This document is a Statement of Work (SOW) appendix containing project layout maps, fiber/conduit distribution diagrams, and cable count specifications for Phase 2 of the Tahoma Woods Housing Fiber Install Project at Mount Rainier National Park in Ashford, Washington. The project involves the installation of fiber optic cable and conduit infrastructure to provide telecommunications connectivity to housing units and administrative facilities within the park.

The scope of work includes installation of approximately 3,705 linear feet of new conduit ranging from 1x2" to 2x2.5" in diameter, creation of 10 new distribution vaults (Vaults #5-10), and utilization of 6 existing vaults and infrastructure. The fiber distribution network utilizes 120-fiber single-mode cable as the primary backbone with 6-fiber and 12-fiber drops to individual buildings (trailers T-101 through T-118). Key infrastructure points include the Admin Building Server Room/Main Distribution Frame, two Admin Building conduit boxes, a Trailer Pad Pedestal, and multiple housing unit termination points. The cable distribution employs a color-coded binder system (BLU, ORA, GRN, BRN, RED, WHT, BLK, YEL, VIO) for organizational purposes. A critical constraint noted is that a 320-foot segment of 120-fiber SM conduit between Vaults #6 and #7 requires asphalt cutting. The project includes specifications for mid-span access splices at multiple vault locations and requires mule tape with integrated tracer wire in all new conduit paths for future cable locatability.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T-108

T-115

T-102

T-110

T-202

T-101

T-001

T-116

T-104T-103

T-113

T-107

T-105

T-109

T-111

T-118T-117

EXISTING Conduit 1x2" (Vault #4 to T116, Approx 100 ft)

EXISTING Conduit 1x2" (Admin Bldg Box #1 to Server Room, Approx 105 ft)

EXISTING Conduit 1x3" (Vault #1 to Admin Bldg Box #1, Approx 325 ft)

EXISTING Conduit 1x3" (Vault #1 to Vault

#4, Approx 1275 ft)

NEW Conduit 1x2" (Vault #10 to

T117, Approx 45 ft)

NEW Conduit 1x2" (Vault #8 to T104, Approx, 70 ft)

NEW Conduit 2x2.5" (Vault #4 to Vault #5, Approx 75 ft)

NEW Conduit 1x2" (Vault #9 to T105, Approx 75 ft)

NEW 1x2" Conduit (Vault #6 to T113, Approx 75 ft)

NEW 1x2" Conduit (Vault #7 to T102, Approx 80 ft)

NEW Conduit 1x2" (Vault #5 to T118, Approx 95 ft)

NEW 1x2" Conduit (Vault #7 to T111, Approx 95 ft)

NEW Conduit 1x2" (Vault #9 to T107, Approx 100 ft)

NEW Conduit 1x2" (Vault #6 to Trailer Pad

Pedestal, Approx 100 ft)

NEW Conduit 1x2" (Vault #8 to T103, Approx 110 ft)

NEW Conduit 2x2.5" (Vault #6 to Vault #7, Approx 320 ft)

EXISTING

Vault #1

EXISTING

Vault #1A

EXISTING

Vault #1B

EXISTING

Vault #2

EXISTING

Vault #3

EXISTING

Vault #4

NEW Vault #5

NEW Vault #6 NEW Vault #7

NEW Vault #8 NEW Vault #9

NEW Vault #10

Admin Bldg Server

Room / MDF

Admin Bldg Conduit Box #2

Admin Bldg Conduit Box #1

Trailer Pad Pedestal

Microsoft, Vantor

0 500 1,000250 Feet

Mount Rainier National Park

Tahoma Woods Housing Fiber Install Project

Ashford, WA

Phase 2 Project Main Layout Map

SOW Appendix A

Vaults - NEW NEW Vault #10

NEW Vault #5

NEW Vault #6

NEW Vault #7

NEW Vault #8

NEW Vault #9

Points Admin Bldg Conduit Box #1

Admin Bldg Conduit Box #2

Admin Bldg Server Room / MDF

Trailer Pad Pedestal

Vaults - EXISTING EXISTING Vault #1

EXISTING Vault #1A

EXISTING Vault #1B

EXISTING Vault #2

EXISTING Vault #3

EXISTING Vault #4

Conduit Paths - NEW NEW 1x2" Conduit (Vault #6 to T112, Approx 105 ft)

NEW 1x2" Conduit (Vault #6 to T113, Approx 75 ft)

NEW 1x2" Conduit (Vault #7 to T101, Approx 105 ft)

NEW 1x2" Conduit (Vault #7 to T102, Approx 80 ft)

NEW 1x2" Conduit (Vault #7 to T110, Approx 110 ft)

NEW 1x2" Conduit (Vault #7 to T111, Approx 95 ft)

NEW Conduit 1x2" (Vault #10 to T117, Approx 45 ft)

NEW Conduit 1x2" (Vault #4 to Vault #10, Approx 180 ft)

NEW Conduit 1x2" (Vault #5 to T118, Approx 95 ft)

NEW Conduit 1x2" (Vault #6 to Trailer Pad Pedestal, Approx 100 ft)

NEW Conduit 1x2" (Vault #8 to T103, Approx 110 ft)

NEW Conduit 1x2" (Vault #8 to T104, Approx, 70 ft)

NEW Conduit 1x2" (Vault #8 to T108, Approx 120 ft)

NEW Conduit 1x2" (Vault #8 to T109, Approx 70 ft)

NEW Conduit 1x2" (Vault #9 to T105, Approx 75 ft)

NEW Conduit 1x2" (Vault #9 to T107, Approx 100 ft)

NEW Conduit 2x2.5" (Vault #4 to Vault #5, Approx 75 ft)

NEW Conduit 2x2.5" (Vault #5 to Vault #6, Approx 280 ft)

NEW Conduit 2x2.5" (Vault #6 to Vault #7, Approx 320 ft)

NEW Conduit 2x2.5" (Vault #7 to Vault #8, Approx 250 ft)

NEW Conduit 2x2.5" (Vault #8 to Vault #9, Approx 205 ft)

Conduit Paths - EXISTING Description

EXISTING Conduit 1x2" (Admin Bldg Box #1 to Server Room, Approx 105 ft)

EXISTING Conduit 1x2" (Vault #4 to T115, Approx 12 ft)

EXISTING Conduit 1x2" (Vault #4 to T116, Approx 100 ft)

EXISTING Conduit 1x3" (Vault #1 to Admin Bldg Box #1, Approx 325 ft)

EXISTING Conduit 1x3" (Vault #1 to Vault #4, Approx 1275 ft)

Trails

Buildings

Roads

Inset 1

Inset 2

To SR706

238th Ave E Housing Area Loop Road

238th Ave E Admin Building & Parking Area

Staging Area

Staging Area

Staging Area

Inset 3

T-001

T-117

EXISTING Conduit 1x2" (Admin Bldg Box #1 to Server Room, Approx 105 ft)

EXISTING Conduit 1x3" (Vault #1 to Admin Bldg Box #1, Approx 325 ft)

EXISTING Conduit 1x3" (Vault #1 to Vault

#4, Approx 1275 ft)

EXISTING Conduit 1x3" (Vault #1 to Vault

#4, Approx 1275 ft)

EXISTING

Vault #1

EXISTING

Vault #1A

EXISTING

Vault #1B

EXISTING

Vault #2

Admin Bldg Server Room / MDF

Admin Bldg Conduit Box #2

Admin Bldg Conduit Box #1

Microsoft, Vantor 0 150 30075 Feet

Staging Area

Mount Rainier National Park Tahoma Woods Housing

Fiber Install Project Ashford, WA

Phase 2 Project Layout Map - Inset 1

238th Ave E Admin Building & Parking Area

To SR706

238th Ave E Housing Area Loop Road

T-115

T-116

T-113

T-118 T-117

EXISTING Conduit 1x2" (Vault #4 to

T115, Approx 12 ft)

EXISTING Conduit 1x2" (Vault #4 to T116, Approx 100 ft)

EXISTING Conduit 1x3" (Vault #1 to Vault

#4, Approx 1275 ft)

EXISTING Conduit 1x3" (Vault #1 to Vault

#4, Approx 1275 ft)

EXISTING Conduit 1x3" (Vault #1 to Vault #4, Approx 1275 ft)

NEW Conduit 1x2" (Vault #10 to T117, Approx 45 ft)

NEW Conduit 2x2.5" (Vault #6 to Vault #7, Approx 320 ft)

NEW Conduit 2x2.5" (Vault #4 to Vault #5, Approx 75 ft)

NEW Conduit 1x2" (Vault #5 to T118, Approx 95 ft)

NEW Conduit 1x2" (Vault #6 to Trailer Pad

Pedestal, Approx 100 ft)

NEW Conduit 1x2" (Vault #4 to Vault

#10, Approx 180 ft)

NEW Conduit 2x2.5" (Vault #5 to Vault #6, Approx 280 ft)

EXISTING

Vault #2

EXISTING

Vault #3

EXISTING

Vault #4

NEW Vault #5

NEW Vault #6

NEW Vault #10

Trailer Pad Pedestal

Microsoft, Vantor 0 150 30075 Feet

Staging Area

Mount Rainier National Park Tahoma Woods Housing

Fiber Install Project Ashford, WA

Phase 2 Project Layout Map - Inset 2

238th Ave E

T-108

T-112

T-102

T-110

T-101

T-104T-103

T-113

T-107

T-105

T-109

T-111

NEW Conduit 1x2" (Vault #6 to Trailer Pad

Pedestal, Approx 100 ft)

NEW Conduit 1x2" (Vault #8 to T104, Approx, 70 ft)

NEW Conduit 1x2" (Vault #8 to T109, Approx 70 ft)

NEW Conduit 1x2" (Vault #9 to T105, Approx 75 ft)

NEW 1x2" Conduit (Vault #6 to T113, Approx 75 ft)

NEW 1x2" Conduit (Vault #7 to T102, Approx 80 ft)

NEW 1x2" Conduit (Vault #7 to T111, Approx 95 ft)

NEW Conduit 1x2" (Vault #9 to T107, Approx 100 ft)

NEW 1x2" Conduit (Vault #7 to T101, Approx 105 ft)

NEW 1x2" Conduit (Vault #6 to T112, Approx 105 ft)

NEW 1x2" Conduit (Vault #7 to T110, Approx 110 ft)

NEW Conduit 1x2" (Vault #8 to T103, Approx 110 ft)

NEW Conduit 1x2" (Vault #8 to T108, Approx 120 ft)

NEW Conduit 2x2.5" (Vault #8 to Vault #9, Approx 205 ft)

NEW Conduit 2x2.5" (Vault #7 to Vault #8, Approx 250 ft)

NEW Conduit 2x2.5" (Vault #6 to Vault #7, Approx 320 ft)

NEW Vault #6

NEW Vault #7

NEW Vault #8 NEW Vault #9

Microsoft, Vantor 0 150 30075 Feet

Asphalt Cut

Staging Area

Mount Rainier National Park Tahoma Woods Housing

Fiber Install Project Ashford, WA

Phase 2 Project Layout Map - Inset 3

238th Ave E

1" = 1 1

1- -

Twoods/Nisqually Conduit/Fiber Install (Phase 2)

Hicks, Casey A 15 FEB 2026

NPS MORA IT/

Telecom Program

55210 238 th

Ave E

Ashford, WA 98304

360-569-6555

SOW Appendix B

Fiber/Conduit Layout Diagram

1" = 1 1

1- -

Twoods/Nisqually Conduit/Fiber Install (Phase 2)

Hicks, Casey A 15 FEB 2026

NPS MORA IT/

Telecom Program

55210 238 th

Ave E

Ashford, WA 98304

360-569-6555

SOW Appendix B

Fiber/Conduit Layout Diagram

B

SCALE

SIZE

SHEET OF

REVFSCM NO DRAWING NUMBER

DRAWING TITLE

PROJECT

DRAWN BY DATE

COMPANY

C DBA

C DBA

B

SCALE

SIZE

SHEET OF

REVFSCM NO DRAWING NUMBER

DRAWING TITLE

PROJECT

DRAWN BY DATE

COMPANY

C DBA

C DBA

NOTES:

Statement of Work supersedes this drawing. This drawing is intended to provide clarity in the work to be completed, but is not intended to deviate from what has been contractually obligated within the Statement of

Work. Any discrepancies shall be brought to the attention of the COR & Project Lead.

All new conduit paths shall include mule tape with weaved-in tracer wire for future use and so cable can be locatable when dielectric fiber cable is used

T001 Admin Bldg – Server Room

ODF (120F SM LC/UPC)

Admin Bldg

Box #2

120F SM

550 ft

120F SM

40 ft

120F SM

90 ft

120F SM

40 ft

120F SM

115 ft

120F SM

160 ft

120F SM

250 ft

Vault #4

Mid-Span

Access Splice

120F SM

300 ft

12F SM

50 ft

12F SM

180 ft

6F SM

30 ft

6F SM

100 ft

Admin Bldg

Box #1 Vault #1B Vault #1A Vault #1

Vault #2 Vault #3

Vault #10 Bldg T117

Apartments Bldg T115

Exterior NID

Bldg T116

Exterior NID

Interior RM FDP

Vault #5

Mid-Span

Access Splice

120F SM

75 ft

Bldg T118

Apartments

Interior RM FDP

12F SM

100 ft

12 6 6 12

Bldg T112

Exterior NID

Bldg T113

Exterior NID

Trailer Pad

Pedestal

Exterior NID

6F SM

75 ft

6F SM

100 ft

6F SM

105 ft

120 SM

280 ft

Vault #6

Mid-Span

Access Splice

6 66

Vault #7

Mid-Span Access

Splice

6 66 6

120F SM – 320 ft - ASPHALT CUT REQUIRED

Bldg T110

Exterior NID

Bldg T101

Exterior NID

Bldg T102

Exterior NID

Bldg T111

Exterior NID

6F SM

105 ft

6F SM

80 ft

6F SM

110 ft

6F SM

95 ft

Vault #8

Mid-Span Access

Splice

6 66 6

Bldg T108

Exterior NID

Bldg T103

Exterior NID

Bldg T104

Exterior NID

Bldg T109

Exterior NID

6F SM

110 ft

6F SM

70 ft

6F SM

110 ft

6F SM

95 ft

120F SM

250 ft

ALL DISTANCES LISTED ARE APPROXIMATE. Vendors will need to wheel their own measurements if more accuracy is required.

Vault #9

End-Span

Access Splice

6 6

Bldg T105

Exterior NID

Bldg T107

Exterior NID

6F SM

75 ft

6F SM

100 ft

120F SM

205 ft

“Interior FDP RM” refers to rackmount 1U fiber patch (distribution) panel trays, 12-Fiber /w LC/UPC connectors.

“Exterior NID” refers to an outdoor wall-mount FTTH 6-fiber /w LC/UPC connectors. Boxes shall be mounted outside the utility/laundry room of each housing unit (near rear center of each building).

5 A Fiber Count Diagram has been established for mid-span access distribution of the 120F cable and is included with this drawing. All splicing shall follow the fiber count diagram.

SOW Appendix C Cable Distribution Count Diagram

Revision Date: 2/15/2026

Binder Fiber # Vault Building Fiber ID Binder Fiber # Vault Building Fiber ID

001 001 061 001 002 002 062 002 003 003 063 003 004 004 064 004 005 005 065 005 006 006 066 006 007 007 067 001 008 008 068 002 009 009 069 003 010 010 070 004 011 011 071 005 012 012 072 006 013 001 073 001 014 002 074 002 015 003 075 003 016 004 076 004 017 005 077 005 018 006 078 006 019 001 079 001 020 002 080 002 021 003 081 003 022 004 082 004 023 005 083 005 024 006 084 006 025 001 085 001 026 002 086 002 027 003 087 003 028 004 088 004 029 005 089 005 030 006 090 006 031 007 091 001 032 008 092 002 033 009 093 003 034 010 094 004 035 011 095 005 036 012 096 006 037 001 097 001 038 002 098 002 039 003 099 003 040 004 100 004 041 005 101 005 042 006 102 006 043 001 103 001 044 002 104 002 045 003 105 003 046 004 106 004 047 005 107 005 048 006 108 006 049 001 109 001 050 002 110 002 051 003 111 003 052 004 112 004 053 005 113 005 054 006 114 006 055 001 115 001 056 002 116 002 057 003 117 003 058 004 118 004 059 005 119 005 060 006 120 006

FEED DISTRIBUTION / DROP

BLU

Vault 04

T117 Apts

(via vault 10)

ORA

T115

T116

GRN Vault 05 T118 Apts

BRN

Vault 06

Trailer Pad

T112

SLT

T113 future (no splice)

T101

T102

RED

T110

T111

Mount Rainier National Park Tahoma Woods Housing Fiber Install Project - Phase 2

VIO Vault 09

T105

T107

FEED DISTRIBUTION / DROP

BLK

Vault 08

T103

T104

YEL

T108

T109

WHT

Vault 07

Appendix A - Phase 2 Main Layout Map
Phase 2 Layout Inset 1
Phase 2 Layout Inset 2
Phase 2 Layout Inset 3
Appendix B - Phase 2 Layout Diagrams
Phase 2 Layout Diagrams.vsdx
Phase 2 Diagram
Appendix C - Fiber Count Diagram
Cable Dist Count Diagram

File details come from the government source that posted it. Updated .