This federal contract opportunity solicitation seeks proposals to remodel the emergency department observation bed area at the VA Medical Center in Fresno, California. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is soliciting bids under solicitation number 36C26123R0008 to remodel existing space into an observation bed unit within their emergency department. Interested parties should submit proposals by the deadline to provide construction and remodeling services, including but not limited to demolition, modifications to existing infrastructure, and upgrades to mechanical and electrical systems, to transform current treatment areas into an observation bed facility. The award date is not specified but work is expected to commence upon contract award.

View the file

Other files

File Type Posted
Technical Question Tracking Sheet -RFI 1-38 -ED Beds 02212023.pdf PDF
36C26123R0008 0007.docx DOCX document
36C26123R0008 0006.docx DOCX document
WD_CA20230018_02102023.pdf PDF
36C26123R0008 0005.docx DOCX document
Technical Question Tracking Sheet -RFI 1-36 -ED Beds-MRP-020823.pdf PDF
36C26123R0008 0004.docx DOCX document
36C26123R0008 0003.docx DOCX document
Site Visit_01262023 Sign in Sheet.pdf PDF
36C26123R0008 0002.docx DOCX document
36C26123R0008 0001.docx DOCX document
570-17-210.OPC.DWG.20230112Part-1.pdf PDF
Attachment A_Factor 1_Experience_01052023.xlsx XLSX spreadsheet
570-17-210.OPC.Specs.20221024.pdf PDF
ACM Report.pdf PDF
WD_CA29_11042022.pdf PDF
Attachment C_Large Business Subcontracting Plan Template_01032023.docx DOCX document
570-17-210.OPC.DWG.20221021Part-3.pdf PDF
Attachment B_Supplemental Price Breakdown_11222022.xlsx XLSX spreadsheet
36C26123R0008.docx DOCX document
Attachment D_Request for Information (RFI) Form_36C26123R0008.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"x

E X

H

"ø

S A

12"ø SA

18"x10"

"ø

E X

H

"x

S A

36"x22" RA

(E)24"x12" SA

5"ø SA

(E)8"ø SA (E)8"ø SA

8"ø RA

(E)16"ø SA(E)8"ø SA

(E)8"ø SA (E)8"ø SA

(E )8

"ø S

A

(E)8"ø SA

(E)42"x12" RA

(E )1

"ø

S A

(E )1

"x

S A

(E)14"ø SA

(E)12"ø RA

(E)8"ø RA

(E)14"ø RA

(E)14"ø RA

(E )1

"ø

R A(E)14"x10" RA

(E )1

"x

R A

(E )8

"ø R

A

(E )1

"x

E X

H

50"x12" RA

50"x12" RA

(E )1

"x

E X

H

(E)14"x8" EXH

(E)14"x8" EXH

(E)14"x8" EXH

(E)12"ø EXH (E)16"x12" EXH (E)14"x8" EXH

(E)14"x8" EXH

(E)10"ø RA (E)8"ø RA

(E)10"ø EXH

10"ø EXH

(E)8"ø EXH

(E)8"ø EXH

(E)6"ø EXH

8"ø5"ø

(E)6"ø SA

8"ø SA12"ø SA

8"ø SA

(E)6"ø EXH (E)6"ø EXH

8"ø SA

8"ø SA

6"ø SA

(E)12"ø SA

(E)8"ø SA

(E)10"ø SA

(E)12"ø SA (E)10"ø SA

(E)10"ø SA (E)8"ø SA

(E)10"ø SA

(E )8

"ø S

A(E)14"x8" RA

(E)14"x8" RA

(E)8"ø SA

(E)8"ø SA

(E)14"ø SA (E)12"ø SA

(E)12"ø SA

6"x6"

(E)8"x8" EXH

(E )8

"x

E X

H

(E)6"x6" EXH

(E)12"ø SA

(E)50"x24" RA

50"x18" EXH

72"x20" OA (E)48"x24" RA

48"x24" RA

8"x8" EXH

26"ø RA 30"ø RA

(E)20"x12" RA (E )1

"x

E X

H

(E)14"ø SA

(E )3

"x

S A

12"ø (E

)1 "x

E X

H 8"ø

"ø

S A

(E)12"ø RA (E)12"ø RA

8"ø8"ø SA

8"ø

8"ø (E

)4 "x

R A

(E)14"ø RA

(E )2

"x

R A

(E)8"ø SA (E)18"x12" EXH

6"ø SA

10"ø RA

10"ø RA

12"ø SA

"x

R A

(E )1

"ø

E X

H

(E)24"x12" SA

(E)8"ø SA

(E)14"ø SA

(E)8"ø RA

(E)18"x12" EXH

F1

MH100D

18"x10" EXH

(E)50"x12" SA

(E)54"x14" SA

14"ø SA 30"x12" EXH

(E)24"x12" SA

(E)10"ø SA (E)10"ø EXH

(E)8"ø SA

(E)6"ø SA

18"x10"

(E)16"x12" SA

(E)30"x12" SA

(E)24"x12" SA

(E)12"ø EXH(E)10"ø EXH

(E)8"ø EXH

(E)8"ø EXH

(E )1

"ø

R A

12"ø EXH

"x

R A

(E)12"x8" SA (E

)2 "x

S A

(E)54"x14" SA

(E )1

"ø

R A

(E )1

"x

S A

(E )1

"ø

S A

(E )1

"x

R A

(E )1

"ø

R A

(E)12"ø RA

42"x12" SA50"x12" SA

(E)37"x12" SA(E)14"ø SA

(E)14"ø SA

(E)6"ø SA

(E)6"ø SA

(E)8"ø SA (E)8"ø SA (E)12"ø SA

(E)8"ø SA

(E )8

"ø S

A (E

)1 "ø

S A

(E )3

"x

S A

(E )2

"x

S A(E

)2 "x

S A

(E )8

"ø S

A

(E)8"ø SA (E)8"ø SA

(E)20"x12" SA8"ø

(E)14"ø SA(E)14"ø SA

(E)14"ø SA

(E )2

"x

S A

(E)14"ø SA

(E)6"ø RA

(E)6"ø RA

(E)8"ø RA(E)10"ø RA

(E)8"ø RA

1b

9 6

1a

2 34

TEMPORARY DUCT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

A B

D C

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O

P C

.M E

.r v t

/2

/2

:2

:4

P

M

MD100

MECHANICAL DEMO PLAN -

OVERALL

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M.PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

1/8" = 1'-0"

HVAC BASEMENT FLOOR PLAN

PROJECT PHASING

01a Phase 1b: Install Temporary AHU and duct connections, commission temporary equipment and switch utilities. Renovate Soutthern portion (B1C21, B1C23, B1C24, B1C51, B1C52, B1C53, BC50, B1C-4). Replace VAV 1-12, VAV 1-13, VAV 1-14, VAV 1-15, and associated ducts and grilles.

Phase 2: After Temporary AHU is commissioned and operational, Remove and replace existing AHU. Can be performed concurrently with next phases.

Phase 3: Renovate Northern Portion (B1C25, B1C26, B1C-6A, B1C34A, B1C34B, B1C34C, B1C34D, B1C34H, B1C34K). Replace VAV 1-8, VAV 1-9, VAV 1-10, VAV 1-11, VAV 1-16, and associated ducts and grilles

Phase 4: Mechanical Phase - Replace VAV 1-17 and associated ducts and grilles.

(B1C37)

Phase 5: Mechanical Phase - Replace VAV 1-6, VAV 1-7, and associated ducts and grilles. Replace CAV 1-9 and convert to single duct. (B1C11, B1C12, B1C13, B1C14, B1C-4)

Phase 6: Mechanical Phase - Replave VAV-1-2 and associated ducts and grilles. Add new Return air to B1C28. (B1C27, B1C28, B1C-8)

Phase 7: Mechanical Phase - Replace VAV 1-5 and associated ducts and grilles.

Replace CAV 1-7, CAV 1-8, and convert to single duct. (B1C07, B1C08, B1C09, B1C10)

Phase 8: Mechanical Phase - Replace CAV 1-6 and convert to single duct. Add Return Air to Corridor. (B1C06, B1C-5).

Phase 9: Mechanical Phase - Replace CAV 1-2, CAV 1-5, and convert to single duct.

Add Return Air to Corridor. (B1C05, B1C5, B1C-1A)

Phase 10: Mechanical Phase - Replave CAV 1-1, CAV 1-3, CAV 1-4 and convert to single duct. Replace VAV 1-1 and associated ducting. (B1C02, B1C05, B1C-1)

Phase 11: Mechanical Phase - New Return Air in Triage B1C31 (B1C30)

Phase 12: Mechanical Phase - New Supply Air in B1C18. Replace VAV 1-4 and associated ducts and grilles.

Phase 13: Mechanical Phase - New Supply Air in B1C20 Replace VAV 1-3 and associated ducts and grilles.

01b

Phase 1a: Tie New Mechanical Piping into existing piping main in elevator equipment room. Replace VAV 1-18 and associated ducts and grilles.

GENERAL SHEET NOTES

KEYNOTES

A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB

REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE

CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS

FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR

TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND

DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG

NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT

FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE

AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE

EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION

SECTION 23 05 93 FOR MORE INFORMATION.

B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO

ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE

RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR

REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW

WORK ASSOCIATED WITH THE FACILITY RENOVATION.

C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION

D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.

E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.

N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.

O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.

P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND

M-803 FOR CONTROL SEQUENCE.

Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

Revisions: Date:

1 CUT AND CAP AT WALL

2 REPLACE RA DUCT MAIN TO THE PHASE 1/PHASE 3 BOUNDARY, RETAIN EXISTING DUCT WHILE NEW DUCT IS BEING INSTALLED TO MAINTAIN SERVICE. PERFORM AFTER-HOURS SHUT DOWN SWAP TO NEW

SERVICE

3 PROVIDE NEW SA CONNECTION AT PHASE 1/PHASE 3 BOUNDARY PRIOR TO REMOVING EXISTING SA

DUCT

4 PROVIDE TEMPORARY DAMPER ON TEMPORARY DUCT.

5 DEMO TO HERE IN PHASE 3, CAP DUCT.

09/11/2022

F4/MD100D

(E)18"x10"

(E)12"ø SA(E)8"ø SA

(E)8"ø SA

(E)8"ø SA

(E)10"ø SA

(E)16"ø SA(E)8"ø SA

(E)8"ø SA (E)8"ø SA

(E )8

"ø S

A

(E)8"ø SA

(E )2

"x

R A

(E )3

"x

S A

(E )1

"ø

S A

(E )2

"x

S A

(E)12"ø RA

(E)8"ø RA

(E)14"ø RA

(E )1

"ø

R A

(E)14"x10" RA

(E )1

"x

R A

(E )8

"ø R

A

(E )1

"x

E X

H

(E)14"x8" EXH

(E)14"x8" EXH

(E)14"x8" EXH

(E)12"ø EXH

(E)16"x12" EXH (E)14"x8" EXH

(E)14"x8" EXH

(E)12"ø (E)8"ø

(E)8"ø

(E)8"ø SA

(E )8

"ø

(E)12"ø SA

(E)8"ø SA (E )1

"ø

E X

H

(E )1

"ø

E X

H

(E )1

"ø

E X

H (E

)8 "ø

S A

(E)8"ø SA

(E)6"ø EXH (E)6"ø EXH

(E)8"ø SA

(E)8"ø SA (E)12"ø SA

(E)8"ø SA

(E)8"ø SA

(E)12"ø SA

(E)6"ø SA

(E)6"ø SA

(E)12"ø SA

(E)12"ø SA

(E)8"ø SA

(E)10"ø SA

(E)8"ø SA

(E)8"ø SA (E)12"ø SA

(E)10"ø SA

(E)10"ø SA

(E)8"ø SA

(E)10"ø SA

(E )8

"ø S

A

(E)14"x8" RA

(E)14"x8" RA

(E)10"ø SA

(E)8"ø SA

(E)8"ø SA

(E)8"ø SA

(E)12"ø SA

(E)12"ø SA

(E)14"ø SA (E)12"ø SA

(E )1

"ø

S A(E)12"ø SA

(E)8"ø SA

(E)12"ø SA

(E)16"x8"

2 2

TRAUMA RM LARGE

B1C07

TRAUMA RM SMALL

B1C06

EXAM AREA

LINEN CART ALCOVE

EXAM AREA

B1C03

SOCIAL WORK

OFFICE

B1C01

VESTIBLUE

VESTIBLUE

POLICE DISPATCH

B1C02

ENTRANCE

WAITING

B1C-1

PROCEDURE RM

B1C05

WHEELCH. SCALE

TRIAGE RM

B1C31

AOD/ CHECK-IN

B1C30

TRIAGE RM

B1C28

CORRIDOR

B1C-7

CLINICAL CHARTING

RM

B1C29

NURSE STATION

B1C29A

CORRIDOR

B1C-5

TOILET

B1C08

X-RAY ALCOVE

B1C07A

Unoccupied

Unoccupied

Elevator

B-19

B7

MD100A

F /M

D B

(E)6"ø SA

(E)6"ø SA

(E)8"ø SA

(E)8"ø SA (E)12"ø SA (E)12"ø SA

(E )2

"x

S A

(E )2

"x

S A

(E )1

"ø

S A

(E )8

"ø S

A

(E )8

"ø S

A

(E)8"ø SA

(E)8"ø SA

(E)8"ø SA

(E)8"ø SA

(E)12"ø RA

(E)8"ø RA

(E)5"ø SA

(E)10"ø SA

(E)10"ø SA

(E)10"ø SA

(E)10"ø EXH

(E)10"ø EXH

(TYP)

VAV-1-6

VAV-1-2

CV-1-8 CV-1-9

VAV-1-5

CV-1-7

CV-1-6

CV-1-1

CV-1-5

CV-1-2

CV-1-3

VAV-1-1

CV-1-4

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

A

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O

P C

.M E

.r v t

/2

/2

:2

:5

P

M

MD100A

MECHANICAL DEMO PLAN -LEVEL

B - AREA A

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

GENERAL SHEET NOTES

KEYNOTES

A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB

REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE

CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS

FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR

TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND

DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG

NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT

FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE

AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE

EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION

SECTION 23 05 93 FOR MORE INFORMATION.

B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO

ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE

RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR

REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW

WORK ASSOCIATED WITH THE FACILITY RENOVATION.

C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION

D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.

E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.

N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.

O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.

P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND

M-803 FOR CONTROL SEQUENCE.

Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

1/4" = 1'-0" F1

MECHANICAL DEMO PLAN - BASEMENT - AREA A

1 REMOVE EXISTING EXHAUST FAN (EF-1) SERVING NEGATIVE PRESSURE TREATMENT ROOMS 31 & 32.

2 REMOVE EXISTING CAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.

3 REMOVE EXISTING VAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.

4 REMOVE EXISTING THERMOSTAT.

5 EXISTING THERMOSTAT TO REMAIN.

NTS

B7

EXISTING EXHAUST FAN (EF-1) AND B1/OPC "CHASE"

Revisions: Date:

F4/MD100C

F1/MD100A

F4/MD100D

(E )1

"ø

E X

H

(E)12"ø EXH(E)10"ø EXH(E)8"ø EXH

(E )1

"ø

S A

(E)6"ø EXH

(E)6"ø EXH

(E)10"ø SA

(E)8"ø SA

(E)8"ø SA

(E)8"ø SA

(E)8"ø SA

(E)8"ø EXH

(E)10"ø SA

(E)14"x12" SA

(E)12"ø RA

(E)12"ø RA

(E)10"ø RA (E)8"ø RA

(E)8"ø RA

(E)6"ø RA (E)6"ø RA

(E)6"ø RA

(E)10"ø EXH(E)6"ø EXH

(E)8"ø EXH

(E )6

"ø E

X H

(E)12"ø SA

(E)8"ø SA

(E )8

"ø S

A

(E)8"ø SA (E)6"ø SA

(E)6"ø SA

(E )6

"ø S

A

(E)6"ø SA

(E)12"ø SA

(E)10"ø SA

(E )6

"ø S

A

(E)10"ø SA

(E )8

"ø S

A (E

)8 "ø

S A

(E)10"ø RA

(E )8

"ø R

A

(E )6

"ø S

A

(E)24"x12" SA

(E)12"ø SA

(E)54"x14" SA

(E)6"ø SA

(E)6"ø SA

(E)4"ø SA

(E)4"ø SA

(E )6

"ø S

A(E)6"ø SA

(E)10"ø SA

(E )2

"x

R A

(E)8"ø RA

(E)8"ø RA

(E)6"ø RA

(E )2

"x

S A

(E)30"x12" SA

(E)5"ø SA

(E)6"ø SA

(E)12"ø SA

(E)8"ø SA

(E )2

"x

S A

(E)8"ø RA

(E )1

"ø

S A

(E)16"x12" SA

(E)10"ø SA

(E)6"ø RA

(E )6

"ø R

A

(E)12"x8" SA

(E)12"ø

(E)8"ø SA

(E)6"ø RA

(E)50"x12" SA

(E)10"ø RA

(E)14"x12" EXH

(E)24"x12" SA

CORRIDOR

B1C-1

POLICE CHIEF

OFFICE

B1C35

PUBLIC AFFAIRS

B1C37

ELEVATOR

S-6

ELEVATOR EQUIP RM

B1C40

LINEN CLOSET

B1C41

LINEN CLOSET

B1C50

CORRIDOR

B1C-2

SMALL TOILET

B1C34C

OBS BEDS ROOM

B1C-6A

CLOSET

SOILED UTILITY RM

B1C55

TOILET

B1C24

OBSERVATION/

TREATMENT RM

B1C25

OBSERVATION/

TREATMENT RM

B1C26

MALE RR

B1C33

FEMALE RR

B1C32

PATIENT COMFORT

ROOM

B1C27

CRASH CART

ALCOVE

WAITING

B1C-1

OBSERVATION/

TREATMENT RM

B1C23

OBSERVATION/

TREATMENT RM

B1C22

TOILET

B1C54

CORRIDOR

B1C-6

SPD

B1C51

CHIEF OF ER

B1C52

HEAD NURSE

B1C53

HAC

B1C57

LINEN CLOSET

B1C42

(E )1

"x

S A

(E )1

"ø

S A

(E)8"ø SA

(E)28"x28" SA

(E)14"ø SA (E)37"x12" SA

(E )8

"ø S

A

(E)8"ø SA

(E)4"ø SA

(E )6

"ø R

A

6" CHS(E)

6" CHR(E)

3/4" CD(E)

2" MPS(E)

4" HWS(E)

4" HWR(E)

(E )1

"x

(E )1

"x

R A

(E )1

"x

R A

(E)18"x10" EXH (E)30"x12" EXH

VAV-1-6

VAV-1-16

VAV-1-17

VAV-1-18

VAV-1-9

VAV-1-8

VAV-1-11

VAV-1-14 VAV-1-15

VAV-1-12

VAV-1-13

VAV-1-10

VAV-1-7

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

B

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O

P C

.M E

.r v t

/2

/2

:2

:5

P

M

MD100B

MECHANICAL DEMO PLAN - LEVEL

B - AREA B

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

GENERAL SHEET NOTES

KEYNOTES

A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB

REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE

CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS

FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR

TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND

DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG

NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT

FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE

AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE

EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION

SECTION 23 05 93 FOR MORE INFORMATION.

B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO

ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE

RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR

REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW

WORK ASSOCIATED WITH THE FACILITY RENOVATION.

C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION

D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.

E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.

N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.

O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.

P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND

M-803 FOR CONTROL SEQUENCE.

Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

1/4" = 1'-0" F4

MECHANICAL DEMO PLAN - BASEMENT - AREA B

1 REMOVE EXISTING VAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.

2 REMOVE EXISTING THERMOSTAT.

3 EXISTING RETURN AIR GRILLE TO BE RELOCATED WITH THE ARCHITECTURAL RENOVATION.

5 REMOVE EXISTING FLEX DUCT.

F4/MD100D

(E )3

"x

E X

H

(E )1

"x

S A

(E)8"ø EXH

(E )6

"ø E

X H

(E )6

"ø S

A

(E )8

"ø E

X H

(E)24"x12" SA

(E)12"ø SA

(E)54"x14" SA

(E)4"ø SA (E)6"ø SA(E)6"ø SA

(E)6"ø SA

(E)4"ø SA

(E)4"ø SA

(E )6

"ø S

A(E)6"ø SA

(E)10"ø SA

(E )2

"x

R A

(E)8"ø RA

(E)8"ø RA

(E)6"ø RA

(E )2

"x

S A

(E)30"x12" SA

(E)5"ø SA

(E)8"ø SA

(E)18"x12" EXH

(E)50"x12" RA

(E)50"x12" RA

(E)12"x8" SA

(E)50"x18" EXH

(E)96"x18" EXH

(E)58"x18" OA

(E)72"x20" OA

(E)48"x24" RA

(E)50"x12" SA

(E)42"x12" SA

(E )2

"ø

R A

(E)30"ø RA

(E)10"ø RA

(E)24"x12" SA

ELEVATOR EQUIP RM

B1C40SOILED UTILITY RM

B1C55

OBSERVATION/

TREATMENT RM

B1C23

OBSERVATION/

TREATMENT RM

B1C22

MECHANICAL ROOM

B1C39

AREAWAY

TOILET

B1C54

CORRIDOR

B1C-6

SPD

B1C51

CHIEF OF ER

B1C52

HEAD NURSE

B1C53

HAC

B1C57

PAT HOLDING

B1C59

CT SCANNER

B1C62

EQUIP STOR

B1C60

STAIR NO.4

B1C43

LINEN CLOSET

B1C42

(E )1

"x

S A

(E )1

"ø

S A

(E)36"x12" RA

(E)36"ø SA

(E)28"x28" SA

(E)14"ø SA (E)37"x12" SA

(E)14"ø SA

(E)14"ø SA

(E)14"ø SA

(E)36"ø RA

(E)50"x12" RA

(E)18"x10" EXH

(E )8

"ø S

A

(E)8"ø SA

(E)4"ø SA

F4/MD100B

D1

MD100C

B1

MD100C

CONTROL ROOM

B1C61

CORRIDOR

B1C58

(E )1

"x

(E )2

"x

R A

(E)10"ø SA

(E)10"ø SA

(E)10"ø SA

(E )1

"x

S A

(E )1

"x

S A

(E)6"ø EXH

(E)6"ø EXH

(E)8"ø SA (E)8"ø SA

(E)8"ø RA

(E)12"ø RA

(E )1

"x

R A

(E)30"x12" EXH

VAV-1-6

VAV-1-11

VAV-1-14 VAV-1-15

VAV-1-12

VAV-1-13

VAV-1-7

1-AHU-4

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

C

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O

P C

.M E

.r v t

/2

/2

:2

:0

P

M

MD100C

MECHANICAL DEMO PLAN - LEVEL

B - AREA C

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

GENERAL SHEET NOTES

KEYNOTES

A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB

REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE

CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS

FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR

TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND

DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG

NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT

FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE

AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE

EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION

SECTION 23 05 93 FOR MORE INFORMATION.

B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO

ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE

RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR

REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW

WORK ASSOCIATED WITH THE FACILITY RENOVATION.

C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION

D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.

E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.

N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.

O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.

P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND

M-803 FOR CONTROL SEQUENCE.

Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

1/4" = 1'-0" F4

MECHANICAL DEMO PLAN - BASEMENT - AREA C

1 REMOVE EXISTING VAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.

2 REMOVE EXISTING THERMOSTAT.

3 REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIATED DUCTWORK.

4 REMOVE EXISTING EXHAUST DUCT OUTLET AT LOUVER.

6 EXISTING AIR HANDLING UNIT TO REMAIN, PROTECT IN PLACE.

7 REMOVE EXISTING AIR HANDLING UNIT 1-AHU-3 THROUGH LOUVER.

8 PROVIDE TEMPORARY ISOLATION DAMPERS BEFORE BEGINNING ANY DEMOLITION WORK. THE

DUCTWORK SHALL BE CLEANED, REPAIRED AND SEALED AIR TIGHT. THE CHANGEOVER SHALL BE PHASED TO INSTALL ONLY ONE TEMPORARY ISOLATION DAMPER AT A TIME BEFORE PROCEEDING TO THE NEXT DAMPER. THIS PROCESS SHALL OCCUR OUTSIDE OF FACILITY OPERATIONAL HOURS AND

WILL REQUIRE NIGHT AND WEEKEND WORK.

9 TEMPORARY SUPPLY AIR FLEXIBLE HOSE TO MAKE CONNECTION TO TEMPORARY ISOLATION DAMPER.

10 TEMPORARY RETURN AIR FLEXIBLE HOSE TO MAKE CONNECTION TO TEMPORARY ISOLATION DAMPER.

11 DISCONNECT EXISTING RETURN AIR CONNECTION FROM AIR HANDLING UNIT 1-AHU-3 AND CAP FOR

UTILIZATION OF TEMPORARY RETURN.

12 REMOVE EXISTING PIPING AND ISOLATION VALVES SERVING AIR HANDLING UNIT 1-AHU-3 BACK TO MAIN.

PIPING SYSTEM SHALL HAVE A MECHANICAL LINE STOP OR ICE PLUG TO STOP FLOW AND ALLOW FOR

NEW ISOLATION VALVE INSTALLATION.

NTS

D1

EXISTING 1-AHU-3 EXHAUST OUTLET AT LOUVER

NTS

B1

EXISTING OA INTAKE DUCT IN CHASE TO ROOF LEVEL

F4/MD100C

(E)24"x12" SA

(E)8"ø SA

(E)8"ø SA

(E )4

"x

R A

(E )1

"ø

S A

(E)14"ø SA

(E )1

"x

S A

(E)14"ø SA

(E )1

"x

E X

H

(E)10"ø RA

(E)8"ø RA

(E)8"ø RA

(E)10"ø EXH

(E )1

"ø

E X

H

(E)8"ø EXH

(E)8"ø EXH

(E)6"ø EXH

(E)8"ø

(E)5"ø

(E)10"ø SA (E)6"ø SA

(E)6"ø SA (E)6"ø SA

(E )8

"ø S

A

(E )8

"ø S

A

(E)6"ø EXH

(E)12"ø

(E)10"ø

(E)10"x6" SA

(E)6"x6"

(E)8"ø

(E)8"x8" EXH

(E )8

"x

E X

H

(E)6"x6" EXH (E)50"x24" RA

(E)48"x24" RA

(E)20"x12" RA

(E )1

"x

(E )1

"x

E X

H

(E)14"ø SA

(E)14"ø SA

(E)32"x12" SA

STAIR

B1C21

LOCKER RM

B1C20A

STAFF LOUNGE

B1C20

TRANSFORMER RM

B1C17A

AREAWAY

MECHANICAL ROOM

B1C39

ON-CALL RM

B1C18

CORRIDOR

B1C-4

ELECTRIC CLOSET

B1C16

TELEPHONE CLOSET

B1C15

TOILET

B1C19

OBSERVATION/

TREATMENT RM

B1C09

OBSERVATION/

TREATMENT RM

B1C10

OBSERVATION/

TREATMENT RM

B1C11

OBSERVATION/

TREATMENT RM

B1C12

OBSERVATION/

TREATMENT RM

B1C13

(E)18"x12" EXH

36"ø SA

36"ø RA

22"x34" SA

22"x34" RA

"ø

R A

"ø

S A

F4/MD100B

(E)10"ø EXH

(E)10"ø EXH

(E)14"ø SA

(TYP)

VAV-1-5

VAV-1-7

VAV-1-3

VAV-1-4

1-AHU-4RF-6

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

D

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O

P C

.M E

.r v t

/2

/2

:2

:0

P

M

MD100D

MECHANICAL DEMO PLAN - LEVEL

B - AREA D

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

GENERAL SHEET NOTES

KEYNOTES

A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB

REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE

CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS

FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR

TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND

DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG

NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT

FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE

AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE

EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION

SECTION 23 05 93 FOR MORE INFORMATION.

B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO

ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE

RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR

REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW

WORK ASSOCIATED WITH THE FACILITY RENOVATION.

C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION

D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.

E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.

N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.

O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.

P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND

M-803 FOR CONTROL SEQUENCE.

Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

1/4" = 1'-0" F4

MECHANICAL DEMO PLAN - BASEMENT - AREA D

1 REMOVE EXISTING VAV TERMINAL UNIT AND ASSOCIATED THERMOSTAT.

2 REMOVE EXISTING THERMOSTAT.

3 TEMPORARY SUPPLY AND RETURN AIR FLEXIBLE HOSE ENTERS THROUGH THE EXISTING WALL

KNOCKOUT INTO THE MECHANICAL ROOM TO MAKE CONNECTIONS AFTER TEMPORARY ISOLATION

DAMPERS.

4 TEMPORARY SUPPLY AND RETURN AIR FLEXIBLE HOSE DOWN INTO AREA WAY. REMOVE GRATES AS NECESSARY, SUPPLY TEMPORARY SAFETY BARRIERS AND SIGNAGE AROUND GRATE OPENING, SEE

SPECIFICATION 01 35 26. SEE SHEET MS101 AND MD100C FOR CONTINUATION.

5 PROVIDE TEMPORARY UNISTRUT FRAMING TO SUPPORT TEMPORARY DUCT AT HEIGHT OF EXISTING

KNOCKOUT PANEL AS REQUIRED, SEE SHEET M-502 FOR ADDITIONAL INFORMATION.

6 SEE SHEET MS101 FOR CONTINUATION.

7 REMOVE EXISTING DUCTWORK BACK TO MAIN. CAP AND SEAL REMAINING DUCT AIR TIGHT.

32"x16

DN

F1

MD102

D1

MD102

26"ø EXH

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

A B

D C

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O

P C

.M E

.r v t

/1

/2

:1

:5

P

M

MD102

MECHANICAL DEMO PLAN - ROOF

LEVEL

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M. PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

GENERAL SHEET NOTES

KEYNOTES

A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB

REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE

CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS

FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR

TO CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND

DEVELOP THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING

EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG

NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT

FIELD CONDITIONS, THE TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE

AIRFLOW AND WATERFLOW READINGS ON THE FORMS AND LOCATE THE

EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS. REFER TO SPECIFICATION

SECTION 23 05 93 FOR MORE INFORMATION.

B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO

ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE

RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR

REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW

WORK ASSOCIATED WITH THE FACILITY RENOVATION.

C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION

D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO

VIOLATIONS OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED

ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF.

ALL WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO

CLOSE OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.

E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIRE PROOF CAULKING MATERIAL.

F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR TO FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER

SIGNIFICANTLY FROM CONSTRUCTION DOCUMENTS.

H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL

TRADES PRIOR TO INSTALLATION.

I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR

PIPE PENETRATIONS AND SEAL COMPLETELY.

L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.

N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.

O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.

P. SEE M-701 AND M-702 FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND

M-803 FOR CONTROL SEQUENCE.

Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

1/8" = 1'-0" F4

MECHANICAL DEMO PLAN - ROOF

1 REMOVE EXISTING EXHAUST FAN (1-EF-ED) SERVING BASEMENT FLOOR EMERGENCY DEPARTMENT

2 REMOVE EXISTING OUTSIDE AIR INTAKE GRAVITY HOOD 1-GH-3 SUPPLYING 1-AHU-3.

3 EXISTING PHOTOVOLTAIC PANEL ARRAY TO REMAIN, PROTECT IN-PLACE.

4 EXISTING ROOFTOP MECHANICAL EQUIPMENT TO REMAIN, PROTECT IN-PLACE.

5 FUTURE ROOFTOP AIR HANDLING UNIT AND PIPING CONSTRUCTED UNDER SEPARATE RENOVATE

SPECIALTY CLINIC PROJECT.

NTS

D1

EXISTING EXHAUST FAN (1-EF-ED)

NTS

F1

EXISTING INTAKE HOOD (GH-3)

"x

E X

H

"ø

E X

H

(E)24"x12" SA

(E)16"ø SA(E)8"ø SA

(E)8"ø SA (E)8"ø SA

(E )8

"ø S

A

(E)8"ø SA

(E)42"x12" RA

(E )1

"ø

S A

(E )1

"x

S A

(E)14"ø SA

(E)12"ø RA

(E)8"ø RA

(E)14"ø RA

(E)14"ø RA

(E )1

"ø

R A(E)14"x10" RA

(E )1

"x

R A

(E )8

"ø R

A

(E )1

"x

E X

H

(E )1

"x

E X

H

(E)14"x8" EXH

(E)14"x8" EXH

(E)14"x8" EXH

(E)12"ø EXH (E)16"x12" EXH (E)14"x8" EXH

(E)14"x8" EXH

(E)10"ø RA

(E)8"ø RA

(E)10"ø EXH

10"ø EXH

(E)8"ø EXH (E)8"ø EXH

(E)6"ø EXH

(E)6"ø SA

(E)6"ø EXH (E)6"ø EXH

(E)12"ø SA

(E)8"ø SA

(E)10"ø SA

(E)12"ø SA (E)10"ø SA

(E)10"ø SA (E)8"ø SA

(E)10"ø SA

(E )8

"ø S

A(E)14"x8" RA

(E)14"x8" RA

"ø

S A

(E)8"ø SA

(E)14"ø SA (E)12"ø SA

(E)12"ø SA

6"x6"

(E)8"x8" EXH

(E )8

"x

E X

H

(E)6"x6" EXH

(E)12"ø SA

(E )5

"x

R A

72"x20" OA (E)48"x24" RA

48"x24" RA

8"x8" EXH

26"ø RA 30"ø RA

(E)20"x12" RA (E )1

"x

E X

H

(E)14"ø SA

(E )3

"x

S A

(E )1

"x

E X

H 12"ø SA

12"ø SA

8"ø SA

8"x10" SA

8"ø SA

10"ø SA

(E)12"ø RA (E)12"ø RA

(E )4

"x

R A

(E)14"ø RA

(E )2

"x

R A

(E)8"ø SA (E)18"x12" EXH

"x

R A

(E )1

"ø

E X

H

TRAUMA RM LARGE

B1C07

EXAM AREA

B1C04

ENTRANCE

ELEVATOR

B-19

ALCOVE,

WHEELCHAIR/

STRETCHER/ LIFT

B1D

SOCIAL WORK

OFFICE

B1C01

EXAM AREA

B1C03

VESTIBULE

VESTIBULE

LINEN CART ALCOVE

POLICE DISPATCH

B1C02

PROCEDURE RM

B1C05

CHARTING ALCOVE

WHEELCH. SCALE

---CORRIDOR

B1C-1A

TRAUMA RM SMALL

B1C06

TOILET

B1C08

CORRIDOR

B1C-8

CORRIDOR

B1C-5

NURSE STATION

B1C29A

CLINICAL CHARTING

RM

B1C29

CORRIDOR

B1C-7

AOD/ CHECK-IN

B1C30 INTERVENTION

(SECLUSION) ROOM

B1C28

WAITING

B1C-1

CORRIDOR

B1C-1

WAITING

B1C-1

FEMALE RR

B1C32

MALE RR

B1C33

PAT TLT

B1C34J

NEW OBSERVATION

ROOM

B1C34G

PATIENT COMFORT

ROOM

BC127

CORRIDOR

B1C-9

NEW OBSERVATION

ROOM

B1C23

NEW OBSERVATION

ROOM

BC24

NEW OBSERVATION

ROOM

B1C21

HAC

BC50

CORRIDOR

B1C-6

PAT SHWR

B1C25B

CLEAN UTILITY

BC26

PAT TLT

B1C25A

HALL

B1C-6A

NEW NURSES

STATION

B1C34B

NEW NURSES

STATION

B1C34F

NEW OBSERVATION

ROOM

B1C34K

CORRIDOR

B1C-2

LINEN CLOSET

B1C41

ELEVATOR EQUIP RM

B1C40

ELEVATOR

S-5

ELEVATOR

S-6

HEAD NURSE

B1C37

CHIEF OF ER

B1C35

OBSERVATION/

TREATMENT RM

B1C14

CORRIDOR

B1C-4

SOILED UTILITY

B1C53

CLEAN UTILITY

B1C52

STF TLT

BC51

CORRIDOR

B1C-2

STAIR NO.4

B1C43

LINEN CLOSET

B1C42

MECHANICAL ROOM

B1C17

AREAWAY

HAC

B1C49

EQUIP STOR

B1C44

STAIR

B1C21

OBSERVATION/

TREATMENT RM

B1C09

OBSERVATION/

TREATMENT RM

B1C10

OBSERVATION/

TREATMENT RM

B1C11

OBSERVATION/

TREATMENT RM

B1C12

OBSERVATION/

TREATMENT RM

B1C13

CORRIDOR

B1C-4

TELEPHONE CLOSET

B1C15

ELECTRIC CLOSET

B1C16

MECHANICAL ROOM

B1C17

AREAWAY

TRANSFORMER RM

B1C17A

ON-CALL RM

B1C18

TOILET

B1C19

STAFF LOUNGE

B1C20

LOCKER RM

B1C20A

NEW OBSERVATION

ROOM

B1C34A

NEW OBSERVATION

ROOM

B1C34C

NEW OBSERVATION

ROOM

B1C34E

NEW STORAGE

B1C34H

NEW STORAGE

B1C34D

6"ø SA

8"ø SA

10"ø SA

10"ø SA

6"ø SA

10"x6" SA

(E)24"x12" SA

(E)8"ø SA

(E)14"ø SA

8"ø SA

(E)8"ø RA

(E)18"x12" EXH

F1

MH100D

18"x10" EXH

(E)50"x12" SA

(E)54"x14" SA

30"x12" EXH

(E)24"x12" SA

14"x12" SA

8"ø SA (E)10"ø SA

(E)10"ø EXH

8"ø SA

(E)8"ø SA

6"ø SA

8"ø RA

6"ø SA

(E)30"x12" SA

(E)24"x12" SA

(E)12"ø EXH(E)10"ø EXH

(E)8"ø EXH

(E)8"ø EXH

"ø

E X

H

8"ø SA

8"ø SA

"ø

R A8"ø EXH

(E )1

"ø

R A

8"ø SA

8"ø RA 10"x12" SA

"ø

S A

8"ø SA

"x

S A

8"ø SA

8"ø SA

10"x10" SA 10"x10" SA

"ø

S A

"ø

S A

8"ø SA

"ø

S A

8"ø SA

10"x10" SA

8"ø SA

"x

R A

"ø

R A

8"ø RA 6"ø SA

8"ø SA

"ø

E X

H

8"ø SA

"ø

S A

6"ø SA

10"ø SA

"ø

S A

8"ø SA

8"ø EXH

TRIAGE RM

B1C31

12"ø EXH

12"ø SA

12"ø SA

"x

R A

"ø

E X

H

"ø

S A

"ø

E X

H

"ø

S A

(E)12"x8" SA (E

)2 "x

S A

(E)54"x14" SA

(E )1

"ø

R A

(E )1

"x

S A

(E )1

"ø

S A

(E )1

"x

R A

(E )1

"ø

R A

(E)12"ø RA

8"ø SA

8"ø SA

8"ø SA

8"ø SA

36"ø EXH

65"x18" EXH

"x

R A

66"x24" OA

66"x24" OA

50"x24" RA

"ø

S A

(E)37"x12" SA(E)14"ø SA "ø

R A

8"ø RA

"ø

S A

"ø

S A

10"x10" SA

8"ø RA

6"ø RA

6"ø RA

(E)14"ø SA

14"ø SA CONTROL ROOM

B1C45

PAT HOLDING

B1C47

CT SCANNER

B1C46

CORRIDOR

B1C48

(E)6"ø SA

(E)6"ø SA

(E)8"ø SA (E)8"ø SA (E)12"ø SA

12"ø SA

8"ø SA

(E)8"ø SA

(E )8

"ø S

A (E

)1 "ø

S A

(E )3

"x

S A

(E )2

"x

S A(E

)2 "x

S A

(E )8

"ø S

A

12"ø SA

(E)8"ø SA (E)8"ø SA

8"ø SA

6"ø RA

(E)20"x12" SA

32"x12" RA 26"x12" RA26"x12" RA 22"x12" RA

"x

R A

10"ø RA

10"ø RA

10"ø RA

(E)14"ø SA(E)14"ø SA

(E)14"ø SA

(E )2

"x

S A

(E)14"ø SA

(E)6"ø RA

(E)6"ø RA

(E)8"ø RA(E)10"ø RA

(E)8"ø RA

6"ø SA

6"ø SA

16"x15" SA

6"ø SA

WAITING

B1C-1

"x

R A

1b

1a

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Mechanical, Electrical and Plumbing:

KEY PLAN

A B

D C

A u to d e s k D o c s /5

-1

-2

E x p a n d

E D

B e d s

/5

-1

-2

.O

P C

.M E

.r v t

/2

/2

:2

:2

P

M

MH100

MECHANICAL DUCT PLAN - LEVEL

B - OVERALL

TRIPLE C - THE A-E GROUP

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

562.452.7175

MAT PERKINS

REMODEL ED BEDS FOR

OBSERVATION BEDS

2615 E. CLINTON AVENUE, FRESNO, CA 93703

570-17-210

OPC

09/11/2022 M.PERKINS G. WEAVER

ISSUED FOR

CONSTRUCTION

GENERAL SHEET NOTES

A. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TAB

REPORT FOR THE EQUIPMENT AND ASSOCIATED SYSTEMS SHOWN ON THE

CONSTRUCTION DOCUMENTS AND UTILIZE ALL AVAILABLE AS-BUILT DRAWINGS

FROM THE OWNER. TEST AND BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO

CONSTRUCTION AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP

THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING EQUIPMENT

LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND TAG NUMBERS. IF THERE

ARE LOCATIONS WHERE THE DRAWINGS DO NOT REFLECT FIELD CONDITIONS, THE

TEST AND BALANCE CONTRACTOR SHALL INCLUDE THE AIRFLOW AND WATERFLOW

READINGS ON THE FORMS AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON

THE DRAWINGS. REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE

INFORMATION.

B. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED TO

ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA FOR THE

RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT ENGINEER FOR

REVIEW AND COMMENT PRIOR TO COMMENCING THE DEMOLITION AND/OR NEW

WORK ASSOCIATED WITH THE FACILITY RENOVATION.

C. PROVIDE AIR BALANCE REPORT PRIOR TO FINAL INSPECTION

D. CONTRACTOR TO COORDINATE WITH ROOF INSTALLATION WARRANTY

REQUIREMENTS FOR ANY MODIFICATIONS TO ROOFING TO ENSURE NO VIOLATIONS

OCCUR OF THE WARRANTY. CONTRACTOR TO EMPLOY A CERTIFIED ROOFING

INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL

WARRANTY VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE

OUT. ROOFS AND/OR ROOFING IMPACTED BY WORK INCLUDE B126.

E. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL PIPING

PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED

AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF

CAULKING MATERIAL.

F. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL PROVIDE

NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN REQUIRED

EQUIPMENT ACCESS AND SERVICEABILITY.

G. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION OF

THOSE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY

FROM CONSTRUCTION DOCUMENTS.

H. CONTRACTOR TO COORDINATE ALL NEW EQUIPMENT LOCATIONS WITH ALL TRADES

PRIOR TO INSTALLATION.

I. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT CONNECTIONS

BETWEEN ALL DISSIMILAR METALS.

J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

K. CONTRACTOR TO PROVIDE ESCUTCHEONS ON ALL NEW EXPOSED EXTERIOR PIPE

PENETRATIONS AND SEAL COMPLETELY.

L. CONTRACTOR TO PROVIDE TEMPORARY FLOORING WHILE MODIFYING

SUBFLOORING.

M. SEE M-501 FOR LOW PRESSURE DUCT FITTING DETAILS.

N. SEE M-501 FOR DIFFUSER AND REGISTER CONNECTION DETAILS.

O. REPLACE ALL EXISTING DUCT WRAP IN AREA OF WORK.

P. SEE M-700 SERIES FOR MECHANICAL EQUIPMENT SCHEDULES AND M-802 AND M-803

FOR CONTROL SEQUENCE.

Q. PROVIDE PRECONSTRUCTION TAB READINGS OF THE EXISTING SUPPLY AIR AND

RETURN AIR SERVING THE ROOMS IN THE AREA OF WORK. REBALANCE EXISTING

SUPPLY AND RETURN AIR SYSTEMS AFTER DEMOLITION IS COMPLETE.

R. TECHNICAL COORDINATION DRAWINGS OF COMPLETE ASSEMBLIES, REFLECTING

ACCURATE PROJECT CONDITIONS, SHALL BE SUBMITTED WITH EQUIPMENT

SELECTIONS TO ENSURE SPACE ALLOWANCES ARE REFLECTED IN THE ACTUAL

SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN,

CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN

THE SUBMITTAL. CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND

VERIFICATION THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND

REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

KEYNOTES

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE RESISTANT, OR BOTH

FIRE AND SMOKE RESISTANT ARE SHOWN GRAPHICALLY ON PLANS WITH

HATCH PATTERNS.

PROJECT PHASING

01a Phase 1b: Install Temporary AHU and duct connections, commission temporary equipment and switch utilities. Renovate Soutthern portion (B1C21, B1C23, B1C24, B1C51, B1C52, B1C53, BC50, B1C-4). Replace VAV 1-12, VAV 1-13, VAV 1-14, VAV 1-15, and associated ducts and grilles.

Phase 2: After Temporary AHU is commissioned and operational, Remove and replace existing AHU. Can be performed concurrently with next phases.

Phase 3: Renovate Northern Portion (B1C25, B1C26, B1C-6A, B1C34A, B1C34B, B1C34C, B1C34D, B1C34H, B1C34K). Replace VAV 1-8, VAV 1-9, VAV 1-10, VAV 1-11, VAV 1-16, and associated ducts and grilles

Phase 4: Mechanical Phase - Replace VAV 1-17 and associated ducts and grilles.

(B1C37)

Phase 5: Mechanical Phase - Replace VAV 1-6, VAV 1-7, and associated ducts and grilles. Replace CAV 1-9 and convert to single duct. (B1C11, B1C12, B1C13, B1C14, B1C-4)

Phase 6: Mechanical Phase - Replave VAV-1-2 and associated ducts and grilles. Add new Return air to B1C28. (B1C27, B1C28, B1C-8)

Phase 7: Mechanical Phase - Replace VAV 1-5 and associated ducts and grilles.

Replace CAV 1-7, CAV 1-8, and convert to single duct. (B1C07, B1C08, B1C09, B1C10)

Phase 8: Mechanical Phase - Replace CAV 1-6 and convert to single duct. Add Return Air to Corridor. (B1C06, B1C-5).

Phase 9: Mechanical Phase - Replace CAV 1-2, CAV 1-5, and convert to single duct.

Add Return Air to Corridor. (B1C05, B1C5, B1C-1A)

Phase 10: Mechanical Phase - Replave CAV 1-1, CAV 1-3, CAV 1-4 and convert to single duct. Replace VAV 1-1 and associated ducting. (B1C02, B1C05, B1C-1)

Phase 11: Mechanical Phase - New Return Air in Triage B1C31 (B1C30)

Phase 12: Mechanical Phase - New Supply Air in B1C18. Replace VAV 1-4 and associated ducts and grilles.

Phase 13: Mechanical Phase - New Supply Air in B1C20 Replace VAV 1-3 and associated ducts and grilles.

01b

Phase 1a: Tie New Mechanical Piping into existing piping main in elevator equipment room. Replace VAV 1-18 and associated ducts and grilles.

1/8" = 1'-0"

HVAC BASEMENT FLOOR PLAN

Revisions: Date:

1 CAP FOR CONNECTION TO PHASE 3

2 PROVIDE TEMPORARY DUCT AND DAMPERS.

3 PROVIDE TEMPORARY EXHAUST DUCT ABOVE CEILING FOR EACH PHASE'S ICRA CONTAINMENT.

PROVIDE TEMPORARY PENETRATION AT EXTERIOR WALL AND ROUTE EXHAUST STACK MINIMUM 10'

ABOVE ROOF LEVEL AND MINIMUM 25' FROM ANY FRESH AIR INTAKE, SECURE TO EXISTING

STRUCTURE. EXHAUST DUCT SHALL BE RECONFIGURED AT EACH PHASE TO SERVE EACH

CONTAINMENT, FIELD COORDINATE ROUTING ABOVE CEILING. TEMPORARY PENETRATION SHALL BE

PATCHED, REPAIRED AND FINISHED TO MATCH EXISTING.

F /M

H B

(E)16"ø SA(E)8"ø SA

(E)8"ø SA

(E)8"ø SA

(E )8

"ø S

A

(E)8"ø SA

(E )1

"ø

S A

(E)12"ø RA

(E)8"ø RA

(E)14"ø RA

(E)14"ø RA

(E )1

"ø

R A

(E)14"x10" RA

(E )1

"x

R A

(E )8

"ø R

A

(E )1

"x

E X

H

(E)14"x8" EXH

(E)14"x8" EXH

(E)14"x8" EXH

(E)12"ø EXH

(E)16"x12" EXH (E)14"x8" EXH

(E)14"x8" EXH

(E)6"ø EXH (E)6"ø EXH

(E)12"ø SA

(E)8"ø SA

(E)10"ø SA

(E)12"ø SA

(E)10"ø SA

(E)10"ø SA (E)8"ø SA

(E)10"ø SA(E )8

"ø S

A

(E)14"x8" RA

(E)14"x8" RA

(E)8"ø SA

(E)8"ø SA

(E)14"ø SA (E)12"ø SA

(E)12"ø SA

(E)12"ø SA

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

(E )1

"x

E X

H

12"ø SA

"ø

S A

12"ø SA

8"ø SA

8"x10" SA

8"ø SA

10"ø SA

(E)12"ø RA (E)12"ø RA

(E )4

"x

R A

(E)14"ø RA

(E )2

"x

R A

(E)8"ø SA

(E)18"x12" EXH

TRAUMA RM LARGE

B1C07

EXAM AREA

B1C04

ENTRANCE

ELEVATOR

B-19

SOCIAL WORK

OFFICE

B1C01

EXAM AREA

B1C03

VESTIBULE

VESTIBULE

LINEN CART ALCOVE

POLICE DISPATCH

B1C02

PROCEDURE RM

B1C05

CHARTING ALCOVE

WHEELCH. SCALE

---CORRIDOR

B1C-1A

TRAUMA RM SMALL

B1C06

TOILET

B1C08

CORRIDOR

B1C-8

CORRIDOR

B1C-5

NURSE STATION

B1C29A

CLINICAL CHARTING

RM

B1C29

CORRIDOR

B1C-7

AOD/ CHECK-IN

B1C30

INTERVENTION

(SECLUSION) ROOM

B1C28

WAITING

B1C-1

10"ø SA

8"ø SA

F4/MH100D

(E )1

"ø

R A

8"ø SA

TRIAGE RM

B1C31

12"ø EXH

12"ø SA

12"ø SA

8"ø…