This is a Contract Data Requirements List (CDRL) for AUTEC WPB HVAC Maintenance, Contract Number N66604-25-SIMACQ-NPT-70-0060, issued by Naval Undersea Warfare Center Division Newport (Code 70). The document outlines nine specific data item requirements for the contractor, including Equipment Inventory Validation, Identification of Equipment in the Field, Pre-Existing Conditions Survey, Consumable Inventory, Cost Documentation, Preventative Maintenance Plan, Maintenance Service Reports, Service Call Reports, and an Emergency Plan.

Key deliverables include performing an in-depth survey of HVAC equipment within 30-90 days of contract award, maintaining detailed equipment and service call records, providing monthly and annual reports, and developing an emergency plan. All submissions must be electronic (Microsoft or Adobe format) and distributed to the Code 7032 Technical Point of Contact and C70 WAWF Acceptor. The documents are subject to Distribution Statement D, limiting access to Department of Defense and U.S. DoD contractors, with strict export control warnings. The contract is currently open with the contractor to be determined (TBD).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: MISC

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM:

Technical Report - Study/Services

3. SUBTITLE

Equipment Inventory

4. AUTHORITY (Date Acquisition Document No.)

DI–MISC–80508B

5. CONTRACT REFERENCE

SOW 4.1.1

6. REQUIRING OFFICE

NUWCDIVNPT, Code 70

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION *

ANNLY 30DAC b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A 30DACM Reg Repro

16. REMARKS CODE 70 WAWF

Acceptor

0 1 0

Block 9: DISTRIBUTION STATEMENT PARAGRAPHS ARE IN ADDITION TO CLASSIFICATION

AND CONTROLLED UNCLASSIFIED INFORMATION (CUI) MARKINGS OF THE DATA.

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

WARFARE CENTER DIVISION NEWPORT 1176 HOWELL STREET, NEWPORT, RI, 02841;

ATTN: CODE 70.

THE FOLLOWING 'EXPORT CONTROL WARNING NOTICE' MUST BE USED IN

CONJUNCTION WITH DISTRIBUTION STATEMENTS IDENTIFIED THE CDRL:

WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD

DIRECTIVE 5230.25.

Block 10,12,13, Within 30 days of contract award the Contractor shall perform an in-depth survey of each building to verify the HVAC Equipment Inventory provided as GFI, Para 6.1. Contractor is to add any HVAC equipment that is noted by the Contractor that is not on the HVAC Inventory list. Each piece of equipment must be listed on a separate line of the list. Contractor shall provide verified/updated copy of the HVAC Equipment List both electronically by email and in hard copy to the Code 7032 TPOC, C70 WAWF Acceptor, and Contracting Officer.

On an annual basis, at the beginning of the contract year the Contractor shall perform an in-depth survey of each building and submit an updated HVAC Equipment List to the C70 WAWF Acceptor and the Contracting Officer electronically by email and in hard copy.

Block 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe to all addressees.

Code 7032 TPOC

C02 Contracting Officer

0 2 0

15. TOTAL

______> 0 3 0

G. PREPARED BY:

Axel Gonzalez

H. DATE

2/14/25

I. APPROVED BY

J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __1__ of __9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: MISC

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM:

Technical Report - Study/Services

Identification of Equipment in the Field

5. CONTRACT REFERENCE

SOW 4.1.2

ASREQ 60DAC b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A See Block 16 Reg Repro

16. REMARKS CODE 70 WAWF

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,11,12,13, Within 60 days of contract award the Contractor shall locate and identify each item of equipment covered by this contract as listed in updated HVAC Inventory (Para 6.1). The Contractor shall provide 8.5" x 11" Equipment Tags with space for the following information recorded to be legibly on the tag for each preventative maintenance or Service Call visit: name of equipment, location of equipment, preventative maintenance or Service Call performed, details of work performed, name of person performing work and, date work performed. Tags shall be installed within 60 days of contract award and shall be within a plastic protection sleeve. Do not remove old maintenance tags. Leave old maintenance tags in the sleeve in chronological order, unless otherwise directed by the Code 7032 TPOC. Contractor is responsible for maintenance of equipment tags on equipment for duration of contract.

Code 7032 TPOC 0 1 0

______> 0 1 0

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __2__ of __9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: MISC

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM:

Technical Report - Study/Services

Pre-Existing Conditions Survey

5. CONTRACT REFERENCE

SOW 4.1.3

ASREQ 90DAC b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

A N/A See Block 16 Reg Repro

16. REMARKS CODE 70 WAWF

1 1 0

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,11,12,13, Within 90 days of award of this contract, the Contractor shall conduct a Pre-existing Condition Survey of all equipment covered under this contract and submit a listing of deficiencies to the Code 7032 TPOC and C70 WAWF Acceptor electronically by email and in hard copy. The survey is subject to the approval of the Government.

Code 7032 TPOC 1 1 0

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __3__ of __ 9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: MISC

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM:

Technical Report - Study/Services

Consumable Inventory

5. CONTRACT REFERENCE

SOW 4.1.4

ANNLY 30DAC b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A 30DACM Reg Repro

16. REMARKS CODE 70 WAWF

Acceptor

0 1 0

Block 3: Equipment Inventory Validation (SOW 4.1.1)

Block 9: DISTRIBUTION STATEMENT PARAGRAPHS ARE IN ADDITION TO CLASSIFICATION

AND CONTROLLED UNCLASSIFIED INFORMATION (CUI) MARKINGS OF THE DATA.

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,11,12,13, The Contractor shall inventory the air filter, belt, and coupling requirements for all equipment and create an electronic spreadsheet detailing the following in separate columns: building number, equipment name, size/number/type of filters required; size/number/type of belts required;

and/or size/type/model of coupling required.

On an annual basis, within 30 days of the contract year start, the Contractor shall update the electronic file and provide to the Code 7032 TPOC and C70 WAWF Acceptor electronically by email and in hard copy.

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __4__ of __ 9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: FNCL

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM:

Manhour Estimate, Technical Cost Proposals

Cost Documentation for Work Order

DI-FNCL-81116

5. CONTRACT REFERENCE

SOW 4.5

ASREQ 30DAC b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A See Block 16 Reg Repro

16. REMARKS CODE 70 WAWF

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,11,12,13, The Contractor shall provide cost documentation for all repair work including:

labor quantity, paid invoices for any materials, parts, and subcontractor costs (certified payrolls and a Release of Claims) no later than 30 business days after completion of the repair work. Cost documentation shall be submitted to the Code 7032 TPOC and C70 WAWF Acceptor electronically by email.

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __5__ of __9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: ILSS

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM:

Maintenance Support Plan

Preventative Maintenance Plan

DI-ILSS-81225

5. CONTRACT REFERENCE

SOW 4.6

ANNLY See Block 16 b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

A N/A See Block 16 Reg Repro

16. REMARKS CODE 70 WAWF

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,11,12,13, The Contractor shall submit the Preventative Maintenance Plan as part of the Contractor's proposal. This plan will be approved by the Government. The plan shall be updated no less than annually and shall be submitted to the Code 7032 TPOC and C70 WAWF Acceptor in pdf format electronically by email.

______> 2 2 0

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __6__ of __9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: MGMT

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM:

Maintenance Service Report

Preventative Maintenance Report

DI-MGMT-80995

5. CONTRACT REFERENCE

SOW 5.1.1

MTHLY See Block 16 b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A EOM See Block 16 Reg Repro

16. REMARKS CODE 70 WAWF

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,11,12,13: The reports shall be submitted at the end of each month detailing all of the preventative maintenance performed that month. The reports shall be collected into a single .pdf file per building. Electronic copies of these forms shall be saved by the Contractor, and submitted to the Code 7032 TPOC and C70 WAWF Acceptor monthly electronically by email.

______> 0 2 0

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __7__ of __9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: MISC

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM:

Technical Report - Study/Services

Service Call Report

5. CONTRACT REFERENCE

SOW 5.1.2

MTHLY See Block 16 b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A See Block 16 See Block 16 Reg Repro

16. REMARKS CODE 70 WAWF

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,11,12,13: A hard copy of this report shall be produced and submitted to the Code 7032 TPOC and C70 WAWF Acceptor the day that the work was completed. If work was performed after hours,….. In addition, the reports shall be submitted at the end of each month for all of the Service Calls performed that month. The reports shall be collected into a single .pdf file. Electronic copies of these forms shall be saved by the Contractor, and submitted to the Code 70 TPOC and C70 WAWF Acceptor monthly electronically via email.

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __8__ of __9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: MISC

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM:

Technical Report - Study/Services

Service Call Historical Spreadsheet

5. CONTRACT REFERENCE

SOW 5.1.3

ANNLY See Block 16 b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

A See Block 16 See Block 16 Reg Repro

16. REMARKS CODE 70 WAWF

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,11,12,13, The Contractor shall maintain a summary record of all Service Calls, separate from the Service Call Report. This summary is intended to be used as a reference source for trending and analyzing equipment performance. This shall include all related Repairs, even if a Service Call was not issued. The Contractor shall develop and maintain an Excel spreadsheet that contains the following information (spreadsheet is subject to review and approval by the Government prior to start of work and shall be subject to modification by direction of the Government):

a) Control number

b) Building number

c) Type (Repair, Service Call)

d) Priority (Emergency, Urgent, Routine)

e) Work Performed

f) Status (Open, Complete, Hold)

g) Date Received

h) Date Complete

This spreadsheet shall be submitted to the COR via email. At the end of each year, electronic copies of these forms shall be saved by the Contractor, and submitted to the Code 7032 TPOC and C70 WAWF Acceptor annually electronically by email.

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __9__ of __9 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER: MISC

D. SYSTEM/ITEM

AUTEC WPB HVAC Maintenance

E. CONTRACT / PR NO.

N66604-25-SIMACQ-NPT-70-0060

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A00A

2. TITLE OF DATA ITEM:

Technical Report - Study/Services

Emergency Plan

5. CONTRACT REFERENCE

SOW 4.1.5

ANNLY 30DAC b. COPIES

8. APP CODE D

(See Block 16)

11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

A See Block 16 See Block 16 Reg Repro

16. REMARKS CODE 70 WAWF

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF DEFENSE

AND U.S. DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY; (DATE DATA GENERATED).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL UNDERSEA

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C.,

APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

Block 10,12,13, Within 30 days of contract award the Contractor shall provide a draft emergency plan for government review and comment. The Government will review and provide comment within 15 business days after draft received. The Contractor shall provide final emergency plan electronically by email and in hard copy to the Code 7032 TPOC, C70 WAWF Acceptor, and Contracting Officer.

On an annual basis, at the beginning of the contract year the Contractor shall review and updated the emergency plan and provide to the C70 WAWF Acceptor and the Contracting Officer electronically by email and in hard copy.

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __9__ of __9 Pages