This is a Statement of Work (SOW) issued for the Milo McIver Restroom Restoration project at Milo McIver State Park in Oregon. The project involves updating and repairing a 1970's Campground Restroom and Shower facility, specifically focusing on demolition and replacement of tile surfaces and shower stall reconfiguration. The contractor must remove all existing wall and floor tile, demolish interior CMU shower wall dividers, perform concrete saw cutting for drain relocations, and install new tile throughout. The project must be completed by March 13th, 2025, and requires Eleganza Monsoon Glossy 4x16 ceramic wall tile or equivalent, with waterproofing that complies with ANSI A118.10 and ANSI A118.12 standards.

The scope is divided into six main tasks: demolition of existing tile and CMU walls, concrete cutting for drain relocations, waterproofing preparation, new tile installation, and seal coating of grout joints. The contractor is responsible for providing all equipment, labor, materials, and supplies necessary to complete the services. The owner's obligations are limited to providing project schedule, scope, and plan documents. The SOW emphasizes that services must be performed to obtain the greatest long-term value for the State of Oregon and result in prudent expenditure of public funds within project constraints.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

STATEMENT OF WORK

MILO MCIVER RESTROOM RESTORATION: TILE DEMO AND REPAIRS

1.0 BACKGROUND

The 1970’s Campground Restroom and Shower facility located at Milo McIver State Park needs updates and repairs to plumbing fixtures and shower stall configuration. Existing tile floor and wall surfaces will be demolished and updated as part of these updates.

2.0 SCOPE

Remove all tile from walls and flooring as well as demo interior CMU shower wall dividers. Saw cut and remove concrete floor in area of shower drain relocation areas and prep walls and floor for installation of new tile on all vertical and horizontal wall surfaces.

3.0 WORK AND DELIVERABLES

3.1 Contractor’s Obligations

Contractor shall perform the tasks and provide the deliverables set forth in this section according to the requirements, standards, and expectations set forth in the Contract and this Statement of Services:

3.1.1 General Requirements

• Perform all Services according to the stated tasks, requirements, delivery schedule, and relevant industry standards;

• Provide all equipment, labor, materials, and supplies necessary to complete the Services and

• Keep a record of Services performed, including sufficient detail to substantiate invoices.

• Contractor shall perform the Services specified in this Contract to obtain the greatest long-term value for the State of Oregon and to result in the prudent expenditure of public funds within the constraints of the Project program, context and budget.

3.1.2 Work Schedule. Contractor shall begin providing the Services upon the Effective Date of the Contract and shall continue to provide all Services required under the Contract until the completion of the Project. All task under this contract must be completed no later than March 13th, 2025, unless approved by project manager.

3.1.3 Product Specifications

• Obtain tile from same production run and of consistent quality in appearance and physical properties for each contiguous area.

• Tile product to be Eleganza Monsoon Glossy 4x16 ceramic wall tile or equivalent

• Waterproofing of shower areas to comply with ANSI A118.10 and ANSI A118.12

• Water-Cleanable Epoxy Grout, color to be verified by project manager

3.1.3 Tasks and Deliverables. The tasks to be performed by Contractor are described below:

Task 1. Demo, remove, and dispose of existing wall and floor tile per plans.

Task 2. Demo, remove, and dispose of interior CMU shower block walls.

Task 3. Saw cut concrete areas of existing shower drains to allow removal of old drainpipe and provide access to new drain locations per plans.

Task 4. Prep and waterproof all areas indicated on plans for the installation of new tile and epoxy floor covering.

Task 5. Provide and install new tile to all interior walls per plans.

Task 6. Provide and install seal coat for all tile grout joints.

4.0 OWNER OBLIGATIONS

Owner will provide the following:

• Project Schedule, Scope, and plan documents.