ATTACHMENT B - Single Family Weatherization Major Measure Price List - 2025.xlsx
XLSX spreadsheet 59 KB Posted
- Attached to
- RFP 2025-27 weatherization and related specialty construction services to low-income residents
- Solicitation number
- S-C01010-00013133
- Issued by
- Clackamas County, Oregon
About this file
This document is a comprehensive Single Family Weatherization Major Measure Price List for 2025, issued by Clackamas County Weatherization located in Oregon City, Oregon. The attachment contains an extensive spreadsheet detailing specific weatherization measures and associated costs for single-family homes, including site-built and manufactured homes. The price list covers a wide range of services such as insulation installation, air sealing, ventilation improvements, duct sealing, window and door replacements, and health and safety modifications. The document provides a detailed work order template and itemized pricing for approximately 259 distinct weatherization measures, with each item having a unit of measurement and space for unit pricing.
The pricing list is designed for the Oregon Weatherization Assistance Program and requires compliance with ASHRAE 62.2-2016 standards for all homes worked on as of July 1, 2017. Measures are categorized into various subcategories including mechanical ventilation, air sealing, insulation, health and safety, energy-related repairs, and home performance improvements. Pricing is structured to cover labor, materials, and specific technical interventions, with options for different home types and specific construction characteristics. The document appears to be a comprehensive pricing guide for contractors performing weatherization services, with the goal of improving energy efficiency, indoor air quality, and structural integrity of residential properties.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lists
| ITEM DESCRIPTION | Category | Measure | INVOICE CATEGORIES | |
| 0. Miscellaneous Material | [CATEGORY] | [MEASURES] | ASHRAE – Mechanical Ventilation | 1 |
| 1. Hourly Rate | Misc | AirSeal | Infiltration | 2 |
| 2. Post Blower Door Operations | Air Sealing | Attic | Infiltration- Energy Related Repair | 3 |
| 3. Blower Door Directed Air-Sealing | Attic | Balancing | Duct Sealing/Repair | 4 |
| 4. 2-Part Polyurethane Foam System | Knee Wall/Pony Wall | Baseload | Duct Insulation | 5 |
| 5. Sheetrock | Attic Venting & Accesses | Duct Insulation | Ceiling Insulation | 6 |
| 6. Seal Chimney Chaseway (Basement & Attic) | Floor | Duct Seal | Mobile Home Exterior Roof Insulation | 7 |
| 7. Seal Interior Plumbing Penetrations | Duct Insulation/Related | Fan | Energy Related Repair - Ceiling | 8 |
| 8. Attic Heat Producing Fixtures | Blown-In Cavity (Bump Out, Slopes, Kw, Garage) No Flat Attic or AG Wall | Floor | Floor Insulation | 9 |
| 8.1 R-49 Blown-In Fiberglass | Blown In Wall Insulation | Health & Safety | Energy Related Repair - Floor | 10 |
| 9. R-38 Blown-In Fiberglass | Labor Only | LeadSafe | Wall Insulation | 11 |
| 10. R-27 Blown-In Fiberglass | Mechanical/Miscellaneous | Misc | Energy Related Repair - Walls | 12 |
| 11. R-19 Blown-In Fiberglass | Door | Other | Window Replacement | 13 |
| 12. R-38 Blown-In Cellulose | Manufactured Home | Repair | Energy Related Repair - Windows | 14 |
| 12.1 R-49 Blown-In Cellulose | Manufactured Home Water Heater Closet | Wall | Door Replacement | 15 |
| 13. R-27 Blown-In Cellulose | Windows | Window | Energy Related Repair - Doors | 16 |
| 14. R-19 Blown-In Cellulose | Pressure Balancing/Home Performance | Measure | Water Heater Repair/Replacement | 17 |
| 15. Drill & Fill or Pull Boards (Labor Only) | LEAD Safe Practices | [PRE/TARGET CFM] | Insulate Pipe at H20 (Water Heater) Tank | 18 |
| 16. Knee Wall/Pony Wall/Rim Joist Blocks | VENDOR Line 1 | Infiltration | Address Health & Safety Issues | 19 |
| 17. Add Unfaced R-11 Batt to Existing Insulation | [Company Name] | Duct Sealing /Repair | LEAD SAFE WEATHERIZATION | 20 |
| 18. R-21 Kraft-Faced FG Batt | Alpha | Other | Furnace Repair/Replacement | 21 |
| 19. Add Tyvek/FSK/Equivalent Only | Energy Comfort and Construction | Electrical Inspection | 22 | |
| 20. Twine Only | Good Energy | |||
| 21. R-13 FG Blow | Green Energy | |||
| 22. Install R-15 Kraft-Faced FG Batt | Performance | |||
| 23. Roof Vent 50 NFA | Richart | |||
| 24. Roof Vent 92 NFA | Other | |||
| 25. Gable Vent | [HEATING SOURCE] | |||
| 26. Soffit Vent or Freeze Block Vent | Electric - PGE | |||
| 27. Repair or Replace Flat Access Door | Electric - Canby CUB | |||
| 28. Cut in New Operable Flat Attic Access | Gas | |||
| 30. WXStrip & Insulate Exist Flat Attic Access | Oil | |||
| 31. Repair or Replace KW Access | Propane | |||
| 32. Cut New Operable KW Access | Pellet | |||
| 33. Cut New Inoperable KW Access | Wood | |||
| 34. WXStrip & Insulate Exist KW Access | Other | |||
| 35. Install New Ground Cover | ||||
| 36. Water Pipe Insulation | ||||
| 38. Add R-11 Unfaced FG Batts to Existing Insulation | ||||
| 40. R-25 Faced FG Batts | ||||
| 41. R-30 Faced FG Batts | ||||
| 42. R-25 FG Floor Blow (Site Built) | ||||
| 43. R-30 FG Floor Blow (Site Built) | ||||
| 44. Floor With Ducts | ||||
| 46. Twine Floor Only | ||||
| 47. Irregular Joist Space | ||||
| 48. Low Clearance | ||||
| 49. Air Barrier | ||||
| 50. 16 X 8 Vent In Wood | ||||
| 51. Intentionally Left Blank | ||||
| 52. R-11 Vinyl Faced Fiberglass | ||||
| 53. Intentionally Left Blank | ||||
| 54. R-19 Vinyl Faced Fiberglass | ||||
| 55. Intentionally Left Blank | ||||
| 56. Duct Seal Entire System (Site Built) | ||||
| 57. 2x4 R-13 Cellulose High Density | ||||
| 58. 2x6 R-25 Cellulose High Density | ||||
| 59. 2x8 R-30 Cellulose High Density | ||||
| 60. 2x10 R-38 Cellulose High Density | ||||
| 61. 2x12 R-44 Cellulose High Density | ||||
| 62. R-13 Fiberglass | ||||
| 63. R-13 Cellulose High Density | ||||
| 64. Install Cellulose In Wall Cavities, Not High Density | ||||
| 65. Cellulose Dense Pack In Cavities W/ Exist Insulation | ||||
| 66. R-13 Fiberglass High Density | ||||
| 67. R&R Shake Siding | ||||
| 68. R&R Wood Siding | ||||
| 69. R&R Vinyl Siding | ||||
| 70. R&R Metal/Aluminum Siding | ||||
| 71. R&R Asbestos Siding | ||||
| 72. R&R Blind-Nailed Asbestos Siding | ||||
| 73. R&R Asphalt Siding | ||||
| 74. Access Drill And Fill | ||||
| 75. Intentionally Left Blank | ||||
| 76. Drill And Fill Stucco Siding | ||||
| 77. Drill & Fill, Access Through Interior | ||||
| 78. Batt & Cover Open Bump Out | ||||
| 79. Block & Blow Closed Bump Out | ||||
| 80. Remove & Replace Existing Bath Fan | ||||
| 81. Vent Existing Bath Fan | ||||
| 82. Remove & Replace Existing Kitchen Fan | ||||
| 83. Vent Existing Kitchen Fan | ||||
| 83.1. Install New Kitchen Range Hood | ||||
| 83.2. Install A Humidistat Timer Switch | ||||
| 83.3. Install A Fan Switch/Delay/Ventilation Controller | ||||
| 83.4. Install New Bath Fan | ||||
| 84. Furnish And Install Dryer Vent | ||||
| 85. Fresh Air 80 | ||||
| 86. Jamb Up Weatherstrip Kit | ||||
| 87. Threshold And Door Shoe | ||||
| 88. Retractable Sweep | ||||
| 89. R&R Keyed Alike Lockset | ||||
| 90. Intentionally Left Blank | ||||
| 91. R&R Solid Core Pre-Hung/Door Blank | ||||
| 92. R&R Pre-Hung Door R-7 | ||||
| 93. R&R Manufactured Home Door R-7 | ||||
| 94. Intentionally Left Blank | ||||
| 95. Epdm W/ 3" Multi-Max Foam Board Or Equiv. | ||||
| 96. Epdm W/ 1.5" Multi-Max & R-19 FG Attic Blow | ||||
| 97. Epdm W/ 1.5" Multi-Max & R-21-38 FG Attic Blow | ||||
| 98. R-21 FG Floor Blow | ||||
| 99. R-30 FG Floor Blow | ||||
| 100. R-25 FG Floor Blow, Add Rodent Barrier | ||||
| 101. Add Cold Air Return Grille In Furnace Closet Door | ||||
| 102. Seal Ducts Single Wide | ||||
| 103. Seal Ducts Double Wide | ||||
| 104. Seal Branch Duct Connection | ||||
| 105. Replace Existing Crossover Duct | ||||
| 106. Install Blue/Pink Board | ||||
| 107. Repair Belly Board | ||||
| 108. Insulate Water Heater Cavity Inc. Door | ||||
| 109. Insulate Water Heater Cavity Door Only | ||||
| 110. Vinyl Window Replacement | ||||
| 111. Add Safety Glass | ||||
| 112. R&R Double Strength Glass, Wood Sash | ||||
| 113. R&R Glass Aluminum Sash | ||||
| 114. Intentionally Left Blank | ||||
| 115. Intentionally Left Blank | ||||
| 116. Under Cut Door (Per Door) | ||||
| 117. Install By-Pass Grilles In Door | ||||
| 118. Install By-Pass Grilles In Wall | ||||
| 119. Install By-Pass Grilles In Ceiling W/ Jump Over Duct | ||||
| 120. Add Fresh Air To Return | ||||
| 121. Restrict Flow Of Exhaust Fans, Ducts, or Air Inlets | ||||
| 122. Lead Safe Practices | ||||
| Other: |
Work Order Template
ATTACHMENT B W.O DATE: JOB#:
| Contractor | General | ||
| Information | Audit Date: | Auditor: | Fuel Source |
| Customer Information: | |
| Name: | Phone: |
| Address: | Alternative#: |
| City, State, Zip: | Mobile Park: |
| All Measures will be completed according to: Oregon Weatherization Assistance Program Site Built and Manufactured Home Field Guide and Standards | |||||
| As of July 1, 2017 all homes worked on must be ASHRAE 62.2-2016 compliant before any weatherization work is to be started. | |||||
| ITEM | ITEM DESCRIPTION | QTY | UNIT | Unit | Total |
| 1 | Remove and replace existing ceiling mount exhaust fan | Each | $ | ||
| 2 | Install new ceiling mount exhaust fan with light | Each | $ | ||
| 3 | Install new ceiling mount exhaust fan | Each | $ | ||
| 4 | Remove and replace existing wall mount exhaust fan | Each | $ | ||
| 5 | Install new wall mount exhaust fan | Each | $ | ||
| 6 | Remove and replace existing 30" kitchen range hood | Each | $ | ||
| 7 | Install new kitchen range hood with damper | Each | $ | ||
| 8 | Remove and replace existing wall mount kitchen exhaust fan | Each | $ | ||
| 9 | Remove and replace existing ceiling mount kitchen exhaust fan | Each | $ | ||
| 10 | Install new ceiling mount kitchen exhaust fan | Each | $ | ||
| 11 | Vent existing bathroom exhaust fan using 4” to 6” vent pipe | Lf | $ | ||
| 12 | Vent new bathroom exhaust fan using 4” to 6” vent pipe | Lf | $ | ||
| 13 | Vent bathroom exhaust fan to gable end using 4” to 6” vent pipe | Lf | $ | ||
| 14 | Vent existing kitchen range hood using 5” to 8” vent pipe | ||||
| Lf | $ | ||||
| 15 | Vent new kitchen range hood using 5” to 8” vent pipe | Lf | $ | ||
| 16 | Vent New ASHRAE kitchen ceiling exhaust fan using 5” to 8” vent pipe | Lf | $ | ||
| 17 | Vent existing down draft kitchen exhaust fan using 5” to 8” vent pipe | Lf | $ | ||
| 18 | Install new exterior metal wall hood to existing bathroom exhaust vent | Each | $ | ||
| 19 | Install new exterior metal wall hood to existing kitchen exhaust vent | Each | $ | ||
| 20 | Install ASHRAE compliant bathroom exhaust fan switch/delay/ventilation control wall switch with separate switch for light | Each | $ | ||
| 21 | Install ASHRAE compliant bathroom exhaust fan switch/delay/ventilation control wall switch | Each | $ | ||
| 22 | Install Humidistat timer switch with multi humidity settings | Each | $ | ||
| 23 | Install bathroom exhaust fan mechanical switch | Each | $ | ||
| 24 | Install kitchen exhaust fan mechanical switch | Each | $ | ||
| 25 | Install pig tail for kitchen range hood | Each | $ | ||
| 26 | Install New pig-tail with j-box to kitchen range hood | Each | $ | ||
| 27 | ASHRAE air sealing-when not assigned to major measure | Per 100 CFM | $ | ||
| 28 | Replace existing dryer venting | Lf | $ | ||
| 29 | Replace dryer vent hood and connect to existing vent pipe. | Each | $ | ||
| 30 | Install new metal R-49 roof vent | Each | $ | ||
| 31 | Remove and replace existing roof vent with new metal R-49 | Each | $ | ||
| 32 | Install new metal integrated snorkel vent | Each | $ | ||
| 33 | Pressure balancing | Hourly | $ | ||
| 34 | Undercut door (up to 2”) | Each | $ | ||
| 35 | Furnish and Install by-pass grill to door min 12"x12", 16"x4", 16"x6", 16”x 8” | Set | $ | ||
| 36 | Install by-pass grill 16”x 4” – 16”x 8” in wall | Set | $ | ||
| 37 | Install by-pass grill 10”x 4” in ceiling, to include 6” flex jump-over duct up to 10 LF. | Set | $ | ||
| 38 | Add inline damper to existing exhaust fan 4” to 7” | Each | $ | ||
| 39 | Install inline damper to kitchen fan or range hood. | Each | $ | ||
| 40 | Lead safe Weatherization | Hourly | $ | ||
| 41 | Time to contact and coordinate with asbestos contractors | Project | $ | ||
| 42 | Encapsulate over confirmed/presumed asbestos duct bands | Each | $ | ||
| 43 | Install combustion air vent to air tight wood stove or pellet stove | LF | $ | ||
| 44 | Install combustion air for non-air tight combustion appliance to the outdoors | LF | $ | ||
| 45 | Install fresh air 80 or 100 | Each | $ | ||
| 46 | Install new 6-mil ground cover (if no floor insulation called for) | Sq.Ft. | $ | ||
| 47 | Install mechanical ABS plumbing vent cap | Each | $ | ||
| 48 | Properly enclose flying splices on hot water tank | Each | $ | ||
| 49 | Daily Test Out Requirement | Each | $ | ||
| 50 | Blower door directed air sealing - per 100 cfm reduction. | Per 100 CFM | $ | ||
| 51 | Air sealing with 2 part foam system | Sq.Ft. | $ | ||
| 52 | Sheetrock patching | Sq.Ft. | $ | ||
| 53 | Sheetrock install | Per Sheet | $ | ||
| 54 | Chimney chase way/s if opening is over 2 sq.ft. | Sq.Ft. | $ | ||
| 55 | Seal interior plumbing penetrations when not assigned to a major measure where opening is over 3 sq.ft. | Each | $ | ||
| 56 | Remove and replace existing broken single pane glass from a wood sash | Sq.Ft. | $ | ||
| 57 | Remove and replace existing broken glass in aluminum sash | SqFt. | $ | ||
| 58 | Remove and replace existing broken IGU | Sq.Ft. | $ | ||
| 59 | Remove and replace glazing compound | LF | $ | ||
| 60 | Install door weatherstrip kit | Each | $ | ||
| 61 | Install new snap bead vinyl weatherstrip | Each | $ | ||
| 62 | Install new door threshold up to 48” | Each | $ | ||
| 63 | Install new door shoe up to 48” | Each | $ | ||
| 64 | Install new door sweep up to 48” | Each | $ | ||
| 65 | Adjust existing door | Each | $ | ||
| 66 | Block and seal knee-wall rakes | LF | $ | ||
| 67 | Block and seal basement Rim joists | LF | $ | ||
| 68 | Block and seal tops and bottoms of balloon framed walls | LF | $ | ||
| 69 | Block and seal top framing of Kitchen/Bathroom Soffit | LF | $ | ||
| 70 | All (IC and non-IC rated)recessed light fixtures air sealed using sheetrock box | Each | $ | ||
| 71 | Heat producing fixtures (when not insulating attic) | Each | $ | ||
| 72 | Remove non IC rated recessed lights and replace with new IC rated air tight unit | Each | $ | ||
| 73 | Install LED airtight retrofit kit to existing can light fixture | Each | $ | ||
| 74 | Floor patch repair and seal | Sq.Ft. | $ | ||
| 75 | Replace attic access (when not insulating) | Each | $ | ||
| 76 | Weatherstrip interior attic access (when not insulating) | Each | $ | ||
| 77 | Repair and weatherstrip interior attic access (when not insulating) | Each | $ | ||
| 78 | Install thermal, air tight attic pull down enclosure | Each | $ | ||
| 79 | Replace existing crawlspace access (when not insulating) | Each | $ | ||
| 80 | Weatherstrip interior floor access (when not insulating) | Each | $ | ||
| 81 | Repair and weatherstrip interior floor access (when not insulating) | Each | $ | ||
| 82 | Weatherstrip interior knee-wall access door (when not insulating) | Each | $ | ||
| 83 | Build knee-wall access door and weatherstrip | Each | $ | ||
| 84 | Cut in temporary access and seal upon completion | Each | $ | ||
| 85 | Install compression fit foam board at fire place opening | Each | $ | ||
| 86 | Install R-19 blown in fiberglass insulation | Sq.Ft. | $ | ||
| 87 | Install R-27 blown in fiberglass insulation | Sq.Ft. | $ | ||
| 88 | Install R-38 blown in fiberglass insulation | Sq.Ft. | $ | ||
| 89 | Install R-49 blown in fiberglass insulation | Sq.Ft. | $ | ||
| 90 | Low clearance attic space. Labor only | Sq.Ft. | $ | ||
| 91 | Floored attic areas – Labor only | Sq.Ft. | $ | ||
| 92 | Cut in and install new attic access approx. 20”x30” | Each | $ | ||
| 93 | Seal off existing attic access and install new approx. 20”x30” | Each | $ | ||
| 94 | Install 1/2” minimum plywood damming | LF | $ | ||
| 95 | Install fiberglass damming | LF | $ | ||
| 96 | Install Electrical Junction boxes to enclose flying splices | Each | $ | ||
| 97 | Install cover plate to J-Box, outlet or switch box | Each | $ | ||
| 98 | Dam knob and tube wiring | Sq.Ft. | $ | ||
| 99 | Install baffle to low venting | Each | $ | ||
| 100 | Rescreen rafter/eave vents using 1/8” screen | Each | $ | ||
| 101 | Install rafter/eave vent-frieze block vent 2”x4”-2”x6” by 16” or 24” Frieze Block Vent | Each | $ | ||
| 102 | Install soffit vent 4”x16”, 6”x 16” or 8”x16” | Each | $ | ||
| 103 | Install gable vent 8”x12”, 8”x16” or 12”x12” | Each | $ | ||
| 104 | Install large gable vent 12”x18”, 14”x24”or 18”x24” | Each | $ | ||
| 105 | Install extra-large gable vent 24”x30” | Each | $ | ||
| 106 | Install metal roof vent R-50 | Each | $ | ||
| 107 | Install metal roof vent R-49 | Each | $ | ||
| 108 | Install roof vent R-92 | Each | $ | ||
| 109 | Re-Screen existing roof vent | $ | |||
| 110 | Install Water Pipe Insulation (when not insulating) | LF. | $ | ||
| 111 | Twine existing floor insulation (when not insulating) | Sq.Ft. | $ | ||
| 112 | Center twine floor insulation | LF. | $ | ||
| 113 | Install new metal 6”x16” or 8”x16” foundation vents | Each | $ | ||
| 114 | Remove existing and install new 6”x16” or 8”x16” foundation vents. | Each | $ | ||
| 115 | Rescreen existing damaged foundation vents | Each | $ | ||
| 116 | Removal and proper disposal of existing insulation | Sq.Ft. | $ | ||
| 117 | Labor only- to install floor insulation on irregular joist spacing | Sq.Ft. | $ | ||
| 118 | Labor only- to install floor insulation where clearance is less than 18” | Sq.Ft. | $ | ||
| 119 | Install permeable air barrier | Sq.Ft. | $ | ||
| 120 | Seal off existing interior crawlspace access and install new approx. 20”x30” | Each | $ | ||
| 121 | Cut in and install new interior crawlspace access approx. 20”x30” | Each | $ | ||
| 122 | Seal off existing exterior crawlspace access and install new approx. 20”x30” | Each | $ | ||
| 123 | Cut in and install new exterior crawlspace access approx. 20”x30” | Each | $ | ||
| 124 | Install R-11 unfaced fiberglass batt insulation to existing insulation | Sq.Ft. | $ | ||
| 125 | Install R-15 unfaced fiberglass batt insulation | Sq.Ft. | $ | ||
| 126 | Install R-25 faced fiberglass batt insulation | Sq.Ft. | $ | ||
| 127 | Install R-30 faced fiberglass batt insulation | Sq.Ft. | $ | ||
| 128 | Install bib’s blown in fiberglass insulation R-25 (BIF or equivalent blown in insulation) Site built house. | Sq.Ft. | $ | ||
| 129 | Install bib’s blown in fiberglass insulation R-30 (BIF or equivalent blown in insulation) Site built house. | Sq.Ft. | $ | ||
| 130 | Insulate garage ceiling cavity blown in fiberglass insulation 2”x4”– 2”x6” | Sq.Ft. | $ | ||
| 131 | Insulate garage ceiling cavity blown in fiberglass insulation 2”x8” – 2”x12” | Sq.Ft. | $ | ||
| 132 | Install up to R-30 fiberglass batt insulation to bump-out and cover with treated wood | Sq.Ft. | $ | ||
| 133 | Block and blow up to R-30 closed bump-out | Sq.Ft. | $ | ||
| 134 | Install insulation blocks; rim joist/rakes/knee wall/pony wall | LF. | $ | ||
| 135 | Install R-11 Un-faced fiberglass batt to existing insulation in Knee wall | Sq.Ft. | $ | ||
| 136 | Install R-21 faced fiberglass insulation to 2”x6” knee/pony wall insulation | Sq.Ft. | $ | ||
| 137 | Install Tyvek/FSK or equivalent | Sq.Ft. | $ | ||
| 138 | Twine only (when not insulating) | Sq.Ft. | $ | ||
| 139 | Install R-13 blown in fiberglass insulation bib’s 2”x4” – 2”x6” framed cavity | Sq.Ft. | $ | ||
| 140 | Install high density R-13 cellulose insulation in 2”x4” framed cavity | Sq.Ft. | $ | ||
| 141 | Install high density R-25 cellulose insulation in 2”x6” framed cavity | Sq.Ft. | $ | ||
| 142 | Install cellulose insulation not high density 2”X4” framed cavity | Sq.Ft. | $ | ||
| 143 | Install cellulose insulation not high density 2”x6” framed cavity | Sq.Ft. | $ | ||
| 144 | Install high density cellulose insulation in 2”x4” in cavity with existing insulation | Sq.Ft. | $ | ||
| 145 | Install high density cellulose insulation in 2”x6” in cavity with existing insulation | Sq.Ft. | $ | ||
| 146 | Install high density R-13 fiberglass insulation in 2”x4” framed cavity | Sq.Ft. | $ | ||
| 147 | Labor only - Remove and reinstall existing shake siding | LF. | $ | ||
| 148 | Labor only - Remove and reinstall existing wood siding | LF. | $ | ||
| 149 | Labor only - Remove and reinstall existing vinyl siding | LF. | $ | ||
| 150 | Labor only - Remove and reinstall existing aluminum/metal siding | LF. | $ | ||
| 151 | Labor only - Remove and reinstall existing asphalt siding | LF. | $ | ||
| 152 | Labor only - Drill wood siding that cannot be removed | LF. | $ | ||
| 153 | Labor only - Drill stucco siding | LF. | $ | ||
| 154 | Labor only - Drill interior walls | LF. | $ | ||
| 155 | Remove existing door and Install new 6 panel min R-7 door dual bored | Each | $ | ||
| 156 | Install new keyed alike lockset and dead bolt | Each | $ | ||
| 157 | Install peephole | Each | $ | ||
| 158 | Duct seal entire heating supply and cold air return system | Per System | $ | ||
| 159 | Seal all supply and return boots at registers - when not sealing entire system | Each | $ | ||
| 160 | Seal supply and return plenum in garage - when not sealing entire system | Both | $ | ||
| 161 | Seal supply/return plenum in crawlspace - when not sealing entire system | Each | $ | ||
| 162 | Seal supply/return plenum in attic - when not sealing entire system | Each | $ | ||
| 163 | Seal bare metal/connections on flex duct | Each | $ | ||
| 164 | Insulate ducts using R-11 vinyl wrap insulation | Sq.Ft. | $ | ||
| 165 | Insulate ducts using R-19 vinyl wrap insulation | Sq.Ft. | $ | ||
| 166 | Insulate supply/return plenum in garage R-11 vinyl wrap insulation | Sq.Ft. | $ | ||
| 167 | Insulate supply/return plenum in crawlspace R-11 vinyl wrap insulation | Sq.Ft. | $ | ||
| 168 | Insulate bare metal/connections on flex duct R-11 | Sq.Ft. | $ | ||
| 169 | Insulate bare metal/connections on flex duct R-19 | Sq.Ft. | $ | ||
| 170 | Removal and proper disposal of existing insulation and install new R-11 vinyl wrap insulation | Sq.Ft. | $ | ||
| 171 | Removal and proper disposal of existing insulation and install new R-19 vinyl wrap insulation | Sq.Ft. | $ | ||
| 172 | Add ducting to existing system and seal – to include boots 6”, 7” or 8” | LF. | $ | ||
| 173 | Add ducting to existing system and seal – to include boots 10”, 12” or 14” | LF. | $ | ||
| 174 | Remove and replace existing flex ducting and replace with rigid metal ducting 6”, 7”or 8” | LF. | $ | ||
| 175 | Remove and replace existing flex ducting and replace with rigid metal ducting 10”, 12” or 14” | LF. | $ | ||
| 176 | Shorten existing flex duct run | Each | $ | ||
| 177 | Install 1 1/2” mesh strapping to support flex ducting | Each | $ | ||
| 178 | Install ½” 18 gauge metal straps to support metal ducting | each | $ | ||
| 179 | Install cold air return filter grille with filter to return 16”x 20”, 20”x20”or 20”x24” | Each | $ | ||
| 180 | Install cold air grille to return16”x 20”, 20”x20”or 20”x24” | Each | $ | ||
| 181 | Expose floored over register boots and install new floor register | Each | $ | ||
| 182 | Install metal supply register | Each | $ | ||
| 183 | Blower door directed air sealing - price per 100 cfm reduction. | Per 100 CFM | $ | ||
| 184 | Air sealing with 2 part foam system | Sq.Ft. | $ | ||
| 185 | Sheetrock patching | Sq.Ft. | $ | ||
| 186 | Seal interior plumbing penetrations when not assigned to a major measure if opening is over 3 sq.ft. | Each | $ | ||
| 187 | Replace broken single pane glass | Sq.Ft. | $ | ||
| 188 | Replace broken IGU | Sq.Ft. | $ | ||
| 189 | Install door weatherstrip kit | Each | $ | ||
| 190 | Install new snap bead vinyl weatherstrip | Each | $ | ||
| 191 | Install foam weatherstrip tape | Each | $ | ||
| 192 | Install new door threshold and door shoe | Each | $ | ||
| 193 | Install new door sweep | Each | $ | ||
| 194 | Adjust existing door | Each | $ | ||
| 195 | Remove non IC rated recessed lights and replace with new IC rated unit | Each | $ | ||
| 196 | Repair and seal floor patch (when insulation is not installed) | Sq,Ft. | $ | ||
| 197 | Eliminate blend air duct from furnace | Each | $ | ||
| 198 | Insulate ceiling cavity from interior 6” - 10” to include 1”x6” MDF sealed | Sq.Ft. | $ | ||
| 199 | Insulate ceiling cavity from interior 10” - 14” to include 1”x6” MDF sealed | Sq.Ft. | $ | ||
| 200 | Remove and replace EPDM only | Sq.Ft. | $ | ||
| 201 | Install EPDM system using 1” R-5 – R-7 insulation board, insulate ceiling cavity 10”-14” to an R-26 to R-38 | Sq.Ft. | $ | ||
| 202 | Install EPDM system using 2” R-10 – R-14 insulation board, insulate ceiling cavity 7”- 11” to an R-19 to R-30 | Sq.Ft. | $ | ||
| 203 | Install EPDM system using 3” R-15 – R-21 insulation board and insulate ceiling cavity 7”- 11” to an R-19 to R-30 | Sq.Ft. | $ | ||
| 204 | Install EPDM system using 3” R-15 – R-21 insulation board 6” cavity with NO blown in insulation | Sq.Ft. | $ | ||
| 205 | Install EPDM system using 4” R-20 – R-28 insulation board 6” or less cavity with NO blown in insulation | Sq.Ft. | $ | ||
| 206 | Insulate ceiling cavity through the roof vents on 3-tab roof system R-19 to –R-25 | Sq.Ft. | $ | ||
| 207 | Insulate ceiling cavity through the roof vents on 3-tab roof system R-26 to R-30 | Sq.Ft. | $ | ||
| 208 | Insulate ceiling cavity through the existing roof vent openings on 3-tab roof system R-31 to R-38 | Sq.Ft. | $ | ||
| 209 | Cut into roof to access ceiling to insulate and install new R-49 to R-92 roof vent | Each | $ | ||
| 210 | Install new R-49 to R-92 roof vent | Each | $ | ||
| 211 | Blown in fiberglass insulation in soft belly 6” or less to include belly patching | Sq.Ft. | $ | ||
| 212 | Blown in fiberglass insulation in soft drop belly 6” to 10” to include belly patching | Sq.Ft. | $ | ||
| 213 | Blown in fiberglass insulation in hard belly 6” or less to include belly patching | Sq.Ft. | $ | ||
| 214 | Blown in fiberglass insulation in hard belly 6” to 10” to include belly patching | Sq.Ft. | $ | ||
| 215 | R-25 blown in fiberglass insulation with addition of rodent barrier and twine where none exists | Sq.Ft. | $ | ||
| 216 | R-25 fiberglass batt insulation and twine | Sq.Ft. | $ | ||
| 217 | Install new permeable air barrier | Sq.Ft. | $ | ||
| 218 | Twine to support 10” or more soft drop belly | Sq.Ft. | $ | ||
| 219 | Patch, seal and twine holes in belly material in excess of 9 sq.ft. | Sq.Ft. | $ | ||
| 220 | Replace metal skirting | LF. | $ | ||
| 221 | Replace wood skirting | LF. | $ | ||
| 222 | Remove existing and install new 6”x16” skirting vents | Each | $ | ||
| 223 | Cut in and install new metal 6”x16” skirting vents | Each | $ | ||
| 224 | Extend condensate line to the outside | LF. | $ | ||
| 225 | Add new access to skirting | Each | $ | ||
| 226 | Duct seal entire heating supply and cold air return system including plenum in single wide | Per System | $ | ||
| 227 | Duct seal entire heating supply and cold air return system including plenum in double wide | Per System | $ | ||
| 228 | Cut in and seal plenum only | Each | $ | ||
| 229 | Register boot repair | Each | $ | ||
| 230 | Duct sealing/repair branch ducts | LF. | $ | ||
| 231 | Remove existing branch duct and replace with rigid metal ducting up to 7” | LF. | $ | ||
| 232 | Add new rigid metal branch duct to include; ducting, boot and floor register | LF. | $ | ||
| 233 | Cut in and install new rigid metal inline duct boot to include; new floor register | Ea. | $ | ||
| 234 | Remove existing crossover duct and install new rigid metal duct to include sealing plenum, ducting and supports | Sq.Ft. | $ | ||
| 235 | Install cold air return filter grille with filter to return 16”x20”, 20”x20” or 20”x24” | Each | $ | ||
| 236 | Install cold air grille to return16”x 20”, 20”x20”or 20”x24” | Each | $ | ||
| 237 | Install R-11 vinyl faced insulation | Sq.Ft. | $ | ||
| 238 | Install rigid foam board for support | LF. | $ | ||
| 239 | Support HVAC ducts – when no duct work called for | Each | $ | ||
| 240 | Install new vinyl replacement window to include interior and exterior air sealing | Sq.Ft. | $ | ||
| 241 | Add safety glass to a replacement window | Sq.Ft. | $ | ||
| 242 | Install metal drip edge | LF. | $ | ||
| 243 | Remove existing door and install new 6-panel minimum R-7 door with dual bored keyed alike lockset and deadbolt | Each | $ | ||
| 244 | Remove existing door and install new minimum R-7 metal mobile door with dual bored keyed alike lockset and deadbolt | Each | $ | ||
| 245 | Install new keyed alike lockset and deadbolt | Each | $ | ||
| 246 | Install peephole | Each | $ | ||
| 247 | Install single lockset | Each | $ | ||
| 248 | Insulate Water Heater Tank with R-11 vinyl faced insulation | Each | $ | ||
| 249 | Insulate water heater cavity to R-11 to include infiltration | Each | $ | ||
| 250 | Insulate water heater cavity door to R-11 fiberglass or rigid insulation board to include infiltration | Each | $ | ||
| 251 | Insulate plumbing pipe at hot water tank with R-11– when not assigned to a measure | LF. | $ | ||
| 252 | Repair water heater cavity door | Each | $ | ||
| 253 | Remove existing water heater cavity door and install new R-7 metal mobile door with single lock | Sq.Ft. | $ | ||
| 254 | Install pressure relief tube and extend to crawlspace | Each | $ | ||
| 255 | Remove and replace existing electric water heater tank to include earthquake strap and drip pan | Each | $ | ||
| 256 | Remove and replace existing Gas water heater tank to include earthquake strap and drip pan | Each | $ | ||
| 257 | Install high and low venting to gas water heater cavity door up to 16”x6” | Set | $ | ||
| 258 | Install combustion air vent to water heater cavity floor | Each | $ | ||
| 259 | Labor only (per hour) | Each | $ | ||
| Substitutions Requested | $ | ||||
| $ | |||||
| $ | |||||
| $ | |||||
| $ | |||||
| SUBTOTAL $ | $ - 0 |
| INVOICE BILLED PER MAJOR MEASURES |
| *Turn in Invoices per line items below* |
MAJOR MEASURES ITEM #'S REFERENCING MAJOR MEASURE'S COST PER MEASURE
(Authorized Weatherized Staff Approval Signature) (Contractor Work Order Acceptance Signature)
| Date | Date |
| Above information is not an invoice and in the event that a Work Order requires measures that are not included in existing pricing, or requires measures that vary from standard pricing specifications, the County may, at the County’s sole discretion, request specific pricing from Contractor. Such action will be for this specific Work Order only. |
Reviewed by Authorized WX Staff - (initials)
Extension of Time: An extension of time on this Project may be made by the County only upon written request from the Contractor. Such request shall state the date to which the extension is desired and shall describe the conditions which have occurred to prevent the Contractor from completing within the specified time 45 day completion date.
If the Contractor fails to achieve Substantial Completion as specified above and has not requested an extension, then the Contractor and County agree that it would be extremely difficult to ascertain the damages incurred by the County and Worksite Owner for the Contractor’s failure. Therefore, the County and the Contractor agree that in lieu of actual damages for delay, the Contractor shall reimburse County a stipulated sum as identified in the below table. The Contractor further agrees the stipulated sum is not a penalty.
&"-,Bold"&24&K02-042Clackamas County Weatherization &11 104 11th Street Oregon City, OR 97045 Phone: (503) 650-3335 Fax: (503) 650-3336 Email: weatherization@clackamas.us &"-,Bold"&34&K02-042Work Order
&"Arial,Regular"&12&K000000If you have any questions about this work order, please contact&K01+000 &"Arial,Bold"&K08-022April Richey (503) 650-3335 or email weatherization@clackamas.us
X image1.png
File details come from the government source that posted it. Updated .