Attachment B LCPS INTERCOM MODIFICATIONS BID FORM.xls
XLS spreadsheet 37 KB Posted
- Attached to
- School Intercoms Systems Modifications
- Solicitation number
- RFP LCP 180000003110 1
- Issued by
- Macomb County, Michigan
About this file
This is a bid form for intercom system modifications for L'Anse Creuse Public Schools (LCPS). The project encompasses modifications to three different intercom system types: Rauland Telecenter ICS, Dukane MCS350, and Telecore systems across multiple school buildings. The Rauland modifications involve four buildings—Atwood Elementary, Marie C. Graham Elementary, L'Anse Creuse High School, and Middle School-North—with a total of 18 strobes needed across gymnasiums, cafeterias, choirs, bands, commons areas, and pools. The Dukane MCS350 modifications encompass twelve buildings including elementary schools, high schools, and middle schools, requiring a total of 30 strobes distributed across similar facility types. The Telecore modifications apply to one location, Frederick V. Pankow Center, with five strobes needed for auto shops, commons, and trades building areas. Units are designated as either floor or wall-hung installations in various room locations including media centers, offices, and main office work rooms.
Bidders are required to provide itemized pricing for each system modification category, breaking costs into materials/parts, labor, installation, and other costs, with separate total cost calculations for each system type (Rauland, Dukane, and Telecore) as well as a grand total for the entire project. The bid form provides no specified response deadline, contract term, or funding source information within the document itself.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dukane MCS350 Maps.pdf | ||
| Telecore Maps.pdf | ||
| Rauland Telecenter ICS Maps.pdf | ||
| Attachement A LCPS modification to PA specifications.pdf | ||
| LCPS District Map.pdf | ||
| RFP-School Intercoms Systems Modifications.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment B | |||||||||||
| L'ANSE CREUSE PUBLIC SCHOOLS INTERCOM MODIFICATION BID FORM | |||||||||||
| BIDDER: | |||||||||||
| BUILDING NAME | # | MODEL OF EXSISTING PA | LOCATION | TYPE OF UNIT | STROBES NEEDED | ROOM LOCATIONS | RAULAND TELECENTER ICS MODIFICATIONS | GRAND TOTAL FOR ENTIRE PROJECT | |||
| Price for all materials /parts | Labor Installation cost: | Other costs: | TOTAL COST FOR RAULAND MODS | $ _______________________________ | |||||||
| Atwood Elementary | 1 | Rauland Telecenter ICS | MDF Room | Floor Unit | 2 | (1) Gym - (1) Cafeteria | |||||
| Marie C. Graham Elementary | 2 | Rauland Telecenter ICS | MDF Room | Floor Unit | 2 | (1) Gym - (1) Cafeteria | |||||
| L’Anse Creuse High School | 3 | Rauland Telecenter ICS | MDF Room | Floor Unit | 9 | (3) Large Gym - (1) Small Gym (1) Cafeteria -(1) Choir - (1) Band - (1) Commons - (1) Pool | |||||
| Middle School - North | 4 | Rauland Telecenter ICS | Main Office Work Room | Floor Unit | 5 | (1) Gym - (1) Cafeteria -(1) Choir - (1) Band - (1) Commons | |||||
| $ ______________ | $ ______________ | $ ______________ | $ _________________________ | ||||||||
| DUKANE MCS350 MODIFICATIONS | |||||||||||
| Joseph M. Carkenord Elementary | 1 | Dukane MCS350 | Media Center Office | Floor Unit | 2 | (1) Gym - (1) Cafeteria | Price for all materials /parts | Labor Installation cost: | Other costs: | TOTAL COST FOR DUKANE MODS | |
| Green Elementary | 2 | Dukane MCS350 | Principal Conference Room | Wall Hung Unit | 2 | (1) Gym - (1) Cafeteria | |||||
| Francis A. Higgins Elementary | 3 | Dukane MCS350 | Office Storage | Floor Unit | 2 | (1) Gym - (1) Cafeteria | |||||
| High School - North | 4 | Dukane MCS350 | Main Office | Floor Unit | 8 | (3) Large Gym - (1) Cafeteria -(1) Choir - (1) Band - (1) Commons - (1) Pool | |||||
| Emma V. Lobbestael Elementary | 5 | Dukane MCS350 | Main Office Work Room | Wall Hung Unit | 2 | (1) Gym - (1) Cafeteria | |||||
| Middle School - Central | 6 | Dukane MCS350 | Main Office Work Room | Floor Unit | 4 | (1) Gym - (1) Cafeteria -(1) Choir - (1) Band | |||||
| Middle School - East | 7 | Dukane MCS350 | Office Storage | Floor Unit | 4 | (1) Gym - (1) Cafeteria -(1) Choir - (1) Band | |||||
| Middle School - South | 8 | Dukane MCS350 | Main Office | Floor Unit | 4 | (1) Gym - (1) Cafeteria -(1) Choir - (1) Band | |||||
| Dianne M. Pellerin Center | 9 | Dukane MCS350 | 2nd Floor IDF | Floor Unit | 1 | (1) Commons | |||||
| South River Elementary | 10 | Dukane MCS350 | MDF Room | Wall Hung Unit | 2 | (1) Gym - (1) Cafeteria | |||||
| Tenniswood Elementary | 11 | Dukane MCS350 | Main Office Work Room | Floor Unit | 2 | (1) Gym - (1) Cafeteria | |||||
| Donald J. Yacks Elementary | 12 | Dukane MCS350 | Main Office | Wall Hung Unit | 2 | (1) Gym - (1) Cafeteria | |||||
| $ ______________ | $ ______________ | $ ______________ | $ _________________________ | ||||||||
| TELECORE MODIFICATIONS | |||||||||||
| Frederick V. Pankow Center | 1 | Telecore | Main Office Work Room | Wall Hung Unit | 5 | (3) Auto Shops - (1) Commons - (1) Trades Building | Price for all materials /parts | Labor Installation cost: | Other costs: | TOTAL COST FOR TELECORE MODS | |
| $ ______________ | $ ______________ | $ ______________ | $ _________________________ |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .