Attachment_B_Performance_Record.pdf
PDF 350 KB Posted
- Attached to
- Cooling Tower Water Treatment Services
- Solicitation number
- IFB 27-FMD-013
- Issued by
- Maricopa County, Phoenix City, Arizona
About this file
This is a Performance Record Assessment document for the City of Phoenix's Cooling Tower Water Treatment Services contract. The contract encompasses comprehensive water treatment and cooling tower maintenance services for the City's chilled and hot water systems, including the Phoenix City Hall Thermal Storage Reservoir. Key service requirements include weekly electronically generated service reports with water testing results, minimum weekly on-site service visits with field analysis, monthly testing on chilled water loops and closed loops, semi-annual cleaning of cooling towers, and deployment of bore scope technologies with photographic documentation as needed. Additional deliverables include annual efficiency monitoring reports, equipment inspection and documentation reports with digital images, comprehensive chemical testing programs with written procedures and summary charts, and Safety Data Sheets for all first-time chemical orders. The contract specifies that closed systems must utilize non-chromate protective film-forming treatment for corrosion prevention, with excessive tower scale accumulations requiring remediation within 48 hours of discovery. The agreement term is three years commencing on or about October 1, 2026, with two one-year extension options exercisable at the City's discretion.
The Performance Record Assessment document serves as an evaluation tool for monitoring contractor compliance with the specified Statement of Work requirements across multiple performance categories. The document identifies specific contract sections applicable to performance monitoring, including sections 3.4, 3.5.1, 3.7.2, 3.7.3, 3.10.1.2, 3.10.1.4, 3.10.1.9, 3.12, 3.16, and 3.20. The assessment framework categorizes performance results as either completed per contract specifications, completed with deficiencies, or not completed, with space for monitor comments documenting contractor compliance and any issues requiring remediation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B - Section 2A: Performance Record
CONTRACTOR PERFORMANCE RECORD ASSESSMENT PERIOD:
Contract Monitor:
Contract Manager:
Contract Administrator:
Section III – Statement of Work: 3.4; 3.5.1; 3.7.2; 3.7.3; 3.10.1.2; 3.10.1.4; 3.10.1.9; 3.12; 3.16; 3.20
Contract Requirement
Monitor Frequency
Result Comments
Completed per contract
Completed with deficiencies
Not Completed
Closed systems chemical shall be non-chromate protective film forming treatment for the prevention of corrosion in chilled & hot water systems
Provide weekly electronically generated service report to BEO and other personnel as designated consisting of water testing results & system conditions
Conduct service visits & perform field analysis a minimum of once per week
Perform monthly test on chilled water loops, closed loops & Phoenix City Hall Thermal Storage Reservoir
Cooling towers to be cleaned in their entirety 2 times per calendar year
Remediating excessive tower scale accumulations to be completed within 48 hours of discovery
Must be capable of deploying bore scope technologies, provide pictures & report analysis to PWD as needed
Annual efficiency monitoring report; Equip.
inspection & documentation reports, digital images for critical equip. as needed
Provide comprehensive chemical testing prog.
With written instructions & test procedures for all control tests, and a summary chart
Provide an SDS for all first-time orders