace CAV 1-9 and convert to single duct. (B1C11, B1C12, B1C13, B1C14, B1C-4)
Phase 6: Mechanical Phase - Replave VAV-1-2 and associated ducts and grilles. Add new Return air to B1C28. (B1C27, B1C28, B1C-8)
Phase 7: Mechanical Phase - Replace VAV 1-5 and associated ducts and grilles.
Replace CAV 1-7, CAV 1-8, and convert to single duct. (B1C07, B1C08, B1C09, B1C10)
Phase 8: Mechanical Phase - Replace CAV 1-6 and convert to single duct. Add Return Air to Corridor. (B1C06, B1C-5).
Phase 9: Mechanical Phase - Replace CAV 1-2, CAV 1-5, and convert to single duct.
Add Return Air to Corridor. (B1C05, B1C5, B1C-1A)
Phase 10: Mechanical Phase - Replave CAV 1-1, CAV 1-3, CAV 1-4 and convert to single duct. Replace VAV 1-1 and associated ducting. (B1C02, B1C05, B1C-1)
Phase 11: Mechanical Phase - New Return Air in Triage B1C31 (B1C30)
Phase 12: Mechanical Phase - New Supply Air in B1C18. Replace VAV 1-4 and associated ducts and grilles.
Phase 13: Mechanical Phase - New Supply Air in B1C20 Replace VAV 1-3 and associated ducts and grilles.
01b
Phase 1a: Tie New Mechanical Piping into existing piping main in elevator equipment room. Replace VAV 1-18 and associated ducts and grilles.
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR
TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND
DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG
NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT
FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE
AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE
EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 23 05 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND
M-803 FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
Revisions: Date:
1 CUT AND CAP AT WALL
2 REPLACE RA DUCT MAIN TO THE PHASE 1/PHASE 3 BOUNDARY, RETAIN EXISTING DUCT WHILE NEW DUCT IS BEING INSTALLED TO MAINTAIN SERVICE. PERFORM AFTER-HOURS SHUT DOWN SWAP TO NEW
SERVICE
3 PROVIDE NEW SA CONNECTION AT PHASE 1/PHASE 3 BOUNDARY PRIOR TO REMOVING EXISTING SA
DUCT
4 PROVIDE TEMPORARY DAMPER ON TEMPORARY DUCT.
5 DEMO TO HERE IN PHASE 3, CAP DUCT.
09/11/2022
F4/MD100D
(E)18"x10"
(E)12"ø SA(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E)10"ø SA
(E)16"ø SA(E)8"ø SA
(E)8"ø SA (E)8"ø SA
(E )8
"ø S
A
(E)8"ø SA
(E )2
"x
R A
(E )3
"x
S A
(E )1
"ø
S A
(E )2
"x
S A
(E)12"ø RA
(E)8"ø RA
(E)14"ø RA
(E )1
"ø
R A
(E)14"x10" RA
(E )1
"x
R A
(E )8
"ø R
A
(E )1
"x
E X
H
(E)14"x8" EXH
(E)14"x8" EXH
(E)14"x8" EXH
(E)12"ø EXH
(E)16"x12" EXH (E)14"x8" EXH
(E)14"x8" EXH
(E)12"ø (E)8"ø
(E)8"ø
(E)8"ø SA
(E )8
"ø
(E)12"ø SA
(E)8"ø SA (E )1
"ø
E X
H
(E )1
"ø
E X
H
(E )1
"ø
E X
H (E
)8 "ø
S A
(E)8"ø SA
(E)6"ø EXH (E)6"ø EXH
(E)8"ø SA
(E)8"ø SA (E)12"ø SA
(E)8"ø SA
(E)8"ø SA
(E)12"ø SA
(E)6"ø SA
(E)6"ø SA
(E)12"ø SA
(E)12"ø SA
(E)8"ø SA
(E)10"ø SA
(E)8"ø SA
(E)8"ø SA (E)12"ø SA
(E)10"ø SA
(E)10"ø SA
(E)8"ø SA
(E)10"ø SA
(E )8
"ø S
A
(E)14"x8" RA
(E)14"x8" RA
(E)10"ø SA
(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E)12"ø SA
(E)12"ø SA
(E)14"ø SA (E)12"ø SA
(E )1
"ø
S A(E)12"ø SA
(E)8"ø SA
(E)12"ø SA
(E)16"x8"
2 2
TRAUMA RM LARGE
B1C07
TRAUMA RM SMALL
B1C06
EXAM AREA
LINEN CART ALCOVE
EXAM AREA
B1C03
SOCIAL WORK
OFFICE
B1C01
VESTIBLUE
VESTIBLUE
POLICE DISPATCH
B1C02
ENTRANCE
WAITING
B1C-1
PROCEDURE RM
B1C05
WHEELCH. SCALE
TRIAGE RM
B1C31
AOD/ CHECK-IN
B1C30
TRIAGE RM
B1C28
CORRIDOR
B1C-7
CLINICAL CHARTING
RM
B1C29
NURSE STATION
B1C29A
CORRIDOR
B1C-5
TOILET
B1C08
X-RAY ALCOVE
B1C07A
Unoccupied
Unoccupied
Elevator
B-19
B7
MD100A
F /M
D B
(E)6"ø SA
(E)6"ø SA
(E)8"ø SA
(E)8"ø SA (E)12"ø SA (E)12"ø SA
(E )2
"x
S A
(E )2
"x
S A
(E )1
"ø
S A
(E )8
"ø S
A
(E )8
"ø S
A
(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E)12"ø RA
(E)8"ø RA
(E)5"ø SA
(E)10"ø SA
(E)10"ø SA
(E)10"ø SA
(E)10"ø EXH
(E)10"ø EXH
(TYP)
VAV-1-6
VAV-1-2
CV-1-8 CV-1-9
VAV-1-5
CV-1-7
CV-1-6
CV-1-1
CV-1-5
CV-1-2
CV-1-3
VAV-1-1
CV-1-4
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
A
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O
P C
.M E
.r v t
/2
/2
:2
:5
P
M
MD100A
MECHANICAL DEMO PLAN -LEVEL
B - AREA A
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR
TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND
DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG
NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT
FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE
AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE
EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 23 05 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND
M-803 FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
1/4" = 1'-0" F1
MECHANICAL DEMO PLAN - BASEMENT - AREA A
1 REMOVE EXISTING EXHAUST FAN (EF-1) SERVING NEGATIVE PRESSURE TREATMENT ROOMS 31 & 32.
2 REMOVE EXISTING CAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.
3 REMOVE EXISTING VAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.
4 REMOVE EXISTING THERMOSTAT.
5 EXISTING THERMOSTAT TO REMAIN.
NTS
B7
EXISTING EXHAUST FAN (EF-1) AND B1/OPC "CHASE"
Revisions: Date:
F4/MD100C
F1/MD100A
F4/MD100D
(E )1
"ø
E X
H
(E)12"ø EXH(E)10"ø EXH(E)8"ø EXH
(E )1
"ø
S A
(E)6"ø EXH
(E)6"ø EXH
(E)10"ø SA
(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E)8"ø EXH
(E)10"ø SA
(E)14"x12" SA
(E)12"ø RA
(E)12"ø RA
(E)10"ø RA (E)8"ø RA
(E)8"ø RA
(E)6"ø RA (E)6"ø RA
(E)6"ø RA
(E)10"ø EXH(E)6"ø EXH
(E)8"ø EXH
(E )6
"ø E
X H
(E)12"ø SA
(E)8"ø SA
(E )8
"ø S
A
(E)8"ø SA (E)6"ø SA
(E)6"ø SA
(E )6
"ø S
A
(E)6"ø SA
(E)12"ø SA
(E)10"ø SA
(E )6
"ø S
A
(E)10"ø SA
(E )8
"ø S
A (E
)8 "ø
S A
(E)10"ø RA
(E )8
"ø R
A
(E )6
"ø S
A
(E)24"x12" SA
(E)12"ø SA
(E)54"x14" SA
(E)6"ø SA
(E)6"ø SA
(E)4"ø SA
(E)4"ø SA
(E )6
"ø S
A(E)6"ø SA
(E)10"ø SA
(E )2
"x
R A
(E)8"ø RA
(E)8"ø RA
(E)6"ø RA
(E )2
"x
S A
(E)30"x12" SA
(E)5"ø SA
(E)6"ø SA
(E)12"ø SA
(E)8"ø SA
(E )2
"x
S A
(E)8"ø RA
(E )1
"ø
S A
(E)16"x12" SA
(E)10"ø SA
(E)6"ø RA
(E )6
"ø R
A
(E)12"x8" SA
(E)12"ø
(E)8"ø SA
(E)6"ø RA
(E)50"x12" SA
(E)10"ø RA
(E)14"x12" EXH
(E)24"x12" SA
CORRIDOR
B1C-1
POLICE CHIEF
OFFICE
B1C35
PUBLIC AFFAIRS
B1C37
ELEVATOR
S-6
ELEVATOR EQUIP RM
B1C40
LINEN CLOSET
B1C41
LINEN CLOSET
B1C50
CORRIDOR
B1C-2
SMALL TOILET
B1C34C
OBS BEDS ROOM
B1C-6A
CLOSET
SOILED UTILITY RM
B1C55
TOILET
B1C24
OBSERVATION/
TREATMENT RM
B1C25
OBSERVATION/
TREATMENT RM
B1C26
MALE RR
B1C33
FEMALE RR
B1C32
PATIENT COMFORT
ROOM
B1C27
CRASH CART
ALCOVE
WAITING
B1C-1
OBSERVATION/
TREATMENT RM
B1C23
OBSERVATION/
TREATMENT RM
B1C22
TOILET
B1C54
CORRIDOR
B1C-6
SPD
B1C51
CHIEF OF ER
B1C52
HEAD NURSE
B1C53
HAC
B1C57
LINEN CLOSET
B1C42
(E )1
"x
S A
(E )1
"ø
S A
(E)8"ø SA
(E)28"x28" SA
(E)14"ø SA (E)37"x12" SA
(E )8
"ø S
A
(E)8"ø SA
(E)4"ø SA
(E )6
"ø R
A
6" CHS(E)
6" CHR(E)
3/4" CD(E)
2" MPS(E)
4" HWS(E)
4" HWR(E)
(E )1
"x
(E )1
"x
R A
(E )1
"x
R A
(E)18"x10" EXH (E)30"x12" EXH
VAV-1-6
VAV-1-16
VAV-1-17
VAV-1-18
VAV-1-9
VAV-1-8
VAV-1-11
VAV-1-14 VAV-1-15
VAV-1-12
VAV-1-13
VAV-1-10
VAV-1-7
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
B
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O
P C
.M E
.r v t
/2
/2
:2
:5
P
M
MD100B
MECHANICAL DEMO PLAN - LEVEL
B - AREA B
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR
TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND
DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG
NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT
FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE
AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE
EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 23 05 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND
M-803 FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
1/4" = 1'-0" F4
MECHANICAL DEMO PLAN - BASEMENT - AREA B
1 REMOVE EXISTING VAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.
2 REMOVE EXISTING THERMOSTAT.
3 EXISTING RETURN AIR GRILLE TO BE RELOCATED WITH THE ARCHITECTURAL RENOVATION.
5 REMOVE EXISTING FLEX DUCT.
F4/MD100D
(E )3
"x
E X
H
(E )1
"x
S A
(E)8"ø EXH
(E )6
"ø E
X H
(E )6
"ø S
A
(E )8
"ø E
X H
(E)24"x12" SA
(E)12"ø SA
(E)54"x14" SA
(E)4"ø SA (E)6"ø SA(E)6"ø SA
(E)6"ø SA
(E)4"ø SA
(E)4"ø SA
(E )6
"ø S
A(E)6"ø SA
(E)10"ø SA
(E )2
"x
R A
(E)8"ø RA
(E)8"ø RA
(E)6"ø RA
(E )2
"x
S A
(E)30"x12" SA
(E)5"ø SA
(E)8"ø SA
(E)18"x12" EXH
(E)50"x12" RA
(E)50"x12" RA
(E)12"x8" SA
(E)50"x18" EXH
(E)96"x18" EXH
(E)58"x18" OA
(E)72"x20" OA
(E)48"x24" RA
(E)50"x12" SA
(E)42"x12" SA
(E )2
"ø
R A
(E)30"ø RA
(E)10"ø RA
(E)24"x12" SA
ELEVATOR EQUIP RM
B1C40SOILED UTILITY RM
B1C55
OBSERVATION/
TREATMENT RM
B1C23
OBSERVATION/
TREATMENT RM
B1C22
MECHANICAL ROOM
B1C39
AREAWAY
TOILET
B1C54
CORRIDOR
B1C-6
SPD
B1C51
CHIEF OF ER
B1C52
HEAD NURSE
B1C53
HAC
B1C57
PAT HOLDING
B1C59
CT SCANNER
B1C62
EQUIP STOR
B1C60
STAIR NO.4
B1C43
LINEN CLOSET
B1C42
(E )1
"x
S A
(E )1
"ø
S A
(E)36"x12" RA
(E)36"ø SA
(E)28"x28" SA
(E)14"ø SA (E)37"x12" SA
(E)14"ø SA
(E)14"ø SA
(E)14"ø SA
(E)36"ø RA
(E)50"x12" RA
(E)18"x10" EXH
(E )8
"ø S
A
(E)8"ø SA
(E)4"ø SA
F4/MD100B
D1
MD100C
B1
MD100C
CONTROL ROOM
B1C61
CORRIDOR
B1C58
(E )1
"x
(E )2
"x
R A
(E)10"ø SA
(E)10"ø SA
(E)10"ø SA
(E )1
"x
S A
(E )1
"x
S A
(E)6"ø EXH
(E)6"ø EXH
(E)8"ø SA (E)8"ø SA
(E)8"ø RA
(E)12"ø RA
(E )1
"x
R A
(E)30"x12" EXH
VAV-1-6
VAV-1-11
VAV-1-14 VAV-1-15
VAV-1-12
VAV-1-13
VAV-1-7
1-AHU-4
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
C
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O
P C
.M E
.r v t
/2
/2
:2
:0
P
M
MD100C
MECHANICAL DEMO PLAN - LEVEL
B - AREA C
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR
TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND
DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG
NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT
FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE
AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE
EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 23 05 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND
M-803 FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
1/4" = 1'-0" F4
MECHANICAL DEMO PLAN - BASEMENT - AREA C
1 REMOVE EXISTING VAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.
2 REMOVE EXISTING THERMOSTAT.
3 REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIATED DUCTWORK.
4 REMOVE EXISTING EXHAUST DUCT OUTLET AT LOUVER.
6 EXISTING AIR HANDLING UNIT TO REMAIN, PROTECT IN PLACE.
7 REMOVE EXISTING AIR HANDLING UNIT 1-AHU-3 THROUGH LOUVER.
8 PROVIDE TEMPORARY ISOLATION DAMPERS BEFORE BEGINNING ANY DEMOLITION WORK. THE
DUCTWORK SHALL BE CLEANED, REPAIRED AND SEALED AIR TIGHT. THE CHANGEOVER SHALL BE PHASED TO INSTALL ONLY ONE TEMPORARY ISOLATION DAMPER AT A TIME BEFORE PROCEEDING TO THE NEXT DAMPER. THIS PROCESS SHALL OCCUR OUTSIDE OF FACILITY OPERATIONAL HOURS AND
WILL REQUIRE NIGHT AND WEEKEND WORK.
9 TEMPORARY SUPPLY AIR FLEXIBLE HOSE TO MAKE CONNECTION TO TEMPORARY ISOLATION DAMPER.
10 TEMPORARY RETURN AIR FLEXIBLE HOSE TO MAKE CONNECTION TO TEMPORARY ISOLATION DAMPER.
11 DISCONNECT EXISTING RETURN AIR CONNECTION FROM AIR HANDLING UNIT 1-AHU-3 AND CAP FOR
UTILIZATION OF TEMPORARY RETURN.
12 REMOVE EXISTING PIPING AND ISOLATION VALVES SERVING AIR HANDLING UNIT 1-AHU-3 BACK TO MAIN.
PIPING SYSTEM SHALL HAVE A MECHANICAL LINE STOP OR ICE PLUG TO STOP FLOW AND ALLOW FOR
NEW ISOLATION VALVE INSTALLATION.
NTS
D1
EXISTING 1-AHU-3 EXHAUST OUTLET AT LOUVER
NTS
B1
EXISTING OA INTAKE DUCT IN CHASE TO ROOF LEVEL
F4/MD100C
(E)24"x12" SA
(E)8"ø SA
(E)8"ø SA
(E )4
"x
R A
(E )1
"ø
S A
(E)14"ø SA
(E )1
"x
S A
(E)14"ø SA
(E )1
"x
E X
H
(E)10"ø RA
(E)8"ø RA
(E)8"ø RA
(E)10"ø EXH
(E )1
"ø
E X
H
(E)8"ø EXH
(E)8"ø EXH
(E)6"ø EXH
(E)8"ø
(E)5"ø
(E)10"ø SA (E)6"ø SA
(E)6"ø SA (E)6"ø SA
(E )8
"ø S
A
(E )8
"ø S
A
(E)6"ø EXH
(E)12"ø
(E)10"ø
(E)10"x6" SA
(E)6"x6"
(E)8"ø
(E)8"x8" EXH
(E )8
"x
E X
H
(E)6"x6" EXH (E)50"x24" RA
(E)48"x24" RA
(E)20"x12" RA
(E )1
"x
(E )1
"x
E X
H
(E)14"ø SA
(E)14"ø SA
(E)32"x12" SA
STAIR
B1C21
LOCKER RM
B1C20A
STAFF LOUNGE
B1C20
TRANSFORMER RM
B1C17A
AREAWAY
MECHANICAL ROOM
B1C39
ON-CALL RM
B1C18
CORRIDOR
B1C-4
ELECTRIC CLOSET
B1C16
TELEPHONE CLOSET
B1C15
TOILET
B1C19
OBSERVATION/
TREATMENT RM
B1C09
OBSERVATION/
TREATMENT RM
B1C10
OBSERVATION/
TREATMENT RM
B1C11
OBSERVATION/
TREATMENT RM
B1C12
OBSERVATION/
TREATMENT RM
B1C13
(E)18"x12" EXH
36"ø SA
36"ø RA
22"x34" SA
22"x34" RA
"ø
R A
"ø
S A
F4/MD100B
(E)10"ø EXH
(E)10"ø EXH
(E)14"ø SA
(TYP)
VAV-1-5
VAV-1-7
VAV-1-3
VAV-1-4
1-AHU-4RF-6
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
D
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O
P C
.M E
.r v t
/2
/2
:2
:0
P
M
MD100D
MECHANICAL DEMO PLAN - LEVEL
B - AREA D
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR
TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND
DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG
NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT
FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE
AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE
EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 23 05 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND
M-803 FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
1/4" = 1'-0" F4
MECHANICAL DEMO PLAN - BASEMENT - AREA D
1 REMOVE EXISTING VAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.
2 REMOVE EXISTING THERMOSTAT.
3 TEMPORARY SUPPLY AND RETURN AIR FLEXIBLE HOSE ENTERS THROUGH THE EXISTING WALL
KNOCKOUT INTO THE MECHANICAL ROOM TO MAKE CONNECTIONS AFTER TEMPORARY ISOLATION
DAMPERS.
4 TEMPORARY SUPPLY AND RETURN AIR FLEXIBLE HOSE DOWN INTO AREA WAY. REMOVE GRATES AS NECESSARY, SUPPLY TEMPORARY SAFETY BARRIERS AND SIGNAGE AROUND GRATE OPENING, SEE
SPECIFICATION 01 35 26. SEE SHEET MS101 AND MD100C FOR CONTINUATION.
5 PROVIDE TEMPORARY UNISTRUT FRAMING TO SUPPORT TEMPORARY DUCT AT HEIGHT OF EXISTING
KNOCKOUT PANEL AS REQUIRED, SEE SHEET M-502 FOR ADDITIONAL INFORMATION.
6 SEE SHEET MS101 FOR CONTINUATION.
7 REMOVE EXISTING DUCTWORK BACK TO MAIN. CAP AND SEAL REMAINING DUCT AIR TIGHT.
32"x16
DN
F1
MD102
D1
MD102
26"ø EXH
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
A B
D C
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O
P C
.M E
.r v t
/1
/2
:1
:5
P
M
MD102
MECHANICAL DEMO PLAN - ROOF
LEVEL
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M. PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
KEYNOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR
TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND
DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG
NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT
FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE
AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE
EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION
SECTION 23 05 93 FOR MORE INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO
VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED
ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.
ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO
CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL
PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE
CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED
FIRE PROOF CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER
SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL
TRADES PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR
PIPE PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND
M-803 FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
1/8" = 1'-0" F4
MECHANICAL DEMO PLAN - ROOF
1 REMOVE EXISTING EXHAUST FAN (1-EF-ED) SERVING BASEMENT FLOOR EMERGENCY DEPARTMENT
2 REMOVE EXISTING OUTSIDE AIR INTAKE GRAVITY HOOD 1-GH-3 SUPPLYING 1-AHU-3.
3 EXISTING PHOTOVOLTAIC PANEL ARRAY TO REMAIN, PROTECT IN-PLACE.
4 EXISTING ROOFTOP MECHANICAL EQUIPMENT TO REMAIN, PROTECT IN-PLACE.
5 FUTURE ROOFTOP AIR HANDLING UNIT AND PIPING CONSTRUCTED UNDER SEPARATE RENOVATE
SPECIALTY CLINIC PROJECT.
NTS
D1
EXISTING EXHAUST FAN (1-EF-ED)
NTS
F1
EXISTING INTAKE HOOD (GH-3)
"x
E X
H
"ø
E X
H
(E)24"x12" SA
(E)16"ø SA(E)8"ø SA
(E)8"ø SA (E)8"ø SA
(E )8
"ø S
A
(E)8"ø SA
(E)42"x12" RA
(E )1
"ø
S A
(E )1
"x
S A
(E)14"ø SA
(E)12"ø RA
(E)8"ø RA
(E)14"ø RA
(E)14"ø RA
(E )1
"ø
R A(E)14"x10" RA
(E )1
"x
R A
(E )8
"ø R
A
(E )1
"x
E X
H
(E )1
"x
E X
H
(E)14"x8" EXH
(E)14"x8" EXH
(E)14"x8" EXH
(E)12"ø EXH (E)16"x12" EXH (E)14"x8" EXH
(E)14"x8" EXH
(E)10"ø RA
(E)8"ø RA
(E)10"ø EXH
10"ø EXH
(E)8"ø EXH (E)8"ø EXH
(E)6"ø EXH
(E)6"ø SA
(E)6"ø EXH (E)6"ø EXH
(E)12"ø SA
(E)8"ø SA
(E)10"ø SA
(E)12"ø SA (E)10"ø SA
(E)10"ø SA (E)8"ø SA
(E)10"ø SA
(E )8
"ø S
A(E)14"x8" RA
(E)14"x8" RA
"ø
S A
(E)8"ø SA
(E)14"ø SA (E)12"ø SA
(E)12"ø SA
6"x6"
(E)8"x8" EXH
(E )8
"x
E X
H
(E)6"x6" EXH
(E)12"ø SA
(E )5
"x
R A
72"x20" OA (E)48"x24" RA
48"x24" RA
8"x8" EXH
26"ø RA 30"ø RA
(E)20"x12" RA (E )1
"x
E X
H
(E)14"ø SA
(E )3
"x
S A
(E )1
"x
E X
H 12"ø SA
12"ø SA
8"ø SA
8"x10" SA
8"ø SA
10"ø SA
(E)12"ø RA (E)12"ø RA
(E )4
"x
R A
(E)14"ø RA
(E )2
"x
R A
(E)8"ø SA (E)18"x12" EXH
"x
R A
(E )1
"ø
E X
H
TRAUMA RM LARGE
B1C07
EXAM AREA
B1C04
ENTRANCE
ELEVATOR
B-19
ALCOVE,
WHEELCHAIR/
STRETCHER/ LIFT
B1D
SOCIAL WORK
OFFICE
B1C01
EXAM AREA
B1C03
VESTIBULE
VESTIBULE
LINEN CART ALCOVE
POLICE DISPATCH
B1C02
PROCEDURE RM
B1C05
CHARTING ALCOVE
WHEELCH. SCALE
---CORRIDOR
B1C-1A
TRAUMA RM SMALL
B1C06
TOILET
B1C08
CORRIDOR
B1C-8
CORRIDOR
B1C-5
NURSE STATION
B1C29A
CLINICAL CHARTING
RM
B1C29
CORRIDOR
B1C-7
AOD/ CHECK-IN
B1C30 INTERVENTION
(SECLUSION) ROOM
B1C28
WAITING
B1C-1
CORRIDOR
B1C-1
WAITING
B1C-1
FEMALE RR
B1C32
MALE RR
B1C33
PAT TLT
B1C34J
NEW OBSERVATION
ROOM
B1C34G
PATIENT COMFORT
ROOM
BC127
CORRIDOR
B1C-9
NEW OBSERVATION
ROOM
B1C23
NEW OBSERVATION
ROOM
BC24
NEW OBSERVATION
ROOM
B1C21
HAC
BC50
CORRIDOR
B1C-6
PAT SHWR
B1C25B
CLEAN UTILITY
BC26
PAT TLT
B1C25A
HALL
B1C-6A
NEW NURSES
STATION
B1C34B
NEW NURSES
STATION
B1C34F
NEW OBSERVATION
ROOM
B1C34K
CORRIDOR
B1C-2
LINEN CLOSET
B1C41
ELEVATOR EQUIP RM
B1C40
ELEVATOR
S-5
ELEVATOR
S-6
HEAD NURSE
B1C37
CHIEF OF ER
B1C35
OBSERVATION/
TREATMENT RM
B1C14
CORRIDOR
B1C-4
SOILED UTILITY
B1C53
CLEAN UTILITY
B1C52
STF TLT
BC51
CORRIDOR
B1C-2
STAIR NO.4
B1C43
LINEN CLOSET
B1C42
MECHANICAL ROOM
B1C17
AREAWAY
HAC
B1C49
EQUIP STOR
B1C44
STAIR
B1C21
OBSERVATION/
TREATMENT RM
B1C09
OBSERVATION/
TREATMENT RM
B1C10
OBSERVATION/
TREATMENT RM
B1C11
OBSERVATION/
TREATMENT RM
B1C12
OBSERVATION/
TREATMENT RM
B1C13
CORRIDOR
B1C-4
TELEPHONE CLOSET
B1C15
ELECTRIC CLOSET
B1C16
MECHANICAL ROOM
B1C17
AREAWAY
TRANSFORMER RM
B1C17A
ON-CALL RM
B1C18
TOILET
B1C19
STAFF LOUNGE
B1C20
LOCKER RM
B1C20A
NEW OBSERVATION
ROOM
B1C34A
NEW OBSERVATION
ROOM
B1C34C
NEW OBSERVATION
ROOM
B1C34E
NEW STORAGE
B1C34H
NEW STORAGE
B1C34D
6"ø SA
8"ø SA
10"ø SA
10"ø SA
6"ø SA
10"x6" SA
(E)24"x12" SA
(E)8"ø SA
(E)14"ø SA
8"ø SA
(E)8"ø RA
(E)18"x12" EXH
F1
MH100D
18"x10" EXH
(E)50"x12" SA
(E)54"x14" SA
30"x12" EXH
(E)24"x12" SA
14"x12" SA
8"ø SA (E)10"ø SA
(E)10"ø EXH
8"ø SA
(E)8"ø SA
6"ø SA
8"ø RA
6"ø SA
(E)30"x12" SA
(E)24"x12" SA
(E)12"ø EXH(E)10"ø EXH
(E)8"ø EXH
(E)8"ø EXH
"ø
E X
H
8"ø SA
8"ø SA
"ø
R A8"ø EXH
(E )1
"ø
R A
8"ø SA
8"ø RA 10"x12" SA
"ø
S A
8"ø SA
"x
S A
8"ø SA
8"ø SA
10"x10" SA 10"x10" SA
"ø
S A
"ø
S A
8"ø SA
"ø
S A
8"ø SA
10"x10" SA
8"ø SA
"x
R A
"ø
R A
8"ø RA 6"ø SA
8"ø SA
"ø
E X
H
8"ø SA
"ø
S A
6"ø SA
10"ø SA
"ø
S A
8"ø SA
8"ø EXH
TRIAGE RM
B1C31
12"ø EXH
12"ø SA
12"ø SA
"x
R A
"ø
E X
H
"ø
S A
"ø
E X
H
"ø
S A
(E)12"x8" SA (E
)2 "x
S A
(E)54"x14" SA
(E )1
"ø
R A
(E )1
"x
S A
(E )1
"ø
S A
(E )1
"x
R A
(E )1
"ø
R A
(E)12"ø RA
8"ø SA
8"ø SA
8"ø SA
8"ø SA
36"ø EXH
65"x18" EXH
"x
R A
66"x24" OA
66"x24" OA
50"x24" RA
"ø
S A
(E)37"x12" SA(E)14"ø SA "ø
R A
8"ø RA
"ø
S A
"ø
S A
10"x10" SA
8"ø RA
6"ø RA
6"ø RA
(E)14"ø SA
14"ø SA CONTROL ROOM
B1C45
PAT HOLDING
B1C47
CT SCANNER
B1C46
CORRIDOR
B1C48
(E)6"ø SA
(E)6"ø SA
(E)8"ø SA (E)8"ø SA (E)12"ø SA
12"ø SA
8"ø SA
(E)8"ø SA
(E )8
"ø S
A (E
)1 "ø
S A
(E )3
"x
S A
(E )2
"x
S A(E
)2 "x
S A
(E )8
"ø S
A
12"ø SA
(E)8"ø SA (E)8"ø SA
8"ø SA
6"ø RA
(E)20"x12" SA
32"x12" RA 26"x12" RA26"x12" RA 22"x12" RA
"x
R A
10"ø RA
10"ø RA
10"ø RA
(E)14"ø SA(E)14"ø SA
(E)14"ø SA
(E )2
"x
S A
(E)14"ø SA
(E)6"ø RA
(E)6"ø RA
(E)8"ø RA(E)10"ø RA
(E)8"ø RA
6"ø SA
6"ø SA
16"x15" SA
6"ø SA
WAITING
B1C-1
"x
R A
1b
1a
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Mechanical, Electrical and Plumbing:
KEY PLAN
A B
D C
A u to d e s k D o c s /5
-1
-2
E x p a n d
E D
B e d s
/5
-1
-2
.O
P C
.M E
.r v t
/2
/2
:2
:2
P
M
MH100
MECHANICAL DUCT PLAN - LEVEL
B - OVERALL
TRIPLE C - THE A-E GROUP
4401 Atlantic Avenue, Suite 200
Long Beach, CA 90807
562.452.7175
MAT PERKINS
REMODEL ED BEDS FOR
OBSERVATION BEDS
2615 E. CLINTON AVENUE, FRESNO, CA 93703
570-17-210
OPC
09/11/2022 M.PERKINS G. WEAVER
ISSUED FOR
CONSTRUCTION
GENERAL SHEET NOTES
A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB
REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE
CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS
FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO
CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT
LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE
ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE
TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW
READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON
THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE
INFORMATION.
B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO
ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE
RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR
REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW
WORK ASSOCIATED WITH THE FACILITY RENOVATION.
C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION
D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY
REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS
OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING
INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL
WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE
OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.
E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED
WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING
PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED
AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF
CAULKING MATERIAL.
F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE
NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED
EQUIPMENT ACCESS AND SERVICEABILITY.
G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.
CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF
THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR
TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY
FROM CONSTRUCTION DOCUMENTS.
H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES
PRIOR TO INSTALLATION.
I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS
BETWEEN ALL DISSIMILAR METALS.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE
PENETRATIONS AND SEAL COMPLETELY.
L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING
SUBFLOORING.
M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.
N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.
O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.
P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803
FOR CONTROL SEQUENCE.
Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND
RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING
SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.
R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING
ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT
SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL
SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,
CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN
THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND
VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND
REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
KEYNOTES
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH
FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH
HATCH PATTERNS.
PROJECT PHASING
01a Phase 1b: Install Temporary AHU and duct connections, commission temporary equipment and switch utilities. Renovate Soutthern portion (B1C21, B1C23, B1C24, B1C51, B1C52, B1C53, BC50, B1C-4). Replace VAV 1-12, VAV 1-13, VAV 1-14, VAV 1-15, and associated ducts and grilles.
Phase 2: After Temporary AHU is commissioned and operational, Remove and replace existing AHU. Can be performed concurrently with next phases.
Phase 3: Renovate Northern Portion (B1C25, B1C26, B1C-6A, B1C34A, B1C34B, B1C34C, B1C34D, B1C34H, B1C34K). Replace VAV 1-8, VAV 1-9, VAV 1-10, VAV 1-11, VAV 1-16, and associated ducts and grilles
Phase 4: Mechanical Phase - Replace VAV 1-17 and associated ducts and grilles.
(B1C37)
Phase 5: Mechanical Phase - Replace VAV 1-6, VAV 1-7, and associated ducts and grilles. Replace CAV 1-9 and convert to single duct. (B1C11, B1C12, B1C13, B1C14, B1C-4)
Phase 6: Mechanical Phase - Replave VAV-1-2 and associated ducts and grilles. Add new Return air to B1C28. (B1C27, B1C28, B1C-8)
Phase 7: Mechanical Phase - Replace VAV 1-5 and associated ducts and grilles.
Replace CAV 1-7, CAV 1-8, and convert to single duct. (B1C07, B1C08, B1C09, B1C10)
Phase 8: Mechanical Phase - Replace CAV 1-6 and convert to single duct. Add Return Air to Corridor. (B1C06, B1C-5).
Phase 9: Mechanical Phase - Replace CAV 1-2, CAV 1-5, and convert to single duct.
Add Return Air to Corridor. (B1C05, B1C5, B1C-1A)
Phase 10: Mechanical Phase - Replave CAV 1-1, CAV 1-3, CAV 1-4 and convert to single duct. Replace VAV 1-1 and associated ducting. (B1C02, B1C05, B1C-1)
Phase 11: Mechanical Phase - New Return Air in Triage B1C31 (B1C30)
Phase 12: Mechanical Phase - New Supply Air in B1C18. Replace VAV 1-4 and associated ducts and grilles.
Phase 13: Mechanical Phase - New Supply Air in B1C20 Replace VAV 1-3 and associated ducts and grilles.
01b
Phase 1a: Tie New Mechanical Piping into existing piping main in elevator equipment room. Replace VAV 1-18 and associated ducts and grilles.
1/8" = 1'-0"
HVAC BASEMENT FLOOR PLAN
Revisions: Date:
1 CAP FOR CONNECTION TO PHASE 3
2 PROVIDE TEMPORARY DUCT AND DAMPERS.
3 PROVIDE TEMPORARY EXHAUST DUCT ABOVE CEILING FOR EACH PHASE'S ICRA CONTAINMENT.
PROVIDE TEMPORARY PENETRATION AT EXTERIOR WALL AND ROUTE EXHAUST STACK MINIMUM 10'
ABOVE ROOF LEVEL AND MINIMUM 25' FROM ANY FRESH AIR INTAKE, SECURE TO EXISTING
STRUCTURE. EXHAUST DUCT SHALL BE RECONFIGURED AT EACH PHASE TO SERVE EACH
CONTAINMENT, FIELD COORDINATE ROUTING ABOVE CEILING. TEMPORARY PENETRATION SHALL BE
PATCHED, REPAIRED AND FINISHED TO MATCH EXISTING.
F /M
H B
(E)16"ø SA(E)8"ø SA
(E)8"ø SA
(E)8"ø SA
(E )8
"ø S
A
(E)8"ø SA
(E )1
"ø
S A
(E)12"ø RA
(E)8"ø RA
(E)14"ø RA
(E)14"ø RA
(E )1
"ø
R A
(E)14"x10" RA
(E )1
"x
R A
(E )8
"ø R
A
(E )1
"x
E X
H
(E)14"x8" EXH
(E)14"x8" EXH
(E)14"x8" EXH
(E)12"ø EXH
(E)16"x12" EXH (E)14"x8" EXH
(E)14"x8" EXH
(E)6"ø EXH (E)6"ø EXH
(E)12"ø SA
(E)8"ø SA
(E)10"ø SA
(E)12"ø SA
(E)10"ø SA
(E)10"ø SA (E)8"ø SA
(E)10"ø SA(E )8
"ø S
A
(E)14"x8" RA
(E)14"x8" RA
(E)8"ø SA
(E)8"ø SA
(E)14"ø SA (E)12"ø SA
(E)12"ø SA
(E)12"ø SA
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
(E )1
"x
E X
H
12"ø SA
"ø
S A
12"ø SA
8"ø SA
8"x10" SA
8"ø SA
10"ø SA
(E)12"ø RA (E)12"ø RA
(E )4
"x
R A
(E)14"ø RA
(E )2
"x
R A
(E)8"ø SA
(E)18"x12" EXH
TRAUMA RM LARGE
B1C07
EXAM AREA
B1C04
ENTRANCE
ELEVATOR
B-19
SOCIAL WORK
OFFICE
B1C01
EXAM AREA
B1C03
VESTIBULE
VESTIBULE
LINEN CART ALCOVE
POLICE DISPATCH
B1C02
PROCEDURE RM
B1C05
CHARTING ALCOVE
WHEELCH. SCALE
---CORRIDOR
B1C-1A
TRAUMA RM SMALL
B1C06
TOILET
B1C08
CORRIDOR
B1C-8
CORRIDOR
B1C-5
NURSE STATION
B1C29A
CLINICAL CHARTING
RM
B1C29
CORRIDOR
B1C-7
AOD/ CHECK-IN
B1C30
INTERVENTION
(SECLUSION) ROOM
B1C28
WAITING
B1C-1
10"ø SA
8"ø SA
F4/MH100D
(E )1
"ø
R A
8"ø SA
TRIAGE RM
B1C31
12"ø EXH
12"ø SA
12"ø SA
8"ø…