Attachment A1-A2.docx

DOCX document 26 KB Posted

Attached to
FINAL SOLICITATION- Environmental Remediation Services for Rocky Mountain Arsenal
Solicitation number
W91CRB23R0005
Issued by

About this file

This solicitation package seeks proposals for environmental remediation services at the U.S. Army Rocky Mountain Arsenal. The resulting contract will have a 3-year base period and two 3-year option periods, utilizing an indefinite delivery/indefinite quantity task order arrangement of a cost plus incentive fee contract type with fixed price elements. Services required include operation and maintenance of water treatment plants, groundwater and surface water sampling and monitoring, landfill and cover maintenance, infrastructure and facilities maintenance, regulatory support, records management and reporting, land use compliance, environmental compliance, and non-routine requirements. Non-routine requirements involve activities beyond normal operation and maintenance such as engineering, demolition, and technical litigation support. The solicitation package includes attachments outlining other direct costs, small tools and consumables. Proposals must be submitted through the DoD Secure Access File Exchange website by 19 May 2023. The solicitation is set aside for small businesses under NAICS code 562910 with a size standard of 750 employees.

View the file

Other files

File Type Posted
W91CRB23R0005 Amendment 0004.pdf PDF
W91CRB23R0005 Amendment 0003.pdf PDF
W91CRB23R0005 Amendment 0002.pdf PDF
A22 Response to Industry Comments ERS RFP Amd 2.pdf PDF
A21 SF330-21.pdf PDF
Attachment A19 Response to Industry comments DRAFT RFP.pdf PDF
Attachment A22 Response to Industry Comments ERS RFP.pdf PDF
L1 RMA ERS Cost Model 052523.xlsx XLSX spreadsheet
W91CRB23R0005 Amendment 0001.pdf PDF
A20_Purchasing_System_Review_Form.xlsx XLSX spreadsheet
L60 - Quality Assurance Surveillance Plan.pdf PDF
Attachment A3 - Project Vehicles and Trailers 2023 04 04.pdf PDF
Attachment A11-A14.docx DOCX document
Attachment A4-A9.docx DOCX document
Attachment A19 Response to Industry comments.pdf PDF
Attachment A10.docx DOCX document
L61 - Contract Data Requirements List (CDRL) Forms.pdf PDF
L42 Service Contract Wage Determination 2015-5419 Rev23.pdf PDF
Attachment A16 SUMMARY OF EXPERIENCE FORM.docx DOCX document
L43 Davis Bacon Wage Determination CO20230002 Heavy.pdf PDF
L60 - Quality Assurance Surveillance Plan 2023 04 12.docx DOCX document
Attachment A17.docx DOCX document
Attachment A15.docx DOCX document
L62 - Government Furnished Property Management Plan.pdf PDF
L43 Davis Bacon Wage Determination CO20230015 Building.pdf PDF
W91CRB23R0005 RFP 8MAY23.pdf PDF
Attachment A18 - Government Furnished Property.pdf PDF
L1 RMA ERS Cost Model.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A1

Other Direct Costs

The Other Direct Costs (ODC) bid item covers all ODCs required to perform the work as described in the PWS. ODCs shall include the cost elements described below.

1. Communications Expenses, including all telephone costs, cell phones, radios, repeaters or other communications expenses.

2. Computer Expenses, including all required hardware, software, software licenses, internet and network expenses, and maintenance costs associated with establishing and maintaining required computer support for Contractor employee computer needs. Computers, software, and licenses required for Contractor operated computer systems (reference section C5.8.1), MP2 computerized maintenance management system, and those integral to water treatment plant operations (RSLogix and FactoryTalk) will be provided and/or reimbursed by the Government.

3. Postage, Express mail, courier and related services. Includes all postage, express mail, courier and related services required by the ERS to perform the work. The ODC rate shall not include the cost of services required to transmit documents on behalf of the Government.

4. Office Supplies and Office Equipment, including the cost of all office supplies and office equipment required to perform the work.

5. Furniture, including all office furniture required for personnel to perform the work. Most of the furniture currently being used in building 132 and in the treatment plants will remain. The ERS contractor may use this remaining furniture and supplement as needed.

6. Printing and Reproduction Services, including all printing services required in the normal conduct of business.

7. Publications, including the cost of publications necessary to perform the work.

8. Substance Abuse Deterrence and Detection, including all testing costs associated with pre-employment candidates, employees dismissed for cause, random screening, and post- rehabilitation follow-up.

9. Training, Seminars and Association Memberships, including costs associated with training, seminars, workshops, certifications and association membership dues.

10. Physicals and Medical Monitoring, including all costs associated with providing required physicals and necessary medical monitoring to meet standard industry and project requirements.

Attachment A2

Small Tools and Consumables

Small tools are defined as those tools required for the execution of the work and having a purchase value of less than $1,000.

Small tools shall include but not be limited to:

1. Hand tools including hammers, pliers, wrenches, knives, shovels, saws, axes, crow bars, conduit and tubing benders, tool and gang boxes, wheelbarrows, chains, cables, clamps, bolt cutters, post hole diggers, soldering iron, ladders, paint tools, measuring tapes, squares, rakes, screw drivers, pipe stands, saw horses, terminating tools, pipe and conduit threaders, cutting torches, sampling equipment and tools, hoisting tools and volt meters.

2. Power tools including drills, saws, fans and blowers, chargers, vacuum cleaners, grinders, welding machines and equipment, air compressors, sanders, conduit and pipe threaders.

Consumables are goods and materials consumed during the performance of the work and shall include, but not be limited to, the following:

1. Extension cords, solder, welding rod, rope, abrasive discs, gases (e.g. oxygen and acetylene), tape, adhesives, bits, batteries, brooms, brushes, fire extinguishers, sand paper, fuses, funnels, gloves, hose and fittings, nails, paint, welding wire, wire, health and safety consumables (Tyvek, hard hats, booties, respirators, high visibility vests, gloves, safety glasses, etc.).

Consumable Supplies shall not include the following:

1. Containers, tools, supplies and equipment associated with sampling activities. These items shall be purchased by the Contractor and reimbursed by the Government.

The Contractor shall leave remaining small tools and consumable inventory on site at the end of the contract.

File details come from the government source that posted it. Updated .