Attachment B Plans~5.pdf

PDF 2 MB Posted

Attached to
I-84: Farewell Bend Chain Up Paving Project
Solicitation number
S-73000-00012503
Issued by
Multnomah County, Oregon

About this file

This is a project plans document prepared by the Oregon Department of Transportation for the I-84: Farewell Bend Chain Up Paving Project located in Malheur County, Oregon. The project encompasses cold plane pavement removal and 4-inch asphalt concrete pavement (ACP) inlay of 12-foot wide chain up areas on both eastbound and westbound lanes of Interstate 84 at milepost markers between 352.01 and 352.73. The base bid includes construction of 4-inch grind/inlay on both the 10-foot eastbound and westbound paved shoulders, extending 0.5 feet into existing widening areas to create clean joints, along with temporary traffic control measures. Additive Alternate A includes adding 2-inch grind/inlay of the existing 10-foot eastbound paved shoulder, while Additive Alternate B includes adding 2-inch grind/inlay of the existing 10-foot westbound paved shoulder. The contract will be awarded to the lowest responsive bidder based on combined totals from the base bid and selected additive alternates. The bid submission deadline is March 20, 2025, with a posting date of February 24, 2025. A prospective disposal site is identified at US Route 30, Milepost 2.95.

The plans document includes standard construction details and specifications referencing Oregon Standard Drawings and Specifications effective December 1, 2024, through May 31, 2025. Technical details encompass freeway section specifications (TM861), asphalt concrete pavement details (TM820), temporary barricade and sign support installations (TM820 and TM821), traffic control device spacing and placement (TM800), and abrupt edge delineation methods. All materials must comply with current Oregon Standard Specifications and be designed in consultation with a registered professional engineer. The project includes comprehensive temporary traffic control requirements including portable changeable message signs, tubular markers, temporary plastic drums, flagger stations, and lighting as detailed in the traffic control plans. The document specifies methods for pavement matching, feathering, and edge detail treatments for inlay surfacing and establishes taper lengths and buffer zones based on posted speed limits of 45 miles per hour or greater for freeway operations.

View the file

Other files

File Type Posted
00012503 Intent To Award.xlsx XLSX spreadsheet
Attachment D Description of Base Bid and Alternates.docx DOCX document
Attachment A Special Provisions~1.pdf PDF
Invitation.To.Bid~9.docx DOCX document
00012503 Preliminary Results.xlsx XLSX spreadsheet
Attachment C Bid Pricing Form~11.xlsx XLSX spreadsheet
Notice of Intent to Award~7.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE NAME

MALHEUR COUNTY

OLD OREGON TRAIL HIGHWAY

PAVING PROJECT

I-84: FAREWELL BEND CHAIN UP

58V-032

Durkee

Huntington

Weiser

Cairo

ONTARIO

Payette

MALHEUR CO.

BAKER CO.

I D A H O

O R E G O N

Z

Z

PLANS FOR PROPOSED PROJECT

ST. HELENS

ASTORIA

TILLAMOOK

MCMINNVILLE

ALBANYNEWPORT

CORVALLIS

HOOD

RIVER

DALLES

THE

MADRAS

PRINEVILLE

BEND

COQUILLE

GRANTS

PASS

Ashland

BURNS

KLAMATH

FALLS

CONDON

MORO

PENDLETON

LA GRANDE

ENTERPRISE

VALE Ontario

PORTLAND

SALEM

MEDFORD

EUGENE

ROSEBURG

Athena

N. Powder

Unity Dayville

Sisters

Juntura

Frenchglen

Burns Jct.

McDermitt

Paisley

La Pine

Crescent

Biggs

Lexington

Hermiston Boardman

Ukiah

Arlington

Malin

Brookings

Coos Bay

Drain

Canyonvil le

Reedsport

Oakridge

Goshen Florence

Lincoln City

Waldport

Home Sweet

Detroit Antelope

Maupin

Forest Grove

Hebo

Cannon Beach

Seaside Rainier

Milton-Freewater

W

26 35 197

39519

3953197

Bonanza

Junction City

BAKER CITY

HEPPNER

Copperfield

Lake Silver

Junction CaveBEACH

GOLD

Orford Port

LAKEVIEW

CANYON

CITY

Day John

CITY

OREGON

HILLSBORO

DALLAS

Redmond

Val ley Jordan

STATE OF OREGON

DEPARTMENT OF TRANSPORTATION

LET'S ALL

WORK TOGETHER

TO MAKE THIS

JOB SAFE

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

IR

S T

S A F E T Y

F

O T

N E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

R_M20002_ts_02.dgn :: Default 1/8/2025 11:44:51 AM hwye53h 1"=100' Scale: Rotation: 0°

ATTENTION:

(503) 232-1987).

The Oregon Utility Notification Center Is

The Center (Note: The Telephone Number For

You May Obtain Copies Of The Rules By Calling

Through OAR 952-001-0090.

Those Rules Are Set Forth In OAR 952-001-0001

By The Oregon Utility Notification Center.

Oregon Law Requires You To Follow Rules Adopted

Title Sheet

DESCRIPTIONSHEET NO.

INDEX OF SHEETS

ADMINISTRATION

FEDERAL HIGHWAY

DIVISION

OREGON

PROJECT NUMBER

NO.

SHEET

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

A01STATE

BEGINNING OF "WB" CHAIN UP

END OF "WB" CHAIN UP

BEGINNING OF "EB" CHAIN UP

END OF "EB" CHAIN UP

T. 15 S., R. 45 E., W.M.

A01

BA02 Incl.

BA01 Thru

Standard Dwg. Nos.

- Tables, Abrupt Edge And PCMS DetailsTM800

- Freeway SectionsTM861

- Asphalt Concrete Pavement (ACP) DetailsRD610

- Temporary BarricadesTM820

- Temporary Sign SupportsTM821

I-84, MP "EB" 352.35

I-84, MP "EB" 352.73

I-84, MP "WB" 352.01

I-84, MP "WB" 352.59

PAVING

OLD OREGON TRAIL HIGHWAY

PAVING PROJECT

I-84: FAREWELL BEND CHAIN UP

FEBRUARY 2025

MALHEUR COUNTY

BA03 Typical Sections (Add-Alt A)

BA04 Typical Sections (Add-Alt B)

Typical Sections (Base Bid)

Bid Option Description

Base Bid

Add-Alt A paved shoulder in order to create a clean joint.

widening areas, extending 0.5' into existing 10' eastbound and westbound 12' wide chain up construction of 4" grind/inlay of both

Includes temporary traffic control and existing 10' paved shoulder to the Base Bid.

Includes adding 2" grind/inlay of eastbound

Add-Alt B existing 10' paved shoulder to the Base Bid.

Includes adding 2" grind/inlay of westbound

PROSPECTIVE DISPOSAL SITE

US30, MP 2.95, Lt.

2025.01.08 16:56:34 -08'00'

2025.01.08 16:58:33 -08'00'

2025.01.08 17:00:46 -08'00'

2025.01.08 17:02:04 -08'00'

RD610

DETAILS

PAVEMENT (ACP)

ASPHALT CONCRETE

R D

.d g n

25-JUL-2017N/A

J U

L

1" in 5'

Feather base course Taper 1" in 5'

AT GRAVEL APPROACHES

METHOD OF FEATHERING ACP PAVEMENT

OR BRIDGE ENDS WHEN NOT OVERLAYING THE BRIDGE

ACP PAVEMENT MATCH AT PROJECT ENDS

METHOD OF MATCHING EXTG. ACP INLAY SURFACING

TABLE 1

METHOD A *

METHOD B *

TAPER LENGTHS

ACP wearing course

(When present)

Feather ACP base course

Extg. pvmt.

See "EDGE DETAIL"

Extg. pvmt.

wearing course thkn.

ACP unfeathered

See project plans for method.

Taper (See Table 1)

Cold plane pvmt. removal

Taper (See Table 1)

Cold plane pvmt. removal

Posted Speed Taper Length

1" per 50' 45 mph

1" per 100'> 45 mph

See "EDGE DETAIL"

Extg. pvmt.

wearing course thkn.

ACP unfeathered top ACP base course

Construct non-feathered

(See "EDGE DETAIL")

Top of ACP base, Extg. pvmt.

ACP wearing course

(When present)

Feather ACP base course

Extg. gravel surfacewearing course thkn.

ACP unfeathered

Thkn. - Var. (2" to 0)

Aggr. base

Thkn. - Var. (2" to 0)

(When present)

Asph. conc. base course

(Thkn. as shown on plans)

ACP wearing course

Extg. pvmt.

Thkn. - 2"

(When present)

ACP base course e x tg p v m t.

E d g e o f

See "EDGE DETAIL"

ACP wearing courseExtg. pvmt.

See "EDGE DETAIL"

Extg. A.C. pvmt.

Cold plane pvmt. removal

(Inlay to extg. asphalt conc. pvmt.)

not acceptable

Mill edge as shown

Nom. depth

Sawcut & seal

EDGE DETAIL

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

TM800

PCMS DETAILS

TABLES, ABRUPT EDGE AND

T M

.d g n

12-JUL-2024N/A

J U

L

Freeway

Use aggregate wedge when abrupt edge is 2 inches or greater.

four feet wide protect longitudinal abrupt edge as shown.

When paved shoulders adjacent to excavations are less than

NOTES:

shoulder, as far as practical.

Place cart / generator / power supply off of the on 10' spacing.

Use six tubular markers in shoulder taper outside shoulder, where practical.

Install Flagger Station Lighting beyond the

2" or GreaterExtg. pavement aggregate base rock

Shoulder or message sign (PCMS)

Portable changeable

20'

100'

4' B(III)R

Temp. Plastic Drums

Lighting

Flagger Station

50'

10'

Markers

28" Tubular

Place roll-up signs in advance of barricades.

plaques to the sign face using hook and loop fasteners.

If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.

Continue signing and other traffic control devices

"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.

8' B(III)R barricades with 8' B(III)L barricades and replace the

If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.

or other roadway work. Use abrupt edge signing for longitudinal

Abrupt edges may be created by paving, operations, excavations

GENERAL NOTES FOR ALL TCP DRAWINGS:

for max. spacing.

See TCD Spacing Table

Temp. Plastic Drums for max. spacing.

See TCD Spacing Table

28" Tubular Markers

UNDER TRAFFIC

UNDER CONSTRUCTION

EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION

PORTABLE CHANGEABLE MESSAGE

LIGHTING DELINEATION

FLAGGER STATION

Sl. 1:3

TAPER TYPES & FORMULAS

TEMPORARY BARRIER FLARE RATE TABLE

TAPER FORMULA

Merging (Lane Closure)

Shifting

Shoulder Closure

Flagging (See Drg. TM850)

Downstream (Termination)

"L"

"L"3 1"L"/3 or

50' - 100'

Varies (See Drawings)

"L"2 1"L"/2 or the Speed from the Tables below:

Use Pre-Construction Posted Speed to select

For Lane closures where W < 10', use "L" value for W = 10'.

Limit spacing adjustments to 30% of the "A" dimension for all speeds.

When necessary, sign spacing may be adjusted to fit site conditions.

Place traffic control devices on 10 ft. spacing for intersection and access radii.

NOTES:

SPEED (mph) MINIMUM FLARE RATE

M I N I M U M L E N G T H S T A B L E

"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted

20:1

19:1

18:1

16:1

14:1

12:1

10:1

9:1

8:1

FREEWAYS

SPEED (mph) W = 12 W = 14 W = 16

TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE

20 - 30

35 - 40

45 - 55

60 - 70 700

100 100

15001000 2640

100 20

Device Spacing (ft)

Max. Channelizing Sign Spacing (ft) SPEED (mph)

A B C

CW21-8A

(As noted)

36x18

C W

(Mount on TSS)

(As needed)

42x18

CW21-8C

OR

C

W

Plaques

CW21-9

Abrupt edge

8' B(III)R 8' B(III)R

mi.4 1 mi.4

1 mi.4

EDGE

ABRUPT

RIGHT

LEFT

(Roll-up sign)

(As needed)

EDGE

ABRUPT 32x11

32x11

32x11

CENTER

RIGHT

LEFT

10≤ W

30≤

W/60, S = Speed, W=WidthS 45: L = WS, Speeds < 45: L = ≥ formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using

TYPICAL ABRUPT EDGE DELINEATION

Smart Work Zone Systems Portable Traffic Signals

Detail as shown is used for trailered and non-crashworthy components of:

barricade may be omitted when PCMS is placed behind a roadside barrier.

Use six drums in shoulder taper on 20' spacing. The drums and

Left shoulder, use Type B(III)L Right shoulder, use Type B(III)R Use the appropriate type of barricade panels for PCMS location.

Install PCMS beyond the outside shoulder, when possible.

To be accompanied by Dwg. Nos. TM820 & TM821.

divided highways or freeways when positive protection is not available, or as directed.

Provide a truck mounted attentuator (TMA) to protect the active work area on high speed

Flaggers, Traffic Control Measures, or as directed.

Coordinate and control pedestrian movements through a Temporary Accessible Route using

Combine drawing details to complete temporary traffic control for each work activity.

Do not locate sign supports in locations designated for bicycle or pedestrian traffic.

High speed highways have a pre-construction posted speed of 45 mph or higher.

Low speed highways have a pre-construction posted speed of 40 mph or less.

All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.

All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".

background of all temporary warning signs.

Use fluorescent orange sheeting for the All signs are 48" x 48" unless otherwise shown.

to indicate traffic movements.

Arrows shown in roadway are directional arrows sequential arrow boards.

Place a barricade approx. 20' ahead of all shown are the minimum required.

Signs and other Traffic Control Devices (TCD)

07-2022 Added a note for TPARs

07-2024 Added a note for TMAs the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM820

TEMPORARY BARRICADES

T M

.d g n

01-JUL-2020N/A

J U

L

LC

CL

CL

CL

sheeting on rail encapsulated lens

White and orange

Extg. ground

" 6 m in m in m in m in

V a r

4' min. - 8' max.

m in

V a r m in

"6 m in

24" min. - 48" max.

sheeting on rail encapsulated lens

White and orange

Extg. groundExtg. ground sheeting on rail encapsulated lens

White and orange

M in

V a r

"6

24" min.

direction toward which traffic must turn in detouring.

it is desirable that the stripes slope downward in the

Where a barricade extends entirely across a roadway, at an angle of 45° in the direction traffic is to pass.

Markings for barricade rails shall slope downward directions from the center of the barricade.

slope the chevron striping downward in both

Where both right and left turns are provided for, local road users.

across roadway unless access is required for may be used. Extend barricades completely

For full roadway closures, the C or LR barricade

NOTES:

Traffic Traffic

(For approaching traffic)(For approaching traffic)

(For approaching traffic)

Traffic

(For approaching traffic)

Traffic

BARRICADE RAIL LAYOUT

DIAGRAM FOR BARRICADE PLACEMENT AND SLOPE MARKING

BARRICADE NOTATION

B(III)R

LT. SIDE - L

CLOSED - C LT. / RT. - LR

RT. SIDE - R

TYPE I TYPE II TYPE III

is signed according to the TCP. See Dwg. No. TM844.

closed and a temporary pedestrian accessible route (TPAR)

Do not place barricades in sidewalks unless sidewalk is facility is properly closed and signed.

Do not block bike lanes or shoulders unless the space is limited.

Use 4' Type III barricades where horizontal

Use barricades from ODOT Qualified Products List (QPL).

Rails must be 8" min. to 12" max. in height.

For rails less than 36" long, 4" wide stripes shall be used.

from barricade.

Ballast shall not extend above bottom rail or be suspended may be placed on lower frame to provide additional ballast.

Sandbags (approximately 25 lb sack filled with sand)

GENERAL NOTES FOR ALL DETAILS:

Barricade type

Barricade on the roadway

Indicates barricade placement the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM821

TEMPORARY SIGN SUPPORTS

T M

.d g n

14-JUL-2023N/A

J U

L

4"x 4"x 12'

2 - 2"x 4" @ 45° angle

2"x 6"x 37"

36"

Sandbags per side (typ.)

lag screw

"x 3"8 31 -per side (typ.)

" dia. bolts8 32 -screw per side (typ.)

"x 3" lag 8 31 -per support (typ.)

"x 3" lag screws8 32 -

"x 37"2 1"x 54 sign (typ.)

48"x 48" sign area of 20 sq. ft. or less.

Use Double Post TSS for a total

NOTES:

per support (typ.)

2 - 3/8" dia. bolts per support (typ.)

2 - 3/8" dia. bolts

4 - 2"x 6"

40"

"2 12 - 4"x 4"x 5

NOTES:

2' - 8" Sandbags

2' - 6"

A

"4

" - 12 ga. PSST2

" - 12 ga. x 4" PSST Stub2

PSST Stub

" - 12 ga. x 4" 2 12 A

See DETAIL A

" - 12 ga. PSST4

" - 12 ga. PSST4 sign (typ.)

48"x 48" per support (typ.)

" dia. bolts8 3Two, support (typ.)

joining brace and

" dia. bolt 8

NOTES:

1 - 2"x 4"

1 - 4"x 4"x 4"

2 - 2"x 4"

1 - 4"x 4"x 4"

1- 2"x 4" 40"

Sandbags lag screws

"x 4"8 34 -

4"x 4"x 10'

"x 3" lag screws8 32 -

2"x 4"x35" @ 45° angle

2"x 4"x 6"

"x 3" lag screws8 32 -

"x 4" lag screws8 34 -

" dia. bolts8 31 -

" dia. bolts8 31 -

" dia. bolts8 32 -

" dia. bolts8 31 -sign (typ.)

36"x 36"

" dia. bolts8 32 -

TEMPORARY SIGN SUPPORT GENERAL NOTES:

Sheeting

Retroreflective

Sheeting

Retroreflective

" Sheeting

Retroreflective m in and Right sides)

Sheeting (Left

Retroreflective

NOTES:

SIGN POST REFLECTIVE SHEETING PLACEMENT

Sheeting

Retroreflective Sheeting

Retroreflective signs. Do not mount signs on Type II or III Barricades.

Use Single Post TSS for mounting "Business Access" (CG20-11)

Use Single Post TSS for a total sign area of 12 sq. ft. or less.

Sheeting may be applied directly to post material; or applied to a rigid, lightweight substrate, then securely attached to the posts.

for wood post TSS's. Use 2" wide sheeting for PSST TSS's.

Apply sign post retroreflectivity to each TSS post facing front; and to the left and right sides of the TSS, as shown. Use 3" wide sheeting and "DO NOT ENTER". For "STOP" and "DO NOT ENTER" signs, used red ANSI Type III or IV retroreflective sheeting on the TSS posts.

Apply fluorescent orange, ANSI Type VIII or IX retroreflective sheeting to TSS posts, as shown, for all temporary signs, except "STOP"

Use A325 Bolts or equivalent.

welding. Repair Galvanizing according to ASTM A780.

designation G90. Remove Galvanizing from steel before

Galvanize steel according to ASTM A653 with coating

All members shall have a minimum yield stress of 50 ksi.

Use PSST TSS's for a total sign area of 16 sq. ft. or less.

Society (AWS) D.1.1.

Weld steel according to American Welding

" - 12 ga. x 4" PSST Stub.2 1inside of the 2

" PSST4

1Do not use bolt to secure 2

" - 12 ga. x 4" PSST Stub.2 1inside of the 2

" - 12 ga. PSST to extend entire length 4

See Dwg. No. TM204 for flag board mounting detail.

(25 lb. max per bag) (min. 100 lbs per side of each TSS).

Place a minimum of 50 lbs of sandbags on each of the four TSS supports legs.

TSS posts.

away from traffic, or cover the sign. Do not cover reflective sheeting on the

When not in use, locate TSS as far from Public Traffic as practicable and turn

Do not place or stack ballast more than 24" above the ground.

See "Temporary Sign Placement" detail on TM822 for sign installation heights.

four sides (S4S) and free of heart center (FOHC).

For wooden TSS's, use either Douglas Fir or Hem Fir, which is surfaced

Do not locate TSS's in locations that block pedestrian or bicycle traffic.

Do not tip over TSS at any time.

Double Post Perforated Steel Square Tube (PSST) Single Post

DOUBLE POST DETAIL PERFORATED STEEL SQUARE TUBE (PSST) DETAIL SINGLE POST DETAIL

Front Right Left Front FrontRight Left Side

(No Scale)

DETAIL A

" - 12 ga. PSST 4

" - 12 ga. PSST2

A A

(No scale)

SECTION A-A

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM861

FREEWAY SECTIONS

T M

.d g n

01-JUL-2020N/A

J U

L

"L"

2'

W 8-

NOTES:

EDGE

ABRUPT

(All stages)

36x24

R2-6aP

B A 2 A

30'±30'±

300'±

30'±

300'±

Median

A

A

A

AC B A

See INSET "A"

Median mi.±2

30'±30'±30'±

8' B(III)R 8' B(III)R

under construction

End of area under construction

Start of area traffic adjacent to

Abrupt edge

Use "LEFT SHOULDER CLOSED" sign.

For left shoulder work, place TCD to close the left shoulder.

NOTE:

Sequential Arrow

(Mount on TSS)

(As needed)

(Mount on TSS)

(Mount on TSS)

C W

C W

W a

W a

W

(Roll-up sign)

CW21-9

32x11

32x11

32x11

(All stages)

36x24

R2-6aP

(All stages)

36x24

R2-6aP

W

W

W

W

W

W

W

W

Traffic

Under

Construction

Under

1000'

Taper

"B"

Buffer

"B"

Buffer

"B"

Buffer

"B"

Buffer

"B"

Buffer

AHEAD

WORK

ROAD

DOUBLE

FINES

CLOSED

SHOULDER

RIGHT

CLOSED

SHOULDER

RIGHT

"L"

RIGHT

LEFT

CENTER

AHEAD

WORK

ROAD

DOUBLE

FINES

½ MILE

CLOSED

RIGHT LANE

½ MILE

CLOSED

RIGHT LANE

AHEAD

WORK

ROAD

DOUBLE

FINES

(As needed)

54x18

CW21-8B

EDGE

ABRUPT

CENTER

(As needed)

54x18

CW21-8B

EDGE

ABRUPT

CENTER

BUMP

(As needed)

BUMP

(As needed) W

W

GENERAL NOTES FOR ALL DETAILS:

To be accompanied by Dwg. Nos. TM820, & TM821.

signed by the State Traffic Engineer.

* Regulatory speed reductions on State Highways require a Speed Zone Order

*Temp. Regulatory Speed Zone Reductions.

work zone, including; PMCS, Radar Speed Trailers, Advisory Speed signing, Additional traffic control devices may be used, as directed, to enhance the area. Locate TMA as per manufacturer's instructions, or as directed.

Truck Mounted Attenuator (TMA) should be used to protect the active work

AHEAD" (W20-5) signs and the appropriate "LEFT LANE ENDS" (W4-2) signs.

For work in the left lane, place TCD to close the left lane. Use "LEFT LANE CLOSED

UNDER CONSTRUCTION

UNDER TRAFFIC

Median

C

30'±

(All stages)

36x24

R2-6aP

W

DOUBLE

FINES

AHEAD

WORK

ROAD

W bAHEAD

CLOSED

SHOULDER

RIGHT

W bAHEAD

CLOSED

SHOULDER

RIGHT

unless otherwise directed.

For Freeway preservation work use Dwg. No. TM880, Remove rumble strip according to the plans and Dwg. No. TM830.

Do not stage traffic across longitudinal shoulder rumble strips.

plaques to the sign face using hook and loop fasteners.

If roll-up signs are used, attach the correct (CW21-9) where applicable.

"BUMP" (W8-1) signs to be installed on both sides of highway throughout area under construction where applicable.

mile intervals2 1to be installed on both sides of highway at

Additional ''ABRUPT EDGE''(CW21-(7,9)) signs with appropriate riders of 1 inch or greater.

Use "ABRUPT EDGE" (CW21-(7,9)) signing for longitudinal abrupt edges

CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. No. TM800.

To determine sign spacing A, B, and C, use "TRAFFIC on Dwg. No. TM800 to determine Taper Length "L" and Buffer Length "B".

Unless otherwise shown, use the "MINIMUM LENGTHS TABLE"

TM822 for Concrete Barrier Sign Support details.

with a maximum 12 sq. ft. of total sign area. See Dwg. No.

Use Concrete Barrier Sign Supports for mounting signs with the work areas, shall move with the work areas.

Signing and other TCD shown to be installed in conjunction

Flaggers are not permitted to stop or hold freeway traffic.

48x24

CG20-2A

ROAD WORK

END

48x24

CG20-2A

ROAD WORK

END

SHOULDER CLOSURE

Divided Highway or Freeway

ONE LANE CLOSURE

Divided Highway or Freeway

(Signing Detail)

INSET "A"

SECTION A-A

on 40' max. spacing.

Temp. Plastic Drums the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2024 - May 31, 2025

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

A01
BA01_FLAT
BA02_FLAT
BA03_FLAT
BA04_FLAT
RD610
TM800
TM820
TM821
TM861

File details come from the government source that posted it. Updated .