Attachment 9.2 Seed Project SON.pdf
PDF 193 KB Posted
- Attached to
- Handyman IDIQ - Beale AFB - Amendment 0001 - Bid Opening Ceremony Update Federal contract opportunity
- Solicitation number
- FA468621B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Initial SF 1409 Beale AFB Handyman.pdf | ||
| Attch 12 Site Map.pdf | ||
| FA468621B0001 Amendment 0001.pdf | ||
| Attch 9.2 Seed Project SON Revised.pdf | ||
| Attch 11 RFIs and Responses.pdf | ||
| Attachment 7 AF3000 Template.pdf | ||
| Attachment 1 Handyman SOW.pdf | ||
| Solicitation - FA468621B0001.pdf | ||
| Attachment 3 Bonding Information Request.pdf | ||
| Attachment 4 Mandatory Carpet Policy.pdf | ||
| Attachment 8 Wage Determinations.pdf | ||
| Attachment 5 NAF General Provisions.pdf | ||
| Attachment 9.1 Seed Project FOPR.pdf | ||
| Attachment 6 AF66 Template.xls | XLS spreadsheet | |
| Attachment 9.3 Seed Project Price Worksheet.xls | XLS spreadsheet | |
| Attachment 2 Beale DCG.pdf | ||
| Attachment 10 EAL for Base Access.xls | XLS spreadsheet |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 9TH RECONNAISSANCE WING (ACC)
BEALE AIR FORCE BASE, CALIFORNIA
Handyman 2020 Seed Project Statement of Need
A. General Scope. The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to remove damaged chain link fence, install new fence and install new double gate where old was. All posts shall be 3’ below grade anchored in concrete. New fence shall be 9ga wire with 2” post at 10” on center and 6’ high.
B. Authorized Work. Work shall be accomplished in accordance with all contractually incorporated documents. Any work that is accomplished outside of the contractual documents, unless authorized by a contracting officer, is accomplished at the contractor’s own risk.
C. All work shall be accomplished between 0700- 1700 Mon-Fri.
D. All contractor vehicles must enter the base via the Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List
(EAL) throughout duration of work performance.
II. WORK ITEMS:
The contractor shall comply with all applicable Federal, State and local construction standards.
Current Air Force Occupational Safety and Health (AFOSH) standards also apply.
Contractor shall be in compliance IAW all NFPA, AFI, UFC and ETL standards for fire safety.
All waste materials will be disposed of and removed off base by Contractor. Contractor will practice good housekeeping during project.