Attachment 9.2 Seed Project SON.pdf

PDF 193 KB Posted

Attached to
Handyman IDIQ - Beale AFB - Amendment 0001 - Bid Opening Ceremony Update Federal contract opportunity
Solicitation number
FA468621B0001
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Handyman IDIQ - Beale AFB - Amendment 0001 - Bid Opening Ceremony Update, newest first.
File Type Posted
Initial SF 1409 Beale AFB Handyman.pdf PDF
Attch 12 Site Map.pdf PDF
FA468621B0001 Amendment 0001.pdf PDF
Attch 9.2 Seed Project SON Revised.pdf PDF
Attch 11 RFIs and Responses.pdf PDF
Attachment 7 AF3000 Template.pdf PDF
Attachment 1 Handyman SOW.pdf PDF
Solicitation - FA468621B0001.pdf PDF
Attachment 3 Bonding Information Request.pdf PDF
Attachment 4 Mandatory Carpet Policy.pdf PDF
Attachment 8 Wage Determinations.pdf PDF
Attachment 5 NAF General Provisions.pdf PDF
Attachment 9.1 Seed Project FOPR.pdf PDF
Attachment 6 AF66 Template.xls XLS spreadsheet
Attachment 9.3 Seed Project Price Worksheet.xls XLS spreadsheet
Attachment 2 Beale DCG.pdf PDF
Attachment 10 EAL for Base Access.xls XLS spreadsheet
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 9TH RECONNAISSANCE WING (ACC)

BEALE AIR FORCE BASE, CALIFORNIA

Handyman 2020 Seed Project Statement of Need

A. General Scope. The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to remove damaged chain link fence, install new fence and install new double gate where old was. All posts shall be 3’ below grade anchored in concrete. New fence shall be 9ga wire with 2” post at 10” on center and 6’ high.

B. Authorized Work. Work shall be accomplished in accordance with all contractually incorporated documents. Any work that is accomplished outside of the contractual documents, unless authorized by a contracting officer, is accomplished at the contractor’s own risk.

C. All work shall be accomplished between 0700- 1700 Mon-Fri.

D. All contractor vehicles must enter the base via the Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List

(EAL) throughout duration of work performance.

II. WORK ITEMS:

The contractor shall comply with all applicable Federal, State and local construction standards.

Current Air Force Occupational Safety and Health (AFOSH) standards also apply.

Contractor shall be in compliance IAW all NFPA, AFI, UFC and ETL standards for fire safety.

All waste materials will be disposed of and removed off base by Contractor. Contractor will practice good housekeeping during project.