Attachment A.2 – Prototype Design and Layout.pdf

PDF 5 MB Posted

Attached to
PPEA for GRCSB
Solicitation number
DBB-123705
Issued by
Dinwiddie County, Virginia

About this file

This is a prototype design and layout document for a Crisis Receiving Center project developed by the Virginia Department of Behavioral Health and Developmental Services (VDBHDS) in collaboration with architectural and engineering firms ZMM Architects (based in West Charleston, WVA) and engineers based in Blacksburg, VA. The document provides construction drawings and environmental safety risk assessment specifications for a crisis stabilization facility containing 12 beds, organized across multiple functional areas including client rooms, assessment areas, counseling rooms, intake facilities, medical rooms, and administrative spaces. The design incorporates a five-level risk assessment framework that categorizes areas based on client supervision requirements and safety considerations, ranging from Level I areas where clients are not allowed to Level V areas designated for newly admitted clients presenting unknown risks or highly agitated conditions, such as seclusion and admission rooms.

The specifications establish stringent security and safety requirements applicable to Level III, IV, and V areas, mandating the use of security fasteners (pinned Torx or equivalent), polycarbonate security glazing, institutional-grade sprinkler heads, hospital-type electrical outlets, and ligature-resistant fixtures. Construction requirements include sealing all wall-mounted accessories with security sealant, installing plastic wall protection panels at full height in designated spaces, using stainless steel corner guards, and maintaining gap tolerances not exceeding 3/32 inches. All fasteners, electrical components, and wall-mounted objects must be security-focused to prevent misuse, and materials proposed as substitutions must demonstrate approval from the New York State Office of Mental Health or similar agencies. The document reflects institutional design standards for behavioral health crisis care facilities, with emphasis on client and staff safety through environmental design measures and material specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

EF

REF

R

EF

LEVEL V - AREAS WHERE STAFF INTERACT WITH NEWLY ADMITTED CLIENTS WHO PRESENT POTENTIAL UNKNOWN RISKS OR WHERE CLIENTS MAY BE IN HIGHLY AGITATED CONDITION. DUE TO THESE CONDITIONS, THESE AREAS FALL OUTSIDE THE PARAMETERS OF THE RISK MAP AND REQUIRE SPECIAL CONSIDERATIONS FOR CLIENT (AND STAFF) SAFETY. SUCH

AREAS INCLUDE SECLUSION ROOMS AND ADMISSION ROOMS.

LEVEL IV - AREAS WHERE CLIENTS SPEND A GREAT DEAL OF TIME ALONE WITH MINIMAL OR NO SUPERVISION, SUCH AS

CLIENT ROOMS (SEMI-PRIVATE AND PRIVATE) AND CLIENT TOILETS.

LEVEL III - AREAS THAT ARE NOT BEHIND SELF-CLOSING AND SELF-LOCKING DOORS WHERE CLIENTS MAY SPEND TIME WITH MINIMAL SUPERVISION SUCH AS LOUNGES, DAY ROOMS AND CORRIDORS WHERE STAFF ARE NOT REGULARLY

PRESENT. OPEN NURSE STATIONS SHOULD BE CONSIDERED UNDER THIS LEVEL.

LEVEL II - AREAS BEHIND SELF-CLOSING AND SELF-LOCKING DOORS WHERE CLIENTS ARE HIGHLY SUPERVISED AND NOT LEFT ALONE SUCH AS COUNSELING ROOMS, ACTIVITY ROOMS, INTERVIEW ROOMS, GROUP ROOMS AS WELL AS CORRIDORS THAT DO NOT CONTAIN OBJECTS THAT CLIENTS CAN USE FOR CLIMBING AND WHERE STAFF ARE

REGULARLY PRESENT.

LEVEL I - AREAS WHERE CLIENTS ARE NOT ALLOWED.

OFFICE

RECLINER

AREA

OFFICE

CLIENT

STOR

LAUNDRY

LARGE

CONFERENCE

TV AREA /

LOUNGE

NURSE

STATION

TOILET /

SHOWER

ASSESSMENT

LAUNDRY

300JAN

OFFICE

MOBILE

CRISIS

CRISIS

NURSE

NURSE

OFFICE

611STAFF

BREAK

ROOM

VEST

OFFICE

CC

CC

OFFICE

CC

OFFICE

OFFICE

STOR

SALLYPORT

OUTDOOR

AREA

OUTDOOR

AREA

ENTRY

VEST

LOBBY /

WAITING

POLICE

OFFICER

LARGE

GROUP

ROOM

COURTROOM

RES VEST

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

1 PERSON

BEDROOM

MECH

ELEC

IT

409 DINING

KITCHEN

OFFICE

OFFICE

OFFICE

STOR

VEST

TOILET /

SHOWER

TOILET /

SHOWER

TOILET /

SHOWER

TOILET /

SHOWER

TOILET

MED ROOM

INTAKE

TOILET /

SHOWER

COUNSELOR

INTERVIEW

FAMILY

OFFICE

OFFICE

OFFICE

LAB

PASSPORT

NURSE

TOILET

EXAM

EXAM /

VITALS

TOILET

TOILET

602 CUSTODIAL

OBSERVATION

STOR

CITAC

INTERVIEW

MED

CLOSET

611A

WORK

ROOM

609MED

CLOSET

607A

OFFICE

OFFICER

STOR

STOR

RECEPTION

STOR

VEST

INTERVIEW

STAFF

TOILET

CORRIDOR

CITAC

OFFICE

CITAC

CORR

MAIN

CORRIDOR

NURSE

CORRIDOR

TOILET /

SHOWER

REAR

CORRIDOR

ADMIN

CORR

OFFICE

CORR

CORR

CORR

STOR

121 SMALL

GROUP

ROOM

OFFICE

STOR

100A

NURSE

STATION

INTAKE

CITAC

STOR

202A

STOR

STAFF

TOILET

STOR

322A

WORK

ROOM

TOILET /

SHOWER

TOILET /

SHOWER

TOILET /

SHOWER

CL

STOR

QUIET

QUIET

QUIET

STOR

528A

STOR

JAN

406A

CORR

CLO

STOR

MATCH LINE AREA 'B'

MATCH LINE AREA 'A'

M

AT

C H L

IN

E

AR

EA

'B

M

AT

C H L

IN

E

AR

EA

'C

MATCH LINE AREA 'C'

MATCH LINE AREA 'A'

AREA 'A'

AREA 'C' AREA 'B'

CHECKED

DATE

COMM. NO.

DRAWN

ARCHITECTS

ENGINEERS

222 Lee Street, West Charleston, WVA 25302 Phone: 304.342.0159 Fax: 304.345.8144 www.zmm.com

1116 South Main Street Blacksburg, VA 24060 Phone: 540.552.2151

/3 /2 2:

:2

PM

C :\U se rs \c m ar tin \D oc um en ts \C ris is C en te r P ro to ty pe

AR

C H _C M

AR

TI

N

ZM

M .rv t

G103

2024092

OCT 30, 2025

ENVIRONMENTAL

SAFETY RISK

ASSESSMENT

LEVEL OF

CONCERN PLAN

DBB

CPM

AHW

PC

0- B5 0-

C R

IS

IS

C

EN

TE

R P R O

TO

TY

PE

B U

IL

D

IN

G

VI

R G

IN

IA

D

EP

AR

TM

EN

T O F

BE

H

AV

IO

R

AL

H

EA

LT

H A N D

D

EV

EL

O

PM

EN

TA

L

SE

R

VI

C

ES

C O N

ST

R U C

TI

O N D R

AW

IN

G S

3/32" = 1'-0"

ENVIRONMENTAL SAFETY AND RISK ASSESSMENT LEVEL OF CONCERN PLAN

1" = 50'-0"

KEY PLAN

1.

2.

3.

4.

5.

GENERAL NOTES FOR WORK IN LEVEL III, IV, AND V AREAS

ALL FASTENERS EXPOSED TO VIEW SHALL BE PINNED TORX SECURITY FASTENERS, OR EQUIVALENT SECURITY FASTENERS. WHERE PATENTED SECURITY FASTENERS SYSTEMS ARE UTILITIZED, PROVIDE MINIMUM OF (4) TOOLS, OR MORE AS INDICATED ELSEWHERE IN THE DOCUMENTS, FOR EACH FASTENER SIZE AND TYPE. THE USE OF PHILIPS OR

FLATHEAD SCREWS, AND HEXAGONAL HEAD BOLTS IS STRICTLY PROHIBITED.

PERIMETERS OF ALL WALL MOUNTED ACCESSORIES, SIGNS, DEVICES, TRIMS, SHELVES, ETC. SHALL BE SEALED WITH SECURITY SEALANT. SECURITY SEALANTS SHALL BE INSTALLED IN A TOOLED, OR TOOLED LOOKING MANNER. UNSIGHTLY

ACCUMULATIONS OF SEALANTS SHALL BE REMOVED AND REPLACED.

ALL WALL OUTSIDE CORNERS SHALL BE COVERED FULL HEIGHT WITH STAINLESS STEEL CORNER GUARDS, FACE

FASTENED WITH SECURITY FASTENERS, AND PERIMETERS SEALED WITH SECURITY SEALANT.

AT ALL PLASTIC WALL PROTECTION INSTALLATIONS, MANUFACTURER'S TRIMS ARE PROHIBITED. JOINTS SHALL BE BUTTED AND SEALED WITH COLOR MATCHING SECURITY SEALANT. FACE FASTENING IS NOT PERMITED. PLASTIC WALL PROTECTION PANELS SHALL BE INSTALLED AT ALL GYPSUM WALL BOARD ASSEMBLIES IN LEVEL III-IV SPACES, FULL HEIGHT. WHERE PANEL PATTERNS ARE NOT INDICATED, COORDINATE WITH THE ARCHITECT PRIOR TO INSTALLATION TO

CONFIRM DESIRED PANEL LAYOUTS.

THE CONTRACTOR SHALL REMOVE ALL EXCESS MATERIALS FROM THE AREA OF WORK. AT THE COMPLETION OF THE WORK, ALL SCRAPS AND UNUSED MATERIAL SHALL BE REMOVED FROM CONCEALED CAVITIES, ABOVE CEILING SPACES, AND ACCESSIBLE SPACES.

9. GLAZING SHALL BE POLYCARBONATE SECURITY GLAZING AT ALL LOCATIONS. ADDITIONAL GLAZING REQUIREMENTS MAY APPLY.

TEMPERED, PLATE, OR OTHER NON-SECURITY GLAZINGS ARE NOT PERMITTED IN LEVEL III-IV SPACES.

10. WALL BASE SHALL BE SEALED AT THE TOP EDGE WITH SECURITY SEALANT, TYP.

11. MATERIALS AND SYSTEMS PROPOSED AS SUBSTITUTIONS OR EQUIVALENTS TO THE SPECIFIED PRODUCTS SHALL HAVE BEEN TESTED AND APPROVED FOR USE BY THE NEW YORK STATE OFFICE OF MENTAL HEALTH, OR SIMILAR AGENCY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING DOCUMENTATION OF TESTING AND APPROVAL WITH THE SUBMITTAL OF

ALTERNATE OR SUBSTITUTE PRODUCTS.

12. INSTALLED MATERIALS SHALL BE SECURELY FASTENED, AND TIGHTLY ABUTTED. GAPS IN EXCESS OF 3/32", OR LESS WHERE INDICATED, SHALL NOT BE PERMITTED. GAPS SHALL BE SEALED WITH SECURITY SEALANT OR OTHER APPROVED MATERIAL.

13. ACCESS DOORS SHALL HAVE CONCEALED FLANGES AND BE SECURED WITH KEYS OR SECURITY FASTENERS.

14. SPRINKLER HEADS SHALL BE INSTITUTIONAL TYPE.

15. ELECTRICAL OUTLETS SHALL BE HOSPITAL TYPE.

16. FIRE ALARM DEVICES, THERMOSTATS, WALL MOUNTED SENSORS, AND OTHER WALL MOUNTED OBJECTS SHALL BE LIGATURE RESISTANT IN NATURE, OR BE COVERED WITH "TIPIT"S OR VANDAL RESISTANT/LIGATURE RESISTANT COVERS.

17. EXPOSED PIPING OR TRAPS SHALL NOT BE PERMITTED.

18. DOOR CLOSERS SHALL BE INSTALLED ON THE NON-CLIENT SIDE OF DOORS, TYPICAL. PROVIDE ARMS AND ACCESSORIES APPROPRIATE FOR THE INSTALLATION. WHERE SUCH INSTALLATION IS NOT FEASIBLE, CONCEALED CLOSERS SHALL BE USED.

19. STRIKE PLATES SHALL NOT PROJECT MORE THAN 1/8" BEYOND THE FACE OF DOOR FRAMES.

R

EV

IS

IO

N S

N O

D

ES

C R

IP

TI

O N

D A

TE

Note: Crisis Stabilization Unit 12 beds instead of 16.

Attachment A.2 - Prototype Design and Layout

CHECKED

DATE

COMM. NO.

DRAWN

ARCHITECTS

ENGINEERS

222 Lee Street, West Charleston, WVA 25302 Phone: 304.342.0159 Fax: 304.345.8144 www.zmm.com

1116 South Main Street Blacksburg, VA 24060 Phone: 540.552.2151

/3 /2 2:

:2

PM

C :\U se rs \c m ar tin \D oc um en ts \C ris is C en te r P ro to ty pe

AR

C H _C M

AR

TI

N

ZM

M .rv t

G200

2024092

OCT 30, 2025

3D VIEWS

CPM AHW

PC

0- B5 0-

C R

IS

IS

C

EN

TE

R P R O

TO

TY

PE

B U

IL

D

IN

G

VI

R G

IN

IA

D

EP

AR

TM

EN

T O F

BE

H

AV

IO

R

AL

H

EA

LT

H A N D

D

EV

EL

O

PM

EN

TA

L

SE

R

VI

C

ES

C O N

ST

R U C

TI

O N D R

AW

IN

G S

3D VIEW1

3D VIEW2 3D VIEW3

3D VIEW4

R

EV

IS

IO

N S

N O

D

ES

C R

IP

TI

O N

D A

TE

Attachment A.2 - Prototype Design and Layout

VDBHDS_Crisis_Center_Prototype_-_SEALED_SET[1] (1) 3.pdf
VDBHDS_Crisis_Center_Prototype_-_SEALED_SET[1] (1) 4.pdf
VDBHDS_Crisis_Center_Prototype_-_SEALED_SET[1] (1) 5.pdf

File details come from the government source that posted it. Updated .