Attachment A-VIII Fort St Bridge.docx

DOCX document 23 KB Posted

Attached to
Bridge Operations-Fort Street Bridge
Solicitation number
RFP 591 200000001437 1
Issued by
Wayne County, Detroit City, Michigan

About this file

This is an attachment to RFP 200000001437 that provides operational instructions for the Fort St. Bascule Bridge, detailing procedures for traffic control gate malfunctions. The document outlines four primary malfunction scenarios and the corresponding response protocols that bridge operators must follow. When a gate remains upright in the open position, operators must request flagmen assistance or manually crank the gate down, block traffic with barricades or cones, reference the Panatrol Operating Manual, and complete a Bridge Malfunction Report. When a gate remains down in the closed position, operators must attempt to manually crank it up, notify the Project Manager, consult the operating manual, and complete required reports. If the "All Gates Closed" light fails to illuminate despite gates being closed, operators must reference the manual, notify the Project Manager, and file a malfunction report. When gates are damaged by traffic or weather events, operators must obtain driver and vehicle identification if applicable, immediately notify the Project Manager and local police, follow gate-open procedures if necessary, and complete both Vehicle Traffic Accident Reports and Bridge Malfunction Reports.

All procedures outlined in this attachment are mandatory requirements of the bridge operations contract, with the Project Manager responsible for notifying the Contract Administrator and Maintenance of any malfunctions requiring repair. Failure to follow these procedures or complete the appropriate documentation constitutes non-conformance of the Bridge Contract. The attachment references Attachment A-VII, the Panatrol Operating Manual for the Fort St. Bascule Bridge, as supporting documentation for specific operational bypasses and technical guidance needed to execute these malfunction response procedures.

View the file

Other files

File Type Posted
Attachment A-IV.docx DOCX document
Proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx DOCX document
Contract terms.docx DOCX document
Attachment A-III.docx DOCX document
Attachment A-I.docx DOCX document
Attachment A-VI.docx DOCX document
Attachment A-VII Fort St Bridge.pdf PDF
Schedule B Pricing.docx DOCX document
Attachment A-II.docx DOCX document
Schedule A-Statement of Work.docx DOCX document
Attachment A-V.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 200000001437

ATTACHMENT A-VIII

INSTRUCTIONS FOR TRAFFIC CONTROL GATE MALFUNCTIONS

A. GATE REMAINS UPRIGHT (OPEN)

1. Request flagmen assistance from the Project Manager and/or crank the gate down by hand.

2. Block traffic using barricades or cones prior to opening the spans.

3. Refer to ATTACHMENT A-VII “Panatrol Operating Manual for the Fort St. Bascule Bridge”, Bypasses (page 7 to 9).

4. Open bridge.

5. Close bridge.

6. Remove cones or barricades.

7. Refer to ATTACHMENT A-VII “Panatrol Operating Manual for the Fort St. Bascule Bridge”, Bypasses (page 7 of 9).

8. Complete Bridge Malfunction Report.

B. GATE REMAINS DOWN (CLOSED)

1. If the gate will not return to the upright position, the Bridge Operator will attempt to crank up the gate by hand.

2. Notify the Project Manager of the malfunction.

3. Refer to ATTACHMENT A-VII “Panatrol Operating Manual for the Fort St. Bascule Bridge”, Bypasses (page 7 of 9).

4. Complete the Bridge Malfunction Report.

C. “ALL GATES CLOSED” WITHOUT “ALL GATES CLOSED” LIGHT

1. Refer to ATTACHMENT A-VII “Panatrol Operating Manual for the Fort St. Bascule Bridge”, Bypasses (page 6 of 9).

2. Notify the Project Manager of the malfunction.

3. Complete the Bridge Malfunction Report.

D. GATE IS DAMAGED BY TRAFFIC OR STORM

1. If by traffic, attempt to obtain driver and vehicle identification and license plate number.

2. Notify the Project Manager immediately.

3. Notify the local police.

4. Use Section A instructions-GATE REMAINS UPRIGHT (OPEN) when bridge needs to be opened with damaged gate.

5. Complete Vehicle Traffic Accident Report.

6. Complete Bridge Malfunction Report.

In all cases listed above, the Project Manager will notify the Contract Administrator, who will notify Maintenance for repair. Failure to perform any of the above procedures or complete the appropriate paperwork will be considered non-conformance of the Bridge Contract.