This document is an Asbestos Survey Report for the Fresno VA Medical Center conducted by Millennium Consulting Associates in October 2012. The comprehensive survey covered 18 buildings and select underground pipe chases, collecting 2,722 bulk samples analyzed for asbestos-containing materials (ACM). The survey identified various ACM types across the campus, including resilient floor tiles, floor mastics, pipe insulation, sealants, transite panels, and other building materials, with each material categorized by condition, potential future damage, and friability rating.

The survey was performed in accordance with EPA guidelines and Cal/OSHA regulations, with six certified personnel conducting the inspection. Key findings included ACM presence in the Main Hospital (Building 1), which had 1,443 samples collected, revealing multiple asbestos-containing materials such as floor tiles, pipe insulations, wall mastics, and transite panels. The report provides detailed risk assessments for each building, including location-specific ACM descriptions, condition evaluations, and recommendations for future renovation, repair, or demolition projects. The survey's primary objectives were to identify, document, and sample suspect ACM, and to report, assess, and quantify all ACM discovered during the investigation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal No. 13 VA Fresno ACM Survey

FSS Order No. VA261-12J-2620 Asbestos Study

Submitted by:

Mr. Jeremy Malson Millennium Consulting Associates

620 Contra Costa Blvd., Ste. 102 Pleasant Hill, CA 94523

925.808.6700

FAX: 925.808.6708

i

Contents

1.0 EXECUTIVE SUMMARY

2.0 INTRODUCTION

2.1 SCOPE OF WORK

2.2 SAMPLING METHODS, PROCEDURES AND PERSONNEL

2.2.1 Review of Procedures: Asbestos Inspection, Bulk Sampling, Laboratory Information and Risk Assessment

3.0 SITE HISTORY AND BUILDING SUMMARY

4.0 ASBESTOS SURVEY RESULTS

ACM DATA RESULTS

Building 1 – Main Hospital

Building 2 – Boiler Plant

Building 3 – Engineering Building

Building 4 – Pump Chlorinator & Emergency Generator

Building 5 – Pump House

Building 6 – Disposal Well

Building 7 – Gasoline Pump & Tank

Building 8 – Storage Shed

Building 15 – Recreational Storage Shed

Building 16 – Storage Building

Building 17 – Liquid Oxygen Tank

Building 18 – OP Parking Lot HC Elevator

Building 19 – Electric Utility Area

Building 22 – Chiller Plant

Building 24 – VA Medical Education Center & Library

Building 31 – Community Living Center

Building 32 – Warehouse

Building 34 – Emergency Generator Building

Building OPC – Outpatient Clinic

5.0 CONCLUSIONS AND RECOMMENDATIONS

CONCLUSIONS

RECOMMENDATIONS

6.0 LIMITING CONDITIONS

Project No. 22015.2025 October 2012 ii

Tables

Table 1. Survey Summary of Positive ACM and ACCM Results Table 2. Building Listing for the VA Fresno Asbestos Survey Project Table 3. AHERA Risk Assessment Summary for Building 1 Table 4. NESHAP Summary for Building 1 Table 5. AHERA Risk Assessment Summary for Building 2 Table 6. NESHAP Summary for Building 2 Table 7. AHERA Risk Assessment Summary for Building 3 Table 8. NESHAP Summary for Building 3 Table 9. AHERA Risk Assessment Summary for Building 4 Table 10. NESHAP Summary for Building 4 Table 11. AHERA Risk Assessment Summary for Building 5 Table 12. NESHAP Summary for Building 5 Table 13. AHERA Risk Assessment Summary for Building 6 Table 14. NESHAP Summary for Building 6 Table 15. AHERA Risk Assessment Summary for Building 7 Table 16. NESHAP Summary for Building 7 Table 17. AHERA Risk Assessment Summary for Building 8 Table 18. NESHAP Summary for Building 8 Table 19. AHERA Risk Assessment Summary for Building 15 Table 20. NESHAP Summary for Building 15 Table 21. AHERA Risk Assessment Summary for Building 16 Table 22. NESHAP Summary for Building 16 Table 23. AHERA Risk Assessment Summary for Building 17 Table 24. NESHAP Summary for Building 17 Table 25. AHERA Risk Assessment Summary for Building 18 Table 26. NESHAP Summary for Building 18 Table 27. AHERA Risk Assessment Summary for Building 19 Table 28. NESHAP Summary for Building 19 Table 29. AHERA Risk Assessment Summary for Building 22 Table 30. NESHAP Summary for Building 22 Table 31. AHERA Risk Assessment Summary for Building 24 Table 32. NESHAP Summary for Building 24 Table 33. AHERA Risk Assessment Summary for Building 31 Table 34. NESHAP Summary for Building 31 Table 35. AHERA Risk Assessment Summary for Building 32 Table 36. NESHAP Summary for Building 32 Table 37. AHERA Risk Assessment Summary for Building 34 Table 38. NESHAP Summary for Building 34 Table 39. AHERA Risk Assessment Summary for Building OPC Table 40. NESHAP Summary for Building OPC Table 41. Survey Summary of Positive ACM and ACCM Results iii

Appendix Data Table Summary Results ....................................................................................................... Appendix A Laboratory Data and Laboratory Certifications ......................................................................... Appendix B Figures – Site Sampling Maps .......................................................................................................Appendix C Figures – Photo Log of ACM ...................................................................................................... Appendix D

1.0 EXECUTIVE SUMMARY

Millennium Consulting Associates (Millennium) performed a campus-wide asbestos survey for the Fresno VA Medical Center (Fresno VA) in accordance with RFP VA261-12-R-1059. The project is being conducted to determine the existence of Asbestos Containing Materials (ACM) in specified buildings. The final results of the survey are incorporated into this report providing a means for the Fresno VA to more efficiently plan for repairs, renovations and/or demolition projects.

The following buildings were included in the scope of the asbestos survey: Buildings 1-8, 15-19, 22, 24, 31, 32, 34, OPC and select exterior underground pipe chases. The following table summarizes the positive survey results for the buildings (>1% ACM and >0.1% ACCM).

Table 1. Survey Summary of Positive ACM and ACCM Results.

Building Summary of Results

1 • 12”x12” light brown/beige/tan/white/peach/light pink resilient floor tiles HA1;

• Black mastic associated with the 12”x12” light brown/beige/tan/white peach/light pink/yellow resilient floor tiles HA2;

• 12”x12” yellow resilient floor tile HA3;

• Black floor mastic w/ associated yellow/blue/green adhesive (under carpeting and/or faux wood) HA2;

• Black pipe insulation HA16;

• 9”x9” green resilient floor tile HA4;

• Black mastic associated with the 9”x9” green resilient floor tiles HA2;

• 9”x9” red/brown resilient floor tile HA5;

• Black mastic associated with the 9”x9” red/brown resilient floor tiles HA2;

• Black mastic associated with the 12”x 12” maroon resilient floor tiles HA2;

• Beige vinyl sheet flooring w/ small square pattern HA6;

• Black wall mastic waterproofing/vapor sealant HA9;

• Gray HVAC/Fan sealant HA15;

• Tan/white/beige door sealant HA12;

• Gray exterior window sealant HA14;

• Exterior door sealant HA13;

• Brown/orange sealant/felt HA11;

• 12” TSI pipe w/green wrap HA17;

• Black mastic associated with the gray VSF & gray underlayment/gray 12”x12”

VFT HA2;

• Black mastic associated with the 12”x12” peach resilient floor tiles HA2;

• 4” TSI pipe w/beige wrap HA18;

• Transite exhaust pipe w/ silver paint HA10;

• Tan wall tile grout HA8;

• 4” & 8” TSI pipe w/blue/gray wrap HA19

• Black mastic associated with the 12”x12” light pink resilient floor tiles HA2;

• Beige floor leveling compound HA7;

• 4” TSI pipe w/silver wrap HA20;

• Gray/black duct wrap HA21;

Building Summary of Results

• Black mastic associated with the light pink resilient sheet floor w/ green specks

HA2;

• 12”x12” Gray resilient floor tile HA22;

• Black sink undercoat HA23; and

• Tan resilient sheet flooring (below light blue VSF) HA24;

• Blue resilient sheet flooring HA25;

• Black mastic associated with the blue resilient sheet flooring HA2; and

• White wall texture/plaster HA26;

• Elevator brake pads HA27; and

• Gray transite panels in fume hoods (~3 hoods) HA28.

2 • White TSI pipe insulation HA1;

• Gray/green pipe flanges HA2;

• Tan gaskets HA3;

• Transite pipe HA4 (assumed ACM); and

• Sub-grade pipe chase consisting of assumed ACM TSI pipe insulation servicing buildings 1, 10, 12, 13 and 14 HA5. Note: The tunnel did not appear to have ACM TSI present at the time of the survey. However, the sub-grade pipe chases did appear to have ACM TSI present.

3 • Joint compound associated with the drywall system ceiling HA1;

• Drywall system ceiling material composite analysis HA1;

• Beige 9”x9” vinyl floor tile HA2; and

• Black mastic associated with the beige 9”x9” vinyl floor tile HA2.

4 • Transite walls, roof and siding (assumed ACM).

5 • Black roof penetration mastic located at the vent(s); and

• Black wall penetration gasket located in the northwest corner.

6 • No suspect materials were visually noted at the time of the survey.

7 • No suspect materials were visually noted at the time of the survey.

8 • No suspect materials were visually noted at the time of the survey.

15 • No suspect materials were visually noted at the time of the survey.

16 • Black fibrous tar roofing material (roof field).

17 • No ACM was detected at the time of the survey.

18 • No ACM was detected at the time of the survey.

19 • No ACM was detected at the time of the survey.

22 • No ACM was detected at the time of the survey.

Building Summary of Results

• 12”x12” light brown/beige/tan/white resilient floor tile HA1 & HA2;

• Black mastic associated with the 12”x12” light brown/beige/tan/white resilient floor tiles HA2 & HA3;

• Gray sink undercoating (all sinks w/ gray/white undercoat);

• Black/orange carpet mastic HA4:

• Gray transite panels in the fume hoods (Labs 3A-6 & 3A-29); and

• Black countertop mastic (Labs 3A-6 & 3A-29).

• White window sealant (all exterior windows);

• Dark gray door sealant (all interior & exterior doors);

• Gray & beige door sealant (all interior doors); and

• Gray & beige window sealant (all interior windows).

32 • Gray/black roof flashing sealant (roof).

34 • No ACM was detected at the time of the survey.

OPC

• 12”x12” light brown resilient floor tile;

• 12”x12” brown resilient floor tile;

• Black mastic associated with the 12”x12” light brown/beige/tan/white/brown resilient floor tiles;

• Black sink undercoating; and

• Gray/white exterior transite panels.

Note: Please refer to the drawings for the homogenous area (HA#) locations.

2.0 INTRODUCTION

Millennium conducted an asbestos survey for the Fresno VA in accordance with RFP VA261-12-R- 1059 from September 17, 2012 through October 19, 2012. The Fresno VA campus is located at 2615 E. Clinton Avenue, Fresno, CA. The survey included multiple buildings throughout the campus. The buildings included the scope of the asbestos survey are: Buildings 1-8, 15-19, 22, 24, 31, 32, 34, OPC and select exterior underground pipe chases. The final results of the survey will provide a means for the Fresno VA to more efficiently plan for repairs, renovations and demolition projects.

2.1 SCOPE OF WORK

The scope of work for the project included the submission of nine (9) deliverable items. The required submittals and their approval dates included:

1. Pre-Survey Report - Submitted for Approval on August 31, 2012

2. QA/QC Plan – Approved 09/14/2012

3. Health and Safety Plan – Approved 09/14/2012

4. Employee Certifications – Approved 09/14/2012

5. Drawing Criteria - Pending

6. Project Schedule – Approved 09/14/12

7. Schedule of Values – Approved 08/23/12

8. Survey Report - Pending

9. Drawings - Pending

The asbestos survey tasks included reviews of historical records and data, site visits, collection of representative samples, assessment of the condition of the materials, and quantification of the asbestos-containing materials throughout the specified buildings. In accordance with the project requirements, samples were not taken if it rendered the material unstable, had the potential to cause leaking or other deterioration of the base material or if the sampling posed a hazard to those working in and around the building.

The reporting requirements also include sample location maps in AutoCAD format, indexed schedule of samples and pertinent notes, and a narrative on the methodology of the survey.

2.2 SAMPLING METHODS, PROCEDURES AND PERSONNEL

A detailed sampling and analysis plan was prepared prior to the site survey. These sample collection and handling procedures were provided in the Quality Assurance Project Plan (QAPP) dated September 7, 2012. In summary of the QAPP, the asbestos survey was performed using general procedures and protocols defined in EPA 40 CFR, part 763.

The asbestos analyses were performed at an independent 3rd party accredited laboratory using the EPA 600/R-93/116 method. Additional confirmation analyses were not performed in accordance with the project requirements (e.g., point counting and transmission electron microscopy). All locations within the scope of work were physically inspected and categorized (i.e., AHERA and NESHAP categories), homogeneous area-by homogeneous area, to determine the presence of ACM.

Millennium personnel held valid Cal/OSHA licenses for the respective type of work they performed. These asbestos specific licenses include: Certified Asbestos Consultants (CAC) and Site- Surveillance Technicians (SST). The field staff and their respective certifications that performed site assessment activities are:

1. Mr. Jeremy Malson (CAC No. 07-4183)

2. Mr. Wes Chase (CAC No. 12-4846),

3. Mr. Kevin Milani (CSST No. 06-4035),

4. Ms. Nichole D’Ottavio (CSST No. 11-4803),

5. Mr. Tyler Belair (CSST No. 11-4744), and

6. Mr. Ramil Arcia (CAC No. 10-4613).

2.2.1 Review of Procedures: Asbestos Inspection, Bulk Sampling, Laboratory Information and Risk Assessment

The asbestos inspection and bulk sampling procedures were based on the guidelines established by the U.S. EPA in the Guidance for Controlling Asbestos Containing Materials in Buildings, Office of Pesticides and Toxic Substances, DOC #560/5-85-024 and 40 CFR Part 763, Asbestos Hazard Emergency Response Act (AHERA). Field information is organized according to the AHERA concept of Homogeneous Areas (HA). A HA is defined as a suspect material of similar age, appearance, function, and texture. Each material will be grouped together as a specific HA, sampled, and then assessed for condition. The AHERA guidelines represent an industry standard sampling protocol and as such was utilized during the inspection and sampling. For the purposes of this inspection, suspect ACM has been placed in three (3) material categories:

1. Thermal Systems Insulation (TSI);

2. Surfacing Materials; and

3. Miscellaneous Materials.

The locations within the buildings were physically inspected on a functional space-by-functional space and homogeneous area-by-homogeneous area basis, to determine the presence of ACM. Core samples of friable and non-friable suspect materials were collected by penetration of the suspect material to its substrate. The bulk samples collected were placed in individual sealed containers and labeled with unique sample identification numbers. Representative samples of each sampling area were then submitted to the laboratory to be analyzed for asbestos content.

Specifically, the inspection involved the following tasks:

1. Visual determination as to the extent of visible and accessible suspect materials and conditions of the material;

2. Collection and analyses of suspect building materials for asbestos content;

3. Determining condition (i.e., friable or non-friable) of suspect materials by physically touching, assessing, and placing the material into the correct ACM category (i.e., Physical Condition Assessment);

4. Quantification of the amount of suspect friable and non-friable materials along with their location;

5. Identification of all suspect materials sampled on the appropriate building floor plan diagram with the sample number; and

6. Preparation of a Chain-of-Custody form that accompanied the samples to the laboratory.

The U.S. EPA AHERA specifies that a physical assessment of all friable suspect material must be performed during the inspection. The suspect materials are assessed to determine if they pose a hazard, and if so, they are then ranked according to risk. The physical condition assessment consists of determining the condition of the ACM, the probable cause of damage, and the potential for future disturbance. AHERA lists seven categories in which to assess the current condition and potential for damage. These categories are as follows:

1. Damaged or Significantly Damaged Friable Thermal System Insulation;

2. Damaged Friable Surfacing Material;

3. Significantly Damaged Friable Surfacing Material;

4. Damaged or Significantly Damaged Friable Miscellaneous Material;

5. ACM with potential for damage;

6. ACM with the potential for significant damage; and

7. Any remaining Friable ACM or Assumed Friable ACM.

Additionally, as part of the assessment and categorization of materials, the ACMs are further defined by the current condition of the ACM, the potential for future damage, and a friability rating. These are defined as follows:

1. Current Condition of ACM: A ranking system using a scale of 1-7 was used to evaluate the current condition of ACMs. A rank of "1" means the material is in "poor" condition and requires top priority for correcting the hazard risk. A result of "5" would indicate material in "fair" condition with moderate potential for future damage, which typically requires corrective actions. A rank of "7" indicates material in "good" condition with low potential for future damage; category 7 areas have a low hazard risk. The criteria for determining the fair and poor condition are as follows:

a. Fair: The overall damage is up to ten percent (≤10%) and/or any localized damage is up to twenty-five percent (≤25%).

b. Poor: The overall damage is greater than ten percent (>10%) and/or any localized damage is greater than (>25%).

2. Potential for Future Damage of ACM: Another step in the assessment process is to determine the potential for future damage or deterioration for material classified as good or fair. The potential for future damage was classified as High, Moderate, or Low. There are many factors to consider in determining whether or not there is potential for future damage. Some of these factors may include potential for physical contact and the influence of environmental factors such as vibration, air erosion, the likelihood of water damage, etc.

3. Friability Rating: All material were given a friability rating and classified as either Friable ACM or Non-Friable ACM. Friable ACM is defined as any material that contains more than one percent (>1%) asbestos and can be crumbled, pulverized, or reduced to powder by hand pressure. It is a description of risk and refers to a material’s likeliness to release airborne fibers.

Chain-of-Custody procedures and records provide a means of tracing each sample from the time of collection through the shipment and final analyses. Proper Chain-of-Custody procedures also provide a written record of all persons handling the samples. The information necessary to relate sample locations for reporting purposes is documented with each sample. This information is essential to proper completion of a sample results report and typically includes client and facility information; unique sample identification number; date and time sampled; sampler name and signature; sample location including the room/area; and field sketches of sample locations.

All sample analyses were performed by EMSL Analytical, Inc., San Leandro, CA, a laboratory which is certified by the State of California Environmental Laboratory Accreditation Program (CA ELAP No. 1620), the U.S. Department of Commerce, National Institute of Standards and Technology (NIST) Proficiency Analytical Testing (PAT No. 10178) program, and is accredited by the National Voluntary Laboratory Accreditation Program (NVLAP No. 101048-3) for bulk asbestos analyses.

The laboratory will be requested to retain the samples for at least ninety (90) days in the event re-analyses of samples are required. All disposal of samples will be compliant with established Federal, state, and local regulations.

3.0 SITE HISTORY AND BUILDING SUMMARY

The United States has the most comprehensive system of assistance for veterans of any nation in the world. The VA health care system has grown from 54 hospitals in 1930, to include 152 hospitals;

800 community based outpatient clinics; 126 nursing home care units; and 35 domiciliaries. VA health care facilities provide a broad spectrum of medical, surgical, and rehabilitative care. This project includes the Fresno VA Medical Center.

The Fresno VA has conducted considerable remodeling of various buildings and areas, particularly in the main hospital (i.e., Building 1, ca. 1949). Three large remodel projects including the entire 4th floor of Building 1, the east wing of the 6th floor in Building 1, and the basement of the Outpatient Clinic (OPC) were fully renovated. A site-wide thermal system insulation (TSI) abatement project was completed in 2010. This project included the removal of accessible asbestos-containing TSI.

Similarly, other buildings on the campus, which are part of this contract, have undergone multiple renovations since their original construction. The detailed list of buildings and areas included in the project are as follows:

Table 2. Building Listing for the VA Fresno Asbestos Survey Project.

Building No. Building Name Year Built

Estimated Gross Square

Feet 1 Main Hospital 1949 246,894

2 Boiler Plant (Including underground pipe chase) 1949 5,621

3 Engineering Building 1949 7,863

4 Pump Chlorinator/Emergency Generator 1949 537

5 Pump House 1949 220 6 Disposal Well ? 5 7 Gasoline Pump and Tank 1977 2,073 8 Storage Sheds 1977 400 15 Recreational Storage Shed ? 250 16 Storage 1949 1,118 17 Liquid Oxygen Tank ? 640 18 OP Parking Lot Handicap Elevator 1987 254 19 Electric Utility Area 1949 2,401 22 Chiller Plant 1978 2,492 24 VA Medical Education and Library 1981 41,231

31 GECU 1982 31,328

32 Warehouse 1988 17,384 34 Emergency Generator Building ? 352

OPC Outpatient Clinic 1981/1988 63,698

4.0 ASBESTOS SURVEY RESULTS

The objective of this campus-wide asbestos survey is to (1) Identify, document and sample suspect ACM; and (2) Report, assess, and quantify all ACM discovered during the survey.

ACM DATA RESULTS

A total of two-thousand-seven-hundred-twenty-two (2,722) bulk samples were collected and then analyzed on a layer-by-layer basis using polarized light microscopy (PLM). The following sections lists the positive building materials identified, sampled, and analyzed during this investigation. The Risk Assessment for each identified ACM is given in the first table for each building. The NESHAP Category and Quantification of each ACM is given in the second table for each building. Please refer to the laboratory data in Appendix A and B for the complete analytical details. Every reasonable effort was made to access all areas within the scope of work.

Building 1 – Main Hospital

Building No. 1 is the main hospital. The building is 246,894 ft2 in size and was built in 1949. This building contains seven floors, a basement and a subbasement. This building has undergone numerous renovations of select areas and systems (e.g., a TSI removal project and the 4th floor renovation) since its construction.

A total of one-thousand-four-hundred-forty-three (1,443) samples were collected for Building 1, including layers. A summary of the samples containing asbestos are summarized in Tables 3 and 4.

The construction materials sampled in Building 1 include:

• Drywall Systems

• Ceramic Tile Wall/Floor Systems

• Ceiling and Wall Plaster Systems

• Flooring Mastics, Sealants, Paints

• Exterior Stucco and Concrete Systems

• Exterior Window Glazing

• Exterior Caulking Systems and

Various Sealants

• Acoustical ceiling materials

• Cementitious Wall Panels on the Parapet Wall

• Roofing Penetration Mastics

• Roofing Field Sheet Materials

• HVAC Mastics and Tapes

• Pipe Gaskets

• Thermal System Insulations

• Transite panels in lab hoods

• Sink under coatings

• Elevator Brake Pads (assumed)

Note: The inaccessible areas of Building 1 include: Room E202C (MRI Scanner) was not accessible due to the equipment present. Therefore, the materials in this room will be assumed to be similar as the adjacent rooms.

Table 3. AHERA Risk Assessment Summary for Building 1.

Homogenous Area(s) ‡ Material Description

TSI (T),

Surfacing(S) or Misc.(M)

Condition (Good=1, Poor=7)

Damage Assessment

(1 - 7) *

Potential For

Future Damage (High, Mod., Low)

Friable Rating

(Yes/No)

12”x12” light brown/beige/tan/white/peach/light pink resilient floor tiles

M 2 6 Mod. No

Black mastic associated with the 12”x12” light brown/beige/tan/white resilient/peach/light pink floor tiles

M 2 6 Low No

3 12”x12” yellow resilient floor tiles M 4 6 Mod. No

2 Black mastic associated with the 12”x12” yellow resilient floor tiles M 4 6 Low No

Black floor mastic w/ associated yellow/blue/green adhesive (under carpeting and/or faux wood)

M 2 6 Low No

16 Black pipe insulation T 3 6 Low No

4 9”x9” green resilient floor tile M 2 6 Mod. No

2 Black mastic associated with the 9”x9” green resilient floor tiles M 2 6 Low No

5 9”x9” red & red/brown resilient floor tile M 2 6 Mod. No

2 Black mastic associated with the 9”x9” red resilient floor tiles M 2 6 Low No

2 Black mastic associated with the 12”x 12” maroon resilient floor tiles M 2 6 Low No

6 Beige vinyl sheet flooring w/ small square pattern M 3 6 Mod. No

9 Black wall mastic waterproofing/vapor sealant M 2 6 Mod. No

15 Gray HVAC/Fan sealant M 4 6 Mod. No

Homogenous Area(s) ‡ Material Description

TSI (T),

Surfacing(S) or Misc.(M)

Condition (Good=1, Poor=7)

Damage Assessment

(1 - 7) *

Potential For

Future Damage (High, Mod., Low)

Friable Rating

(Yes/No)

12 Tan/white/beige door sealant M 2 6 Mod. No

14 Gray exterior window sealant on Penthouse M 2 6 Mod. No

13 Exterior door sealant on Penthouse M 2 6 Mod. No

11 Brown/orange sealant/felt M 2 6 Mod. No

17 12” TSI pipe w/green wrap T 6 1 High Yes

Black mastic associated with the gray

VSF & gray underlayment/gray 12”x12” VFT

M 2 6 Low No

18 4” TSI pipe w/beige wrap T 4 1 High Yes

10 Transite exhaust pipe w/ silver paint M 3 6 Mod. No

8 Tan wall tile grout M 2 6 Low No

19 4” & 8” TSI pipe w/blue/gray wrap T 4 1 Mod. Yes

2 Black mastic associated with the 12”x12” light pink resilient floor tiles M 2 6 Low No

7 Beige floor leveling compound M 2 6 Low No

2 Black mastic associated with the 9”x9” red/brown resilient floor tiles M 2 6 Low No

20 4” TSI pipe w/silver wrap T 4 1 High Yes

Homogenous Area(s) ‡ Material Description

TSI (T),

Surfacing(S) or Misc.(M)

Condition (Good=1, Poor=7)

Damage Assessment

(1 - 7) *

Potential For

Future Damage (High, Mod., Low)

Friable Rating

(Yes/No)

21 Gray/black duct wrap T 4 6 Mod. No

Black mastic associated with the light pink resilient sheet floor w/ green specks

M 2 6 Low No

22 12”x12” gray resilient floor tiles M 3 6 Mod. No

23 Black sink undercoat M 3 6 Low No

24 Tan resilient sheet flooring (below light blue VSF) M 3 6 Mod. No

25 Light blue resilient sheet flooring M 3 6 Mod. No

2 Black mastic associated with the Light blue resilient sheet flooring M 2 6 Low No

26 White wall texture/plaster S 1 6 Mod. No

27 Elevator brake pads (Assumed ACM) M 3 6 High No

28 Gray transite panels in fume hoods (~3 hoods) M 3 6 Mod. No

*Damage Assessment Categories: Damaged or Significantly Damaged Friable TSI=1; Damaged Friable Surfacing Material=2;

Significantly Damaged Friable Surfacing Material=3; Damaged or Significantly Damaged Friable Misc. Material=4; ACM w/ potential for significant damage=5; ACM w/ potential for damage=6; Any remaining friable ACM or assumed friable ACM=7.

‡Please refer to the drawings for the homogenous area (HA#) locations.

Table 4. NESHAP Summary for Building 1.

Material Description Sample Locations Asbestos Type

Concentration

RACM/Cat.I/

Cat. II*

Quantity of ACM**

12”x12” light brown/beige/tan/white/ peach/light pink resilient floor tiles, Sample #121004-417, 508;

121005-487(1), 487(2), 497(1), 497(2); #121002-

445A, 446A, 447A;

#121001-437, 438;

#121003-431

W114 (E), E105, W309

(NE & S), W600,

W601A, W601B, E200A1

<1-3%

Chrysotile†

I ~8,684 ft2

Black mastic associated with the 12”x12” light brown/beige/tan/white/p each/light pink resilient floor tiles, Sample #121004-417, 508;

#121015-821, 825, 826;

121005-461, 462, 469, 487, 497, 528, 530; #121002- 437A; #121001-422, 423;

#121002-445A, 446A, 447A; Sample #121001- 425, 426; #121003-431

W114 (E), E105, WB112A (W), EB118

(W), EB118 (E), E307,

E312 (N), W309 (NE

& S), E303F (NE &

SE), W500 hall, alcove @ W710 (under carpet), alcove @ E706 (under carpet) W600, W601A, W601B, E716 (N & S), E200A1

<1-12%

I ~81,133 ft2

12”x12” yellow resilient floor tiles, Sample

#121017-3019, 3020

E400 (SE & SW)

(Only noted in this area)

6% Chrysotile

I ~9 ft2 with the 12”x12” yellow resilient floor tiles, Sample #121017-3019, 3020

E400 (SE & SW)

4% Chrysotile

I ~9 ft2

Material Description Sample Locations Asbestos Type

Black floor mastic w/ associated yellow/blue/green adhesive (under carpeting and/or faux wood), Sample #121004-428, 431, 439, 440; #121016-512, 513, 525; #121015-835;

#121005-537; #121002-

442A, 443A, 444A;

#121001-403, 432

SPW 113-1 (W), SPW

113-1 (E), W 107

Consult, Hall E118, Hall E116A, WB110, E310 (S), W600, Hall

@ W717, E712 (NW)

<1 - 12%

I ~13,248 ft2

Black pipe insulation, Sample #121004-461, 462

SPE 205A-1 (SE) &

(SW)

<1% Chrysotile†

I ~116 lf

9”x9” green resilient floor tile; Sample #121016-501, 502; #121002-457A, 458A; #121001-417, 420, 456; #12101-801

E108D (NW), E108C

(N), W613 (N), W613A-1, W700, W702, W715, WB117

5-10% Chrysotile I ~2,889 ft2

Black mastic associated with the 9”x9” green resilient floor tiles; Sample #121015-801, 804;

#121002-457A, 458A;

#121001-417, 420;

#121001-456; #12101-801

WB117 (SE), B117 (S),

W613 (N), W613A-1, W700 (SW-under carpet), W702 (N-under carpet), W715, WB117

<1-10% Chrysotile†

I ~2,889 ft2

9”x9” red resilient floor tile, Sample #121016-503, E116 (W), E107 (S) 7% Chrysotile I ~1,690 ft2

Black mastic associated with the 9”x9” red resilient floor tiles, Sample #121016-503, 504

E116 (W), E107 (S) 10% Chrysotile I ~1,690 ft2

Material Description Sample Locations Asbestos Type with the 12”x 12” maroon resilient floor tiles, Sample

#121015-822A

WB-106

<1% Chrysotile†

I ~2,616 ft2

Beige vinyl sheet flooring w/ small square pattern, Sample #121015-829 WB103B (SE) 20% Chrysotile

I ~57 ft2

Black wall mastic waterproofing/vapor sealant; Sample #121015- 853, 854, 855, 915;

#121002-462A, 463A;

#121017-3049, 3050, 3051

E427-1 (SE), E417-1

(SW), E417-1 (SE)

8% Chrysotile I ~760 ft2

Gray HVAC/Fan sealant, Sample #121015-911, 912

WB118C (Only noted in this area)

5% Chrysotile I ~14 ft2

Tan/white/beige door sealant, Sample #121017-

W215DRR (S) 30% Chrysotile

I ~1 ft2

4” Beige/brown TSI, Sample #121017-511 W215 45% Chrysotile

RACM ~10,248 lf‡

Gray exterior window sealant on Penthouse, Sample #121005-418, 419 Penthouse elevator mechanical room

5% Chrysotile I ~7 ft2

Exterior door sealant on Penthouse, Sample

#121005-420, 424, 427

Roof access door @ stairwell, Penthouse elevator mechanical room

4-6% Chrysotile I ~6 ft2

Elevator brake pads on Penthouse

Penthouse elevator mechanical room Assumed I ~8 pads

Material Description Sample Locations Asbestos Type

Brown/orange sealant/felt, Sample

#121002-410A SB5-1@ air handler base 7% Chrysotile

I ~12 ft2

12” TSI pipe w/green wrap, Sample #121002-

431 & 432 SB4 Mechanical room

(SW)

15% Chrysotile 20%Amosite RACM ~15 lf

Black mastic associated with the gray VSF & gray underlayment/gray 12”x12” VFT; Sample

#121002-409A, #121005- 470; #121016-525, #121015-808, 812, 813, 815, 816, 818, 820;

#121017-507; #121001- 439, 440

W519, Hall @ E116A, E312 (S), WB116 (N), EB105B-1(SE), EB105

(SE), WB112A (W),

WB119 (NE), WB118

(N), EB105B-1 (NW),

W208 (SW), E701 (S),

E703 (SW)

<1-12%

I ~2,717 ft2

Residual TSI pipe w/ beige wrap, Sample

#121002-466A W613A-1 (SW) 15% Chrysotile

20% Amosite RACM ~1 lf

Transite exhaust pipe w/ silver paint; Sample

#121002-487A, 488A

West roof, adjacent to 6th floor bioengineering offices (center)

25% Chrysotile 3% Crocidolite II ~15 lf

Tan wall tile grout; Sample #121001-407 NW Hall @ W711 8% Chrysotile

I ~880 ft2

4” & 8” TSI pipe w/blue/gray wrap, Sample #121001-408; #121003-

436, 458

E723 Ceiling/wall space (N), E213 (SW), E211 (SE)

70% Chrysotile RACM ~10,248 lf‡

Beige floor leveling compound; Sample #121001-437, 438

W714 (SW) <1% Chrysotile† I ~12 ft2

Material Description Sample Locations Asbestos Type

9”x9” red/brown resilient floor tile, Sample

#121001-450, 455, 457

W717 (NW), W713

(SW), W709 (NW)

7-10% Chrysotile I ~1,690 ft2

Black mastic associated with the 9”x9” red/brown resilient floor tiles, Sample

#121001-450, 457

W717 (NW), W709

(NW)

5-7% Chrysotile I ~1,690 ft2

4” TSI pipe w/silver wrap, Sample #121001-462 W711A (S) 15-20%

Chrysotile RACM ~2 lf

Gray transite panels in fume hoods (~3 hoods) W215 Assumed II ~144 ft2

Gray/black duct wrap, Sample # 121018-3001, North exterior pipe chase (W), on 12” duct 10% Chrysotile I ~5 lf

Black mastic associated with the light pink resilient sheet floor w/ green specks, Sample #121018-

3009, 3010

E302B (SE), E302G

(NW)

7% Chrysotile I ~467 ft2

12”x12” gray resilient floor tiles, Sample

#121003-429 E200A2, <1-8% Chrysotile I ~1,440 ft2

Black sink undercoat, Sample #121003-439 E218 2% Chrysotile I ~35 ft2

Tan resilient sheet flooring (below light blue VSF), Sample #121003-449

E218 20% Chrysotile I ~756 ft2

Light blue resilient sheet flooring, Sample #121003-

E220 20% Chrysotile I ~625 ft2

Material Description Sample Locations Asbestos Type

White wall texture/plaster, Sample #121003-407 E200A (wall at stairs) <1% Chrysotile I ~26 ft2

*Indicates condition of material at the time of sampling. Category I and II Material may become friable and, thus, a Regulated Asbestos-Containing Material depending on the method of removal or potential for future damage. Material should be re-evaluated at the time of any project impacting these ACMs.

**Quantities are approximate. These materials should be field verified prior to the start of any project impacting these ACMs.

Quantity Units: ft2=square feet, lf=linear feet, cf=cubic feet

†All samples that have a result of <1% are considered to be ACM, until point counted.

‡The quantities for the 4” beige and the 4” blue/gray TSI pipes are estimates based on the riser schematics provided. These two types of TSI were noted throughout various areas of Building 1. Included in this estimate are some areas in the ceiling plenums where this material was observed.

Building 2 – Boiler Plant

Building No. 2 is the facility Boiler Plant which includes the access point for the subterranean pipe chase. The building is 5,621 ft2 in size and was built in 1949. A total of one-hundred-five (105) samples were collected for Building 2, including layers. The construction materials sampled in Building 2 include:

• Ceiling and Wall Plaster Systems

• Flooring Mastics, Sealants, Paints

• Exterior Stucco and Concrete Systems

• Exterior Window Glazing

• Exterior Caulking Systems and

Various Sealants

• Sink undercoating

• Cementitious Wall Panels on the Roofs on the Parapet Wall

• Roofing Penetration Mastics

• Roofing Field Sheet Materials

• HVAC Mastics and Tapes

• Pipe Gaskets

• Thermal System Insulations

Note: There were no inaccessible areas in Building 2.

Table 5. AHERA Risk Assessment Summary for Building 2.

‡Homogenous Area(s)

Material Description

TSI (T),

Surfacing(S) or Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

(Yes/No)

HA1 White TSI pipe insulation T 3 5 Mod. Yes

HA2

Gray/green pipe flange gasket M 2 6 Low No

HA3 Tan gasket M 2 6 Low No

HA4 Transite pipe T 4 5 Mod. No

HA5 (Sub-grade pipe chases servicing buildings 1, 10, 12, 13 and 14)

TSI Pipe insulation

(non-fiberglass)

T 5 5 Mod. Yes

*Damage Assessment Categories: Damaged or Significantly Damaged Friable TSI=1; Damaged Friable Surfacing Material=2;

Significantly Damaged Friable Surfacing Material=3; Damaged or Significantly Damaged Friable Misc. Material=4; ACM w/ potential for significant damage=5; ACM w/ potential for damage=6; Any remaining friable ACM or assumed friable ACM=7.

Table 6. NESHAP Summary for Building 2.

Material Description Sample Location Asbestos Type &

RACM/Cat.

I*/Cat. II*

White TSI pipe insulation, Sample #507-510

Boiler room (B) on top of the northwest restroom adjacent to the north wall and at each of the three boiler flues in Boiler room

(A)

20% Chrysotile

10% Amosite RACM ~110 lf

Gray/green pipe flange gasket, Sample #522

Boiler rooms (A & B) along the north and middle wall

30% Chrysotile I ~64

Tan gasket, Sample #528 Boiler room (A) at the boiler flue flanges

30% Chrysotile I ~3

Transite pipe, Assumed Boiler room (A)/Roof on the interior of the boiler exhaust pipes

Assumed II ~60 lf

TSI Pipe insulation (non-fiberglass)

Sub-grade pipe chases servicing buildings 1, 10, 12, 13 and 14.

Assumed RACM ~2,592 lf

*Indicates condition of material at the time of sampling. Category I and II Material may become friable and, thus, a Regulated Asbestos-Containing Material depending on the method of removal or potential for future damage. Material should be re-evaluated at the time of any project impacting these ACMs.

**Quantities are approximate. These materials should be field verified prior to the start of any project impacted these ACMs.

Quantity Units: sf=square feet, lf=linear feet, cf=cubic feet

Building 3 – Engineering Building

Building No. 3 is the Engineering Building. The building is 7,863 ft2 in size and was built in 1949. A total of one-hundred-twenty-five (125) samples were collected for Building 3, including layers. The construction materials sampled in Building 3 include:

• Ceiling and Wall Plaster Systems

• Flooring Mastics, Sealants, Paints

• Exterior Stucco and Concrete Systems

• Exterior Window Glazing

• Exterior Caulking Systems and Various Sealants

• Acoustical ceiling materials

• Sink under coatings

• Roofing Penetration Mastics

• HVAC Mastics and Tapes

• Cement Panel Floor Board

Note: There were no inaccessible areas for Building 3.

Table 7. AHERA Risk Assessment Summary for Building 3.

‡Homogenous Area(s)

Material Description

TSI (T),

Surfacing(S) or Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future Damage

(High, Mod., Low)

Friable Rating

(Yes/No)

HA1

Joint compound associated with the drywall system M 2 6 Mod. No

HA1

Drywall system material composite analysis

M 2 6 Mod. No

HA2 Beige 9”x9” vinyl floor tile M 5 6 Mod. No

HA2

Black mastic associated with the beige 9”x9” vinyl floor tile

M 5 6 Low No

*Damage Assessment Categories: Damaged or Significantly Damaged Friable TSI=1; Damaged Friable Surfacing Material=2;

Significantly Damaged Friable Surfacing Material=3; Damaged or Significantly Damaged Friable Misc. Material=4; ACM w/ potential for significant damage=5; ACM w/ potential for damage=6; Any remaining friable ACM or assumed friable ACM=7.

Table 8. NESHAP Summary for Building 3.

Joint compound associated with the drywall system, Sample #5113A, 5114

Northwest and southwest areas of the hall ceiling plenum adjacent to rooms 6-3 through 13-3

3% Chrysotile I ~544 ft2

Drywall system material composite analysis, Sample

#5113B, 5114

Northwest and southwest areas of the hall ceiling plenum adjacent to rooms 6-3 through 13-3

<1% Chrysotile† I ~544 ft2

Beige 9”x9” vinyl floor tile, Sample #5148

Plumbing office 14A-3, Engineering offices

18B-3 & 18A-3

2% Chrysotile I ~449 ft2

Black mastic associated with the beige 9”x9” vinyl floor tile, Sample # 504 &

5148A

Plumbing office 14A-3, Engineering offices

18B-3 & 18A-3

5-7% Chrysotile I ~449 ft2

*Indicates condition of material at the time of sampling. Category I and II Material may become friable and, thus, a Regulated Asbestos-Containing Material depending on the method of removal or potential for future damage. Material should be re-evaluated at the time of any project impacting these ACMs.

**Quantities are approximate. These materials should be field verified prior to the start of any project impacted these ACMs.

Quantity Units: ft2=square feet, lf=linear feet, cf=cubic feet †All samples that have a result of <1% are considered to be ACM, until point counted.

Building 4 – Pump Chlorinator & Emergency Generator

Building No. 4 is the Pump Chlorinator & Emergency Generator. The building is 537 ft2 in size and was built in 1949. A total of three (3) samples were collected for Building 4, including layers. The construction materials sampled in Building 4 include:

• Exterior Caulking Systems and Various Sealants

• Transite Exterior & Interior Wall Panels, Transite Roof

Note: There were no inaccessible areas for Building 4.

Table 9. AHERA Risk Assessment Summary for Building 4.

Area(s)

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

(Yes/No)

Walls, roof and siding

Transite walls, roof and siding M 3 6 Mod. No

*Damage Assessment Categories: Damaged or Significantly Damaged Friable TSI=1; Damaged Friable Surfacing Material=2;

Significantly Damaged Friable Surfacing Material=3; Damaged or Significantly Damaged Friable Misc. Material=4; ACM w/ potential for significant damage=5; ACM w/ potential for damage=6; Any remaining friable ACM or assumed friable ACM=7.

‡Please refer to the drawings for the homogenous area (HA#) locations.

Table 10. NESHAP Summary for Building 4.

Transite walls, roof and siding Walls, roof and siding

Assumed

II ~1,834 ft2

*Indicates condition of material at the time of sampling. Category I and II Material may become friable and, thus, a Regulated Asbestos-Containing Material depending on the method of removal or potential for future damage. Material should be re-evaluated at the time of any project impacting these ACMs.

**Quantities are approximate. These materials should be field verified prior to the start of any project impacted these ACMs.

Building 5 – Pump House

Building No. 5 is the Pump House. The building is 220 ft2 in size and was built in 1949. A total of thirteen (13) samples were collected for Building 5, including layers. The construction materials sampled in Building 5 include:

• Exterior Stucco and Concrete Systems

• Exterior Window Glazing

• Exterior Caulking Systems and

Various Sealants

• Roofing Penetration Mastics

• Roofing Field Sheet Materials

Note: There were no inaccessible areas for Building 5.

Table 11. AHERA Risk Assessment Summary for Building 5.

Area(s)

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

(Yes/No)

Roof Black roof penetration mastic M 2 6 Low No

Northwest wall Black wall penetration gasket

M 3 6 Mod. No

*Damage Assessment Categories: Damaged or Significantly Damaged Friable TSI=1; Damaged Friable Surfacing Material=2;

Significantly Damaged Friable Surfacing Material=3; Damaged or Significantly Damaged Friable Misc. Material=4; ACM w/ potential for significant damage=5; ACM w/ potential for damage=6; Any remaining friable ACM or assumed friable ACM=7.

Table 12. NESHAP Summary for Building 5.

Black roof penetration mastic, Sample #507

Located at the roof vent(s) 20% Chrysotile I ~16 ft2

Black wall penetration gasket, Sample #513

Located in the northwest corner 5% Chrysotile I ~1

*Indicates condition of material at the time of sampling. Category I and II Material may become friable and, thus, a Regulated Asbestos-Containing Material depending on the method of removal or potential for future damage. Material should be re-evaluated at the time of any project impacting these ACMs.

**Quantities are approximate. These materials should be field verified prior to the start of any project impacted these ACMs.

Building 6 – Disposal Well

Building No. 6 is the Disposal Well. The building is 5 ft2 in size and was built around 1949. There no samples collected for this building. The construction materials visually assessed in Building 6 include:

• Terra-cotta Piping

• PVC Pipe

• Cementitious Drain Pipe

• Cementitious slurry/fill

Note: Building 6 is listed as a building; however, it is an underground disposal well. A visual inspection was performed during the assessment which included opening of the hatch to the well. It appears the well has been partially filled. There is enough room for a person to enter the space. This area should be furthered assessed by Fresno VA personnel for entry into the confined space program and/or the well should be completed filled.

Table 13. AHERA Risk Assessment Summary for Building 6.

Area #

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

(Yes/No)

N/A N/A N/A N/A N/A N/A N/A

Table 14. NESHAP Summary for Building 6.

N/A N/A

No suspect ACM was noted at the time of the survey

Building 7 – Gasoline Pump & Tank

Building No. 7 is the Gasoline Pump and Tank. The building is 2,073 ft2 in size and was built in 1977. There were no samples collected for this building. The construction materials visually assessed in Building 7 include:

• Sheet Metal Roofing

• Metal Structural Beams

• Chain-link Fencing w/ Vinyl Inserts

Note: There were no inaccessible areas in Building 7.

Table 15. AHERA Risk Assessment Summary for Building 7.

Area #

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

Table 16. NESHAP Summary for Building 7.

Building 8 – Storage Shed

Building No. 8 is a Storage Shed. The building is 400 ft2 in size and was built in 1977. There were no samples collected for this building. The construction materials were visually assessed in Building 7 includes:

Note: There were no inaccessible areas for this building.

Table 17. AHERA Risk Assessment Summary for Building 8.

Area #

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

Table 18. NESHAP Summary for Building 8.

Building 15 – Recreational Storage Shed

Building No. 15 is the Recreational Storage Shed. The building is 250 ft2 in size. There were no samples collected for this building. The construction materials visually assessed in Building 7 include:

• Sheet Metal Roof and Siding • Metal Structural Beams

Table 19. AHERA Risk Assessment Summary for Building 15.

Area #

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

Table 20. NESHAP Summary for Building 15.

Building 16 – Storage Building

Building No. 16 is the Storage Building. The building is 1,118 ft2 in size and was built in 1949. A total of nineteen (19) samples were collected for Building 16, including layers. The construction materials sampled in Building 16 include:

• CMU Wall Grout

• Exterior Stucco and Concrete Systems

• Roofing Penetration Mastics

Note: There were no inaccessible areas of this building.

Table 21. AHERA Risk Assessment Summary for Building 16.

Area(s)

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

(Yes/No)

Roof Black fibrous tar roofing material

M 2 6 Low No

*Damage Assessment Categories: Damaged or Significantly Damaged Friable TSI=1; Damaged Friable Surfacing Material=2;

Significantly Damaged Friable Surfacing Material=3; Damaged or Significantly Damaged Friable Misc. Material=4; ACM w/ potential for significant damage=5; ACM w/ potential for damage=6; Any remaining friable ACM or assumed friable ACM=7.

Table 22. NESHAP Summary for Building 16.

Black fibrous tar roofing material, Sample #527

Located in the roof field 40% Chrysotile I ~1,051 ft2

*Indicates condition of material at the time of sampling. Category I and II Material may become friable and, thus, a Regulated Asbestos-Containing Material depending on the method of removal or potential for future damage. Material should be re-evaluated at the time of any project impacting these ACMs.

**Quantities are. These materials should be field verified prior to the start of any project impacted these ACMs. Quantity Units:

ft2=square feet, lf=linear feet, cf=cubic feet

Building 17 – Liquid Oxygen Tank

Building No. 17 is the Liquid Oxygen Tank. The building is 640 ft2 in size. A total of three (3) samples were collected for Building 17, including layers. The construction materials sampled in Building 17 include:

• Roofing Penetration Sealants

Table 23. AHERA Risk Assessment Summary for Building 17.

Area(s)

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

Table 24. NESHAP Summary for Building 17.

was detected at the time of the

Building 18 – OP Parking Lot HC Elevator

Building No. 18 is the OP Parking Lot HC Elevator. The building is 254 ft2 in size and was built in 1987. A total of nineteen (19) samples were collected for Building 18, including layers. The construction materials sampled in Building 18 include:

Various Sealants

• Sheet Metal Overhang with Structural

Steel

• Roofing Penetration Mastics

• Resilient Floor Covering

Table 25. AHERA Risk Assessment Summary for Building 18.

Area(s)

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

Table 26. NESHAP Summary for Building 18.

No ACM was detected at the

Building 19 – Electric Utility Area

Building No. 19 is the Electric Utility Area. The building is 2,401 ft2 in size and was built in 1949. A total of three (3) samples were collected for Building19, including layers. The construction materials sampled in Building 19 include:

• Sheet Metal Walls and Roof • Exterior Caulking Systems and Various Sealants

Table 27. AHERA Risk Assessment Summary for Building 19.

Area(s)

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

Table 28. NESHAP Summary for Building 19.

I N/A

Building 22 – Chiller Plant

Building No. 22 is the Chiller Plant. The building is 2,492 ft2 in size and was built in 1978. A total of twenty-five (25) samples were collected for Building 22, including layers. The construction materials sampled in Building 22 include:

Various Sealants

• Roofing Penetration Mastics

• Roofing Field Sheet Materials

• HVAC Mastics

Table 29. AHERA Risk Assessment Summary for Building 22.

Area(s)

Material Description

TSI

(T)/Surfacing (S)/Misc.(M)

Condition (Good=1, Poor=7)

*Damage Assessment

(1 - 7)

Potential For Future

Damage (High, Mod., Low)

Friable Rating

Table 30. NESHAP Summary for Building 22.

Building 24 – VA Medical Education Center & Library

Building No. 24 is the VA Medical Education Center & Library. The building is 41,231ft2 in size and was built in 1981. A total of two-hundred-ninety-nine (299) samples were collected for Building 24, including layers. The construction materials sampled in Building 24 include:

• Window Sealants

• Ceramic Tile Wall/Floor Systems

• Ceiling and Wall Plaster Systems

• Flooring Mastics, Compounds, Sealants, Paints

• Exterior Stucco and Concrete Systems

• Exterior Window Glazing

• Acoustical Ceiling Material

• Sink Undercoatings

• Countertop Adhesive

• Exterior Caulking Systems and Various Sealants

• Fiberboard

• Roofing Penetration Mastics

• Roofing Field Sheet Materials

• HVAC Mastics and Tapes

• Pipe Gaskets

• Transite…