Attachment_9__SP_-_Fire_Sprinkler_Test_Form_(1).pdf
PDF 182 KB Posted
- Attached to
- AKRO STRCUTURAL FIRE SUPPRESSION & CONTROL EQUIP I Federal contract opportunity
- Solicitation number
- 140P9726Q0017
About this file
This is a Fire Sprinkler System Inspection and Test Report template used by the National Park Service Alaska Region (AKRO) to document the inspection and testing of fire sprinkler systems at park facilities.
The form is designed to be completed by a certified technician following inspection and functional testing conducted in accordance with NFPA 25 and NFPA 13 standards. The report documents system details including riser valve and backflow preventer specifications, monitoring status, and identifies the technician's certification credentials. The inspection covers eight general categories: sprinkler head condition and coverage, piping integrity, supports and bracing, backflow prevention equipment, clearances, hydraulic design documentation, and signage. The sprinkler heads section includes assessment of head condition, age-based requirements for replacement or testing (Standard Response heads at 50+ years, Fast Response at 25+ years, Dry type at 20+ years), and availability of spare heads with proper wrenches. Flow tests verify main drain sizing and function, inspector's test valve alarm activation within 60 seconds, and static/flow pressure measurements. Additional sections address alarms and supervisory devices, valve supervision and lubrication, gauge calibration maintenance on five-year intervals, five-year obstruction investigations, and Fire Department Connection accessibility and clearances. System-specific sections cover dry pipe valve trip testing, preaction system heat actuation devices, antifreeze solution inspection and type, pressurized water storage tank condition and maintenance, and equipment recalls. The form includes a deficiencies section for documenting uncorrected items with location, description, recommended resolution, and applicable NFPA code references. A checkbox indicates whether all deficiencies were corrected.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_SOW.pdf | ||
| Attachment_1_Structural_Fire_Asset_Details.pdf | ||
| Attachment_4__BP_-_Backflow_Device_Test_Form.pdf | ||
| Attachment_7__FA_-_Fire_Alarm_Test_Form_(1).pdf | ||
| B03_DOL_WD_2015-5681_Rev_25.pdf | ||
| B08_Subcontracting___Worksheet.xlsx | XLSX spreadsheet | |
| Attachment_5__CA_-_Clean_Agent_and_CO2_Test_Form_(1).pdf | ||
| Attachment_10__NPS_FILLABLE_INVENTORY_FORM_Vez_(1).xlsx | XLSX spreadsheet | |
| Attachment_3__DENA_Coordination_Requirements_1-23-20_(1).pdf | ||
| Attachment_8__FP_-_Fire_Pump_Test_Form_(1).pdf | ||
| Sol_140P9726Q0017.pdf | ||
| Attachment_6__DC_-_Dry_Chemical_Test_Form_(1).pdf | ||
| B03_DOL_WD_2015-5683_Rev_25.pdf | ||
| B03_DOL_WD_2015-5685_Rev_27.pdf | ||
| B03_DOL_WD_2015-5687_Rev_27.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire Sprinklers Page 1 of 4 Revised 12/17/25
National Park Service / AKRO
Inspection and Test Report (complete a separate form for each system)
FIRE SPRINKLER SYSTEM – DRY PIPE WET PIPE PREACTION RESIDENTIAL
Park Alpha Code: ______________________ FMSS Location No.:___________________
Location Description: ______________________
Date of Test:_________________________
Time:_________________
Riser Valve Make: ______________________ Valve Model: _____________________ Size: ____________________ Serial No: _____________________
Backflow Make: ______________________ Backflow Model: _____________________
Size: ____________________ Serial No: _____________________
Off Site Monitoring? Yes No Monitoring Company or Location
Name ________________________________
DEFICIENCIES FOUND? Yes No List items that were not corrected. Use the Deficiencies section or attach itemized sheet
REPAIRS: All deficiencies have been corrected N/A Yes No
This certifies that the fire and life safety system has been inspected and tested for functional operation in accordance with the current edition of NFPA 25 and NFPA 13, and has been properly tagged and/or labeled. Any discrepancies found are noted in this report with code references for corrective action by the Owner/Responsible Person.
Technician Name (printed): ______________________ Company: ______________________________
Signature: ___________________________________ Phone #: _______________________________
State Certification No.: _________________________
National/NICET No.: ___________________________
GENERAL
1. Sprinkler coverage was inspected and is adequate Yes No
2. Sprinkler heads are not blocked or obstructed Yes No
3. Piping is adequately installed with no bent or visibly damaged piping Yes No
4. Hangars and bracing components are not missing or damaged Yes No
5. A backflow preventer is provided and is accessible for maintenance N/A Yes No
6. Sprinkler heads are provided 18” min. clearance above top of storage N/A Yes No
7. Hydraulic design placard is installed and visible on riser N/A Yes No
8. General information signs are posted and are legible Yes No
Fire Sprinklers Page 2 of 4 Revised 12/17/25
SPRINKLER HEADS
9. Number of Sprinkler Heads: <20 >20 but < 100 >100
10. All accessible sprinkler heads have been visually inspected and are free of corrosion, paint, obstructions and/or physical damage. (If “no”, list the location of any defective heads in the “Deficiencies” section.)
Yes No
11. Standard Response sprinkler heads are less than 50 years old and do not require sample testing or replacement.
N/A Yes No
12. Fast Response sprinkler heads (quick response and residential) are less than 25 years old and do not require sample testing or replacement.
N/A Yes No
13. Dry type sprinkler heads are less than 20 years old and do not require sample testing or replacement
N/A Yes No
14. Standard response sprinkler heads are 75 years old and require replacement or testing
N/A Yes No
15. Sprinklers have been installed for 5 years, are exposed to harsh environments, including corrosive atmospheres, and require replacement or testing
N/A Yes No
16. The proper number of spare sprinkler heads is available, with the proper wrenches for each, at the riser or another designated location.
Yes No
FLOW TESTS
17. The system main drain is the proper size and discharges to the exterior of the building.
Size of drain _______ Required size ________ Yes No
18. A Main Drain flow test was performed:
Static pressure ____ psi Flow pressure ____ psi Return to static pressure ____min/sec
19. Flow from the inspector’s test valve activates the system alarms within 60 seconds. Yes No
ALARMS AND SUPERVISORY DEVICES
20. All supervisory and alarm devices [i.e. bell(s), flow switches, high/low air switches, valve tamper switches] function properly.
N/A Yes No
21. A water motor gong/bell is provided on the exterior of the building N/A Yes No
VALVES
22. All system supply and control valves are secured or supervised in the open position. Yes No
23. All supply valves have been lubricated (OS&Y valves) N/A Yes No
GAUGES
24. The maintenance on system gauges is up-to-date. Every 5 years, installed gauges shall be checked against (1) calibrated gauge to determine accuracy. If not within 3% of the calibrated gauge it should be replaced or recalibrated.
Due date for the next comparison test: ____________
OBSTRUCTION INVESTIGATION
25. A 5-year obstruction investigation was performed per NFPA 25.
Date for next obstruction investigation _____________
FIRE DEPARTMENT CONNECTIONS
26. The Fire Department Connection(s) (FDC) is clear of bushes, guards, or other debris and is visible from the fire access road N/A Yes No
27. FDC inlets have protective caps or covers. (Note: If missing, the pipe shall be visually inspected for debris) N/A Yes No
28. FDC inlets have at least 12” clearance for operating wrenches. N/A Yes No
Fire Sprinklers Page 3 of 4 Revised 12/17/25
ALARM MONITORING
29. All signals were received by the fire alarm system and the monitoring company.
DRY PIPE SYSTEM
30. The dry pipe valve was trip tested per NFPA 25. System tripped at _______ psi.
N/A Yes No
31. Water was discharged from the inspector’s test connection within 60 seconds of opening the test valve. Water delivery was _______ seconds.
N/A Yes No
32. Air compressor refills system in 30 minutes or less. N/A Yes No
33. The system’s low points were drained and the system was restored to service.
34. A quick opening device (QOD) is used (accelerator or exhauster) N/A Yes No
PREACTION SYSTEM
35. Heat actuation devices were functionally tested. N/A Yes No
ANTIFREEZE
36. Antifreeze solution has been inspected and tested N/A Yes No
37. Premixed antifreeze solution is used N/A Yes No
38. Listed antifreeze solution is used. N/A Yes No
39. The antifreeze information sign is provided, securely attached, and legible. N/A Yes No
PRESSURIZED WATER STORAGE TANK
40. Water level is within the normal range Yes No
41. Heating system is functional N/A Yes No
42. Exterior inspection of tank structure, supports, vents, and outlets, shows no evidence of accelerated corrosion or damage.
Yes No
43. Interior inspection was performed and shows no evidence accelerated corrosion, pitting, debris, or biological growth. (required at 3 year intervals)
N/A Yes No
44. All supply valves are open Yes No
45. Air or nitrogen pressure and quantity is adequate N/A Yes No
RECALLS
46. The technician did not find recalled devices or equipment during the visual inspection.
Fire Sprinklers Page 4 of 4 Revised 12/17/25
Deficiencies
Resolved
Location:
Deficiency:
Recommended Resolution:
NFPA 25 or NFPA 13 reference: