Attachment A-VIII Fort St Bridge.docx

DOCX document 23 KB Posted

Attached to
Bridge Operations-Fort Street Bridge
Solicitation number
RFP-591-200000001437-1
Issued by
Wayne County, Michigan

About this file

This is an operational instruction document (Attachment A-VIII) detailing traffic control gate malfunction procedures for the Fort St. Bascule Bridge, likely part of RFP 200000001437. The document outlines specific protocols for four different gate malfunction scenarios: gates remaining upright (open), gates remaining down (closed), "all gates closed" signal issues without corresponding light indication, and gates damaged by traffic or storms.

Each scenario includes detailed step-by-step procedures for bridge operators to follow, including requirements for notifying project managers, completing malfunction reports, and implementing manual operation procedures when necessary. The document specifies that all incidents must be reported to the Contract Administrator, who will then coordinate with Maintenance for repairs. Non-compliance with these procedures or failure to complete required paperwork constitutes a contract violation.

View the file

Other files

File Type Posted
Proposal-instructions-confidential-treatment-vendor-questions-worksheet.docx DOCX document
Attachment A-IV.docx DOCX document
Attachment A-VII Fort St Bridge.pdf PDF
Attachment A-V.docx DOCX document
Schedule B Pricing.docx DOCX document
Attachment A-II.docx DOCX document
Attachment A-I.docx DOCX document
Contract terms.docx DOCX document
Schedule A-Statement of Work.docx DOCX document
Attachment A-III.docx DOCX document
Attachment A-VI.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 200000001437

ATTACHMENT A-VIII

INSTRUCTIONS FOR TRAFFIC CONTROL GATE MALFUNCTIONS

A. GATE REMAINS UPRIGHT (OPEN)

1. Request flagmen assistance from the Project Manager and/or crank the gate down by hand.

2. Block traffic using barricades or cones prior to opening the spans.

3. Refer to ATTACHMENT A-VII “Panatrol Operating Manual for the Fort St. Bascule Bridge”, Bypasses (page 7 to 9).

4. Open bridge.

5. Close bridge.

6. Remove cones or barricades.

7. Refer to ATTACHMENT A-VII “Panatrol Operating Manual for the Fort St. Bascule Bridge”, Bypasses (page 7 of 9).

8. Complete Bridge Malfunction Report.

B. GATE REMAINS DOWN (CLOSED)

1. If the gate will not return to the upright position, the Bridge Operator will attempt to crank up the gate by hand.

2. Notify the Project Manager of the malfunction.

3. Refer to ATTACHMENT A-VII “Panatrol Operating Manual for the Fort St. Bascule Bridge”, Bypasses (page 7 of 9).

4. Complete the Bridge Malfunction Report.

C. “ALL GATES CLOSED” WITHOUT “ALL GATES CLOSED” LIGHT

1. Refer to ATTACHMENT A-VII “Panatrol Operating Manual for the Fort St. Bascule Bridge”, Bypasses (page 6 of 9).

2. Notify the Project Manager of the malfunction.

3. Complete the Bridge Malfunction Report.

D. GATE IS DAMAGED BY TRAFFIC OR STORM

1. If by traffic, attempt to obtain driver and vehicle identification and license plate number.

2. Notify the Project Manager immediately.

3. Notify the local police.

4. Use Section A instructions-GATE REMAINS UPRIGHT (OPEN) when bridge needs to be opened with damaged gate.

5. Complete Vehicle Traffic Accident Report.

6. Complete Bridge Malfunction Report.

In all cases listed above, the Project Manager will notify the Contract Administrator, who will notify Maintenance for repair. Failure to perform any of the above procedures or complete the appropriate paperwork will be considered non-conformance of the Bridge Contract.