This document is a Past Performance Questionnaire for a VA Central California Healthcare System project in Fresno, specifically related to Design-Build Services for installing tieback roof anchors in Building 1. The solicitation (No. 36C26126R0003) is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a project value between $250,000 and $500,000, targeting commercial and institutional building construction. The project requires furnishing design, labor, materials, engineering services, and roof anchor installation at the Fresno VA Medical Center, with a 240-calendar day performance period after Notice to Proceed.
Key dates include a pre-solicitation site visit scheduled for November 19, 2025, at 12:00 PM PST, with Request for Information (RFI) submissions due by November 26, 2025, at 1:00 PM PST. Phase 1 proposals are due on December 3, 2025, at 2:00 PM PST. The questionnaire is designed to evaluate contractor performance across seven primary assessment areas: quality, schedule/timeliness, customer satisfaction, management/personnel, cost/financial management, safety/security, and general performance metrics. Contractors will be rated using a scale ranging from Exceptional to Unsatisfactory, with opportunities to provide detailed comments for each evaluation category.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VA Fresno ACM Survey Asbestos Study_20251205.pdf | ||
| 36C26126R0003 0004.docx | DOCX document | |
| As-built Drawings - Tie backs Merged.pdf | ||
| RFI Responses FRE Anchor Tie Downs 20251205.pdf | ||
| DB SOW Draft_Fresno VA_B1 Tiebacks _R1.pdf | ||
| 36C26126R0003 0003.docx | DOCX document | |
| 36C26126R0003 0002.docx | DOCX document | |
| 36C26126R0003 0001.docx | DOCX document | |
| ATTACHMENT D - Pre-solicitation Site Visit Presentation.pptx | PPTX presentation | |
| DB SOW_Fresno VA_B1 Tiebacks_Final.pdf | ||
| DBA Wage Determination No. CA20250018 dated 20250926.pdf | ||
| ATTACHMENT E - RFI Form.docx | DOCX document | |
| ATTACHMENT C - PHASE 2 FACTOR 4 - Offerors Key Personnel.docx | DOCX document | |
| ATTACHMENT A - PHASE 1 FACTOR 2 - EXPERIENCE.xlsx | XLSX spreadsheet | |
| 36C26126R0003_2.docx | DOCX document | |
| 01 00 00 - General Requirements.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS
VA CENTRAL CALIFORNIA HEALTHCARE SYSTEM – FRESNO
PROJECT NO: 570-26-611
DESIGN-BUILD SERVICES TO INSTALL TIEBACK ROOF ANCHORS BUILDING 1
The information obtained from this questionnaire will be utilized to evaluate the past and present performance of offerors submitting proposals in response to the 36C26126R0003 – Project No. 570-26-611, Design Build Services to Install Tieback Roof Anchors Building 1. The information you provide will be instrumental in allowing the Government to evaluate how well the contractor performed under your contract(s).
a. Please complete all sections of the attached questionnaire. Include your name and title, organizational address, e-mail address, telephone and fax number.
b. Include the contractor’s name, your point of contact (POC,) the title and/or description of the type of work performed the award number, the value of the contract, the award and completion date of the project and the type of award.
c. Use the attached rating scale rate each performance element.
d. Comments are encouraged and would be appreciated. The last page may be used if additional space is needed for comments. Clear handwritten responses are sufficient.
e. It is important that the questionnaire be completed and returned by the date proposal is due (December 3, 2025 at 2:00 pm PDT). Please e-mail your response to the following address:
Daniel Jhun, Contracting Officer - Construction Branch II at Email: daniel.jhun@va.gov.
Thank you for your time and participation.
PAST PERFORMANCE RATING SCALE
| RATING: |
| DEFINITION: |
| USAGE: |
| EXCEPTIONAL |
| Performance exceeded many contractual requirements to the Government’s benefit. The contractual performance of the element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective. |
| An EXCEPTIONAL rating is appropriate when the contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit however could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified |
| GOOD |
| Performance exceeded some contractual requirements to the Government’s benefit. The contractual performance of the element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were effective. |
| A GOOD rating is appropriate when the contractor has successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified. |
| SATISFACTORY |
| Performance met all contractual requirements. The contractual performance of the elements being assessed were accomplished with no more than a few minor problems for which corrective actions taken by the contractor were satisfactory. |
| A SATISFACTORY rating is appropriate when there were only a few minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. |
| MARGINAL |
| Performance did not meet some contractual requirements. The contractual performance of the element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully successful. |
| A MARGINAL rating is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner. |
| UNSATISFACTORY |
| Performance did not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element contains a serious problem(s) for which the contractor’s corrective actions were ineffective. |
| An UNSATISFACTORY rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however could be of such serious magnitude that it alone constitutes an unsatisfactory rating. |
| Neutral/Not Applicable or Unknown |
| No performance record identifiable within the area of evaluation |
| Performance was not observed or not applicable to the current effort being reported. |
PAST PERFORMANCE QUESTIONNAIRE
NAME OF CONTRACTOR BEING EVALUATED:
CONTRACTOR MAIN POC
CONTRACT NUMBER:
CONTRACT VALUE:
| CONTRACTOR PERFORMED WORK AS: |
| CONTRACT AWARD & COMPLETION DATE: |
Prime Contractor Sub- Contractor Key Personnel
PROJECT TITLE AND BRIEF DESCRIPTION OF WORK:
RESPONDENT’S NAME
YOUR ORGANIZATIONAL ADDRESS
PHONE/FAX NO:
E-MAIL:
1. QUALITY:
| A. Quality of technical data/report preparation efforts |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| B. Ability to meet quality standards specified for technical performance |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| C. Timeliness/effectiveness of contract problem resolution without extensive customer guidance |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| D. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance) |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
| A. Compliance with contract delivery/completion schedules including any significant intermediate milestones |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| B. Rate the contractor’s use of available resources to accomplish tasks |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
3. CUSTOMER SATISFACTION:
| A. To what extent were the end users satisfied with the project? |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| B. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports and business communication) |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| C. To what extent was the contractor cooperative, businesslike and concerned with the interests of the customer? |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| D. Overall customer satisfaction |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
4. MANAGEMENT/PERSONNEL/LABOR
| A. Effectiveness of on-site management, including management of subcontractors, suppliers, materials and/or labor force? |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED
| B. Ability to hire, apply and retain a qualified workforce to the effort |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| C. Government Property Control |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| D. Knowledge/expertise demonstrated by contractor personnel |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| E. Ability to simultaneously manage multiple projects with multiple disciplines. |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| F. Ability to assimilate and incorporate changes in requirements or priority, including planning, execution and response to Government changes |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| G. Effectiveness of overall management (including ability to effectively lead, manage and control the program) |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
5. COST/FINANCIAL MANAGEMENT
| A. Ability to meet the terms and conditions contractually agreed to price(s)? |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED
| B. Contractor proposed innovative alternative methods/processes that reduced costs, improved maintainability or other factors that benefited the client. |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| C. If this is/was a Government cost type contract, please rate the contractor’s timeliness and accuracy in submitting monthly invoices with appropriate backup documentation, monthly status reports/budget variance reports, compliance with established budges and avoidance of significant and/or unexplained variances (under runs or overruns) |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| D. Have there been any indications that the contractor has had any financial problems? If yes please explain below |
| RATING |
| Yes |
| No |
Comments:
6. SAFETY/SECURITY:
A. To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
RATING
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| B. Contractor complied with all security requirements for the project and personnel security requirements. |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED
7. GENERAL:
| A. Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM, or Contracting officer in a timely manner regarding urgent contractual issues.) |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
| B. Compliance with contractual terms/provisions (explain if specific issues) |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments:
C. Would you hire or work with this firm again (if no, please explain below)
RATING
| Yes |
| No |
| D. In summary, provide an overall rating for the work performed by this contractor. |
| RATING |
| E |
| G |
| S |
| M |
| U |
| N |
Comments: