This document is an Annotated As-Built attachment for a federal contract concerning rehabilitation work on rehab gate stems No. 2 and No. 5 at Cherry Creek Dam in Colorado. The contracting agency is the U.S. Army Corps of Engineers, with Contract No. XXX and Solicitation No. W9128F26QA016 issued on February 12, 2026.

The project encompasses comprehensive refurbishment of two hydraulic gate systems located in the intake structure at elevation 5520.0. Work includes replacing bonnet base flanges, studs, nuts, gaskets, and face seals on multiple gate bonnets; replacing oil packing, water packing, and packing glands with new materials; refurbishing cylinder rods (gate stems) through cleaning, mineral buildup removal, pitting elimination, polishing, measuring, and re-chroming; lightly honing cylinder inner walls; replacing cylinder gaskets; cleaning and inspecting piston rings with documented reporting; replacing lower gate stem nut access covers and gaskets; and machining grooves in existing water packing seats for new seal wipers. Gate Stem No. 2 constitutes the base bid, while Gate Stem No. 5 is designated as a bid option. The work area includes access via a contractor access bridge rated at 8 tons GVW, with an operating deck equipped with a 7.5-ton hoist. Detailed drawings, material specifications, parts lists, and photographic documentation of existing conditions are provided throughout the attachment to guide contractor execution and verification of work completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9128F26QA016

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0G A1

.d w g

T.

W

EE

D

ER

K.

PA

R K

K.

PA

R K

T.

W

EE

D

ER

LO

C

AT

IO

N

M

AP

GA100

PROJECT LOCATION

(CHERRY CREEK DAM,

AURORA, CO )

PROJECT LOCATION

(SEE SHEET GA101 FOR

ENLARGED PLAN AND SECTIONS)

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0G A1

.d w g

T.

W

EE

D

ER

K.

PA

R K

K.

PA

R K

T.

W

EE

D

ER

G

EN

ER

AL

P

LA

N

A N

D S

EC

TI

O N

S

GA101

PROJECT LOCATION

(INTAKE STRUCTURE)

OPERATING DECK (7.5 TON HOIST)

WORK AREA-GATE CHAMBER (APPROX. EL.5520.0)

CONTRACTOR ACCESS BRIDGE

(8 TON G.V.W. RATED)

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

IN

TA

KE

S

TR

U C

TU

R

E

M-100

OPERATING DECK HOUSING OVERHEAD

CRANE AND 7.5 TON HOIST

STAIRWELL ACCESS TO GATE

CHAMBER (EL. 5520.0)

GATE CHAMBER

(EL. 5520.0)

VERTICAL ROLL-UP DOOR

ACCESS TO OPERATING DECK

ACCESS TO RAKING DECK

THRU MARINE DOOR

(MAY BE USED FOR VENTILATION )

#1 #2 #3 #4 #5

GATE STEM # 2

(BASE BID)

GATE STEM # 5

(BID OPTION)

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

G

AT

E

C H

AM

BE

R P

LA

N

A N

D E

LE

VA

TI

O

N S

M-101

#5 #4 #3 #2 #1

#5 #4

#3

#2 #1

FL

O

W D

IR

EC

TI

O

N

NOTE:

THE HYDRAULIC PIPING SHOWN ON THIS MAY NOT ACCURATELY REPRESENT THE

ACTUAL CONDITIONS. CONTRACTOR MUST FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO COMMENCING WORK ON SITE.

GATE STEM #5 (BID OPTION)

GATE STEM #2 (BASE BID)

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

FT

X

F

T

SL

ID

E

G

AT

E

AS

SE

M

BL

Y

M-102

19 2015 16 17 1811 12 13 148 9 10 14 5 6 73

REPLACE EXISTING BONNET BASE FLANGE

STUDS AND NUTS (42 EA) ON EACH BONNET.

REPLACE BONNET GASKETS OR FACE SEALS.

SEE MATERIAL INFORMATION ON SHEET M-106.

REPLACE LOWER GATE STEM NUT ACCESS

COVER GASKET AND FLAT HEAD CAP

SCREWS (28 EA) ON EACH GATE

REPLACE OIL PACKING, WATER PACKING, AND

PACKING GLANDS. SEE DETAILS ON SHEET M-104.

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

G

AT

E

AS

SE

M

BL

Y

SE

C

TI

O N

S

M-103

REPLACE CYLINDER GASKETS (TYP. 2 PER GATE)

REPLACE CYLINDER GASKETS (TYP. 2 PER GATE)

REPLACE THE WATER PACKING AND PACKING GLAND.

MACHINE A GROOVE IN THE EXISTING WATER PACKING

SEAT AND INSTALL A NEW CYLINDER ROD SCRAPER

(SEAL-GUARD WIPER). REFER TO THE WATER PACKING

SEAT DETAIL ON SHEET M-104. REPLACE ALL BRASS

STUDS AND NUTS.

REPLACE THE OIL PACKING AND PACKING

GLAND. REFER TO THE OIL PACKING AND

PACKING GLAND DETAILS ON SHEET M-104.

REPLACE ALL BRASS STUDS AND NUTS.

SEE SHEET M-105 FOR WORK

REQUIRED FOR GATE

HANGER ASSEMBLY

REFURBISH THE CYLINDER RODS (GATE STEMS) BY

CLEANING, REMOVING HEAVY MINERAL BUILDUP AND

PITTING, POLISHING, MEASURING, AND RE-CHROMING

LIGHTLY HONE THE

INNER WALL OF THE

CYLINDER

LIGHTLY HONE THE

INNER WALL OF THE

CYLINDER

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

PA

C

KI

N G

, G

LA

N D

, A N

D S

EA

T

D

ET

AI

LS

M-104

REPLACE 6-1/2"

WATER PACKING

REPLACE CYLINDER GASKETS

(2 EA. PER GATE)

MACHINE A GROOVE IN THE EXISTING

WATER PACKING SEAT AND INSTALL A NEW

CYLINDER ROD SCRAPER

REPLACE 6-1/2"

OIL PACKING

REPLACE GLANDS FOR 6-1/2"

OIL PACKING AND 6-1/2"

WATER PACKING

CLEAN AND INSPECT THE PISTON

RINGS AND PREPARE A REPORT IN

ACCORDANCE WITH PWS SECTION

1.2 SCOPE OF WORK.

LIGHTLY HONE

CYLINDER INNER WALL.

CLEAN AND INSPECT THE PISTON

RINGS, AND PREPARE A REPORT IN

ACCORDANCE WITH PWS SECTION

1.2, SCOPE OF WORK.

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

AU

TO

M

AT

IC

G

AT

E H

AN

G

ER

A

SS

EM

BL

Y

M-105

REPLACE 4" OIL PACKING AND GLAND

REPLACE 2-1/2" OIL PACKING AND GLAND

REPLACE 4" OIL PACKING AND GLAND

REPLACE PACKING

GLAND STUDS AND NUTS

REFURBISH THE GATE

HANGER CYLINDER RODS

BY CLEANING, REMOVING

HEAVY MINERAL BUILDUP

AND PITTING, POLISHING,

MEASURING, AND

RE-CHROMING.

GATE HANGER

PARTS

SUBJECT TO

REPLACEMENT

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

H

AR

D

W

AR

E

IN

FO

R

M

AT

IO

N

M-106

GATE STEM OIL PACKING,

AND WATER PACKING

GATE STEM NUT ACCESS COVER SCREWS

BONNET STUDS AND NUTS

GOVERNMENT FURNISHED

WRENCH FOR CONTRACTOR USE

WATER PACKING SEAT TO BE

GROOVED FOR NEW SEAL

WIPER (SCRAPER)

GATE STEM PACKING GLANDS

CYLINDER GASKETS

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

PH

O

TO

S

M-107

PHOTO 1. INTAKE STRUCTURE VIEWED FROM

ACCESS BRIDGE (EL.5645.0)

PHOTO 2. OPERATING DECK VERTICAL ROLL-UP DOOR

AND INTEGRAL SWING DOOR (EL.5645.0)

PHOTO 3. 7.5 TON HOIST ON OPERATING DECK

VIEWED FROM BELOW (EL.5645.0)

PHOTO 4. TOP OF AUTOMATIC GATE HANGER

ASSEMBLY VIEWED FROM STAIRWELL

PHOTO 5. OVERVIEW OF GATE CHAMBER LEVEL (EL. 5520.0) PHOTO 6. GOVERNMENT FURNISHED TOOLS ON SITE

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

-0 2-

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W F2 6Q

A0

C H

ER

R

Y C

R

EE

K D

AM

, C

O

LO

R

AD

O R

EH

AB

G

AT

E

ST

EM

S

N O

. 2

C D

0M -1

.d w g

T.

W

EE

D

ER

K.

P

AR

K

K.

P

AR

K

T.

W

EE

D

ER

PH

O

TO

S

M-108

PHOTO 1. GATE HOIST CYLINDER BONNET BASE PHOTO 2. WATER PACKING GLAND (BOTTOM) & OIL

PACKING GLAND (TOP)

PHOTO 3. AUXILIARY RIGGING BEAM AND WIRE ROPE