Attachment B - Pricing Schedule USCGC HAMILTON (WMSL-753).xls
XLS spreadsheet 49 KB Posted
- Attached to
- USCGC HAMILTON DS FY25 FQ4
- Solicitation number
- 70Z08525RLREP0009
About this file
The document is a Pricing Schedule for the United States Coast Guard Cutter (USCGC) HAMILTON dockside availability in Fiscal Year 2025. The solicitation (Number 70Z08525RLREP0009) covers maintenance and repair work to be performed in North Charleston, South Carolina, with an ordering period from the date of award through 14 December 2025. The first task order's performance period is from 14 September 2025 through 14 December 2025.
The pricing schedule includes multiple line items for ship maintenance tasks such as tank cleaning and inspection, machinery room ventilation fan repairs, cargo handling elevator inspection, crane maintenance, and various other technical services. The document provides a detailed breakdown of potential labor rates across different geographic regions, with a composite labor rate of $55 per hour, and assumed G&A and profit factors of 15% and 10% respectively. All current line items in the pricing schedule are listed with $0.00 pricing, suggesting this is a draft or preliminary document awaiting final cost determination.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC HAMILTON (WMSL-418) DOCKSIDE AVAILABILITY FY2025 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (Ballast), Clean and Inspect | JOB | |||
| O-002 | Tanks (Ballast), Preserve (Partial) | JOB | |||
| O-003 | Tanks (Ballast), Preserve 100% | JOB | $0.00 | ||
| D-004 | QAWTD 26x66, Renew | JOB | $0.00 | ||
| D-005 | Watertight Hatches, Renew | JOB | $0.00 | ||
| D-006 | Machinery Room Ventilation Fans, Repair | JOB | $0.00 | ||
| D-007 | Fan Plenums, Inspect Repair and Preserve | JOB | $0.00 | ||
| D-008 | Flex Hose Assemblies (Bow Thruster), Renew | JOB | $0.00 | ||
| D-009 | Cargo Handling Elevator, Annual Inspection and Test, Perform | JOB | $0.00 | ||
| D-010 | Folding Boom Cranes, Biennial Maintenance, Perform | JOB | $0.00 | ||
| D-011 | Side Boat Davit, Renew | JOB | $0.00 | ||
| D-012 | Fire Prevention, Provide | JOB | |||
| D-013 | Aux Seawater Piping, Modify | JOB | |||
| O-0A | Composite Labor Rate | Hour | 0 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price | $0.00 |
&C(11/18/2024) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .