This is a Project Parameters attachment for a Crisis Services Center (CSC) facility design and construction project for the Grand Rapids Community Services Board (GRCSB) in Virginia. The document outlines comprehensive guidelines for the design, construction, and execution of a new behavioral health crisis facility. GRCSB will remain in existing facilities during construction and will relocate upon project completion. The offeror is responsible for all design services, obtaining necessary approvals from GRCSB and local authorities, and coordinating the installation of furniture, fixtures, and equipment during final construction stages to avoid separate post-construction phases. Speed of execution is emphasized as critical to delivering healthcare services to the community.

Cost breakdown is required according to Construction Specification Institution (CSI) standards, including separate line items for building work, demolition/sitework, general conditions, design, insurance, contingencies, overhead and profit fees, and bonds. The project prioritizes long-term value, maintenance ease, and reliability alongside initial cost considerations. Design specifications mandate ligature-resistant fixtures, motion-sensor plumbing fixtures, durable hard-surface flooring, quartz or solid-surface counters, acoustic isolation for privacy, dimming lighting capabilities with glare minimization, and materials that prevent harm and self-injury. The facility must include a full-capacity natural gas generator (with propane as alternative), low-voltage telecommunications infrastructure, secure outdoor spaces, separate public/staff/CITAC entrances with a sally port, efficient water and energy use, high indoor air quality with contamination-reducing air filtration, abundant natural light, and coordination with GRCSB's preferred vendors for door access control and CCTV security systems. Site work must address demolition, grading, paving, stormwater management with quality and quantity treatment, utility connections, and landscaping to obtain site plan approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B – CSC Project Parameters

Crisis Services Center

Project Parameters

Overall Project Guidelines

1. Speed of Execution – Time is of the essence in delivering the project, and the goal is to expedite the delivery of these important healthcare services to the community.

2. Costs – GRCSB seeks the best facility for the best value, understanding that this is a long-term facility that must serve GRCSB for years to come, and therefore long-term value, ease of maintenance, and reliability are just as important as initial cost. The offerors should provide a cost breakdown for the project described herein, by Construction

Specification Institution (CSI) standards, and further organized as per below:

a. Cost of work - building

b. Cost of work – demolition/sitework

c. General conditions/requirements

d. Design

e. Insurance

f. Design contingency/contractor construction contingency (if needed, please specify proposed purpose and usage)

g. Overhead and Profit Fee

h. Bonds

3. Efficiency & Flexibility – GRCSB seeks to construct a facility that will be functionally efficient, while providing flexibility to respond to changing needs as they may emerge in the future. It is also important to GRCSB that those responding to this solicitation pay attention to the details – the things that make the difference between the facility functioning really well vs. acceptably.

4. Coordination with the GRCSB – GRCSB seeks a high level of cooperation, communication, and coordination with the offeror during the course of the project to assure smooth execution. GRCSB will be providing certain equipment, systems, components, and elements of the work, and will need to know when these things are required to avoid impacting the project schedule. Coordination will also be required during design and construction to assure that these items are integrated smoothly with the work to be done by the offeror.

5. Project Design – The offeror will be responsible for the design of the project. The offeror will also be responsible for obtaining approval of the design by GRCSB and approval of the building and site design by the local authority having jurisdiction, and all work required to satisfy the requirements of local and state authorities.

Project Sequence Guidelines

1. GRCSB will remain in existing facilities until project completion and will relocate to the new CSC when the project is ready for occupancy.

2. The Offeror will coordinate with GRCSB to allow installation of furniture, fixtures, and equipment during the final stages of the project, so that this can be done without a separate post-construction phase.

3. As indicated above, speed is of the essence in the construction of these facilities.

GRCSB Responsibilities

1. GRCSB will provide a Project Manager who will be the official point of contact, and

GRCSB personnel will be readily available for consultation during the course of design and construction.

Design Considerations

1. See overall project guidelines above and program requirements Attachment A for the

CSC. Note that there is some flexibility in the programmed space sizes, as long as program requirements are met, and accommodation is made for future growth.

2. It is essential that the building be designed to comply with all regulatory requirements for a facility of this type, including ligature-resistant fixtures, etc.

3. External and internal materials must limit the ability for someone to use them to harm themselves or someone else – for instance, vinyl siding that can be easily removed from the building could be used in a hazardous manner.

4. Design should be efficient, in terms of water and energy use, including being designed to provide a high level of indoor air quality, including contamination-reducing air filtration.

5. GRCSB desires an abundance of natural light, but with materials that are safe.

6. Provide a generator sized to support the full function of the complete facility. A natural gas generator is preferred; however, if natural gas is not available in the area, anticipate providing propane.

7. The Offeror shall coordinate with GRCSB's preferred vendor for the installation and integration of the door access control system, including card readers, and the CCTV security camera system.

8. Provide all low-voltage infrastructure for telecommunications and audio/visual systems throughout the building. This shall include all required raceways, cabling, backboxes, pathways, and power necessary to support these systems. GRCSB will be responsible for furnishing, installing, and configuring the network switches.

9. Toilet and lavatory plumbing fixtures should operate with motion sensors.

10. All spaces should have appropriate acoustical isolation to provide privacy appropriate for behavioral health services.

11. In addition to acoustical isolation, spaces should allow for good sight lines in the clinical areas but protect confidentiality in the public spaces (i.e., waiting rooms separate from consumer evaluation/check-in spaces).

12. Finishes should include durable, low-maintenance hard surface flooring in all areas, with the exception that administrative areas may utilize high-quality carpet tile.

13. Lighting to minimize glare (this is an important aspect, given the medications some consumers take) and, at a minimum, provide dimming capability. Individualized lighting for consumer residents, including dimming and color tone, is ideal.

14. Counters throughout the facility should be either quartz or solid surface.

15. Design should include toe pulls for doors.

16. Several functions (meds, lab, nutrition, etc.) are shared between the clinical spaces in the program. To the extent possible, those should be secured swing spaces to improve efficiencies.

17. Provide design and construction for all necessary site features to receive a Site Plan approval, including but not limited to demolition, erosion & sedimentation control, grading, paving, hardscape improvements, landscaping, site lighting, power and water service connections from building to existing lines, sanitary service connections from building to existing lines, storm drainage and connections to existing lines including requirements for quality and quantity treatment of stormwater and lead the coordination and accommodations into building for franchise utilities, telecommunications, gas, and power.

18. There should be a secure place for people to spend time outside, whether that is eating, sports activities (i.e. basketball) or going for a walk. It will be a smoke-free campus.

19. The building should have a public entrance, a staff entrance, and a CITAC entrance (with a Sally Port).