About this file

This document is an Amendment (0004) to a Design-Build construction solicitation for the Department of Veterans Affairs (VA) at the Fresno VA Medical Center. The project involves installing tieback roof anchors in Building 1, with a total small business set-aside specifically for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The solicitation (36C26126R0003) covers a 240-calendar day performance period for furnishing design, labor, materials, and engineering services to complete roof anchor installation, with a project number of 570-26-611.

The amendment extends the Phase I proposal due date from December 11, 2025, to December 16, 2025, at 2:00 PM PST, and includes attachments such as As-Built Drawings, a Revised Design-Build Statement of Work, an Asbestos Survey, and RFI Responses. The estimated project value falls between $250,000 and $500,000, with the NAICS code 236220 for Commercial and Institutional Building Construction. The solicitation will be awarded using FAR Part 15 Trade-off Process and FAR Part 36 Two-Phase Design-Build Selection Procedures, with the place of performance located at 2615 East Clinton Avenue, Fresno, California.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-05-2025 570-26-611 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21

36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21

To all Offerors/Bidders

36C26126R0003

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 12-16-2025 2:00 PM PST A. The purpose of this amendment is to provide responses to the RFIs. Phase I proposal due date has been extended from December 11, 2025 to Tuesday, December 16, 2025 by 2:00 PM PST.

B. Attachments As-Build Drawings - Tiebacks Merged, Revised DB SOW Fresno VA_B1 Tieback_R1, VA Fresno ACM Survey Asbestos Study, and RFI Responses FRE Anchor Tie Downs 20251205 are attached to this amendment for reference.

C. Phase I Proposal is due on Tuesday, December 16, 2025 by 2:00 PM. PST.

D. All other terms and conditions remain unchanged and in full force and effect.

Daniel Jhun Contracting Officer Amendment 0004:

A. The purpose of this amendment 0004 is to provide response to the RFIs. Phase I proposal due date has been extended from December 11, 2025 to Tuesday, December 16, 2025 by 2:00 PM PST.

B. Attachments As-build Drawings – Tiebacks Merged, Revised DB SOW Fresno VA_B1 Tieback_R1, VA Fresno ACM Survey Asbestos Study, and RFI Responses FRE Anchor Tie Downs 20251205 are attached to this amendment for reference.

C. Phase I Proposal is due on Tuesday, December 16, 2025 by 2:00 PM. PST.

D. All other terms and conditions remain unchanged and in full force and effect.

See attached document: RFI Responses FRE Anchor Tie Downs 20251205.

See attached document: DB SOW Draft_Fresno VA_B1 Tiebacks _R1.

See attached document: As-built Drawings - Tie backs Merged.

See attached document: VA Fresno ACM Survey Asbestos Study_20251205.

File details come from the government source that posted it. Updated .