Attachment B Statement of Work.docx
DOCX document 32 KB Posted
- Attached to
- Gravel Purchase, Hiawatha NF
- Solicitation number
- 12444626Q0026
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for the Gravel Supply Project (FR2109 and Corner Lake Pit) under Solicitation Number 12444626Q0026, issued by the Department of Agriculture Forest Service for the Hiawatha National Forest. The contractor must furnish all materials, equipment, trucking, labor, supervision, transportation, and weight documentation to complete aggregate hauling and placement operations. Specifically, the contractor shall supply and haul MDOT 23A gravel and 3" gravel, unload materials using spreader chains at designated locations on Forest Road 2109, and place unloaded gravel at the Corner Lake Pit adjacent to specified pile locations. Both project sites are located approximately 17 miles north of the US Highway 2/FH-13 intersection in Delta County, Michigan.
Delivery requirements specify a minimum of 400 tons per day and maximum of 600 tons per day, with all deliveries occurring between 7:00 AM and 3:30 PM, Monday through Thursday. The contractor must provide dated and timed weight slips for every load, submitting daily documentation to the Forest Service Representative. Operations are limited to defined project boundaries on FR2109, and the contractor is responsible for confining work to designated limits, preventing damage to natural surroundings, and restoring any damaged areas at no additional cost to the Government. The Forest Service will provide traffic control signage and maintain public access to roads during project activities, while the contractor must comply with all safety requirements on the Forest Service road system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QAs.docx | DOCX document | |
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Attachment D Submission Package 2.docx | DOCX document | |
| Attachment A Schedule of Items.docx | DOCX document | |
| 12444626Q0026 HIA Gravel Purchase.pdf | ||
| Attachment C Maps.pdf | ||
| Attachment D Submission Package.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 302
STATEMENT of work sCOPE OF PROJECT Name of Project: Gravel Supply Project – FR2109 and Corner Lake Pit Work for this project consists of: Furnish all material, equipment & trucking, labor including wages, supervision, transportation, weight slips, MDOT 23A gravel, 3” gravel and misc. materials necessary to complete aggregate hauling and chain spreading/unloading on FR 2109 and unloading/pile placement in the Corner Lake Pit as stated in the specifications and attachments.
Forest Service will provide traffic control signage. These signs will warn the public of “Road Construction Ahead”. The Contractor will follow all Safety requirements on the Forest Service road system. The roads will be open to the Public during project activities.
Contractor shall supply, haul, and place MDOT 23A aggregate.
Contractor shall unload gravel using spreader chains in locations designated by Forest Service personnel on FR2109.
Contractor shall unload MDOT 23A and 3” gravel in locations designated by Forest Service personnel at the Corner Lake Pit. Piles will be located adjacent.
The Contractor shall deliver at a minimum of 400 tons/day and no more than 600 tons/day.
The Contractor shall deliver aggregate between 7:00 AM and 3:30 PM, Monday through Thursday.
Contractor shall provide weight slips (date/time) for every load of gravel delivered. All weight slips at the end of each day shall be provided to the Forest Service Representative.
location FR 2109 is located approximately 17 miles North of US Highway 2/FH-13 intersection in Delta County.
Corner Lake Pit is located approximately 17 miles North of US Highway 2/FH-13 intersection and approximately 2 miles east in Delta County.
USE OF PREMISES
General: The Contractor shall limit his operations to the construction limits within the defined area of FR 2109.
Preservation of Natural Features: Contractor shall confine all operations to work limits of the project and prevent damage to natural surroundings. Contractor shall restore damaged areas at no additional expense to the Government.