Attachment_6_CONTRACTOR_S_QUALITY_CONTROL_DAILY_REPORT.docx
DOCX document 35 KB Posted
- Attached to
- MORA TAHOMA WOODS FIBER OPTIC INSTALL
- Solicitation number
- 140P8326Q0014
About this file
This is a Contractor's Quality Control Daily Report template used for documenting construction work performed on federal projects. The form serves as a standardized record-keeping document for tracking daily activities, personnel, equipment, materials, and quality assurance measures at project sites.
The report template captures essential project information including contract number, date, weather conditions, and ground conditions, along with detailed records of work performed by prime contractors and multiple subcontractors. It requires documentation of employee counts by job category and hours worked, heavy equipment deployed on site with operating hours, materials delivered, and official visitors. The form includes dedicated sections for recording specific inspections performed with results and corrective actions, testing activities with attached test reports, and verbal instructions received from government representatives regarding construction deficiencies or re-testing requirements. The contractor's quality control representative must certify that all work performed by the prime contractor and each subcontractor complies with plans and specifications, with space for noting any exceptions. The template accommodates multiple subcontractors on continuation sheets, allowing comprehensive documentation of all on-site activities and quality control measures to ensure compliance with contract requirements on construction projects such as the fiber optic cable installation at Mount Rainier National Park.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR'S QUALITY CONTROL DAILY REPORT
| REPORT NO. | SHEET 1 OF |
| PROJECT | |
| CONTRACT NO. | |
| DATE |
| PARK |
| CONTRACTOR'S REPRESENTATIVE ON THE JOB |
| WEATHER (Rain, Snow, Cloudy, Windy, etc.) |
| RAINFALL |
Inches
| TEMPERATURE |
| GROUND CONDITIONS (Dry, Damp, Wet, Frozen, etc.) |
| MAX. |
| MIN. |
1. PRIME CONTRACTOR
| NO. EMPLOYEES BY JOB CATEGORIES |
| Hours |
| HEAVY EQUIPMENT ON THE JOB |
| NO. UNITS |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY PRIME CONTRACTOR:
| MATERIALS DELIVERED |
| OFFICIAL VISITORS TO SITE |
2A. SUBCONTRACTOR, : (If more than one subcontractor use copies of following page.)
| NO. EMPLOYEES BY JOB CATEGORIES |
| Hours |
| HEAVY EQUIPMENT ON THE JOB |
| NO. UNITS |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY SUBCONTRACTOR:
3. SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions)
4. TESTING: 1 Check if any testing was performed today. (Complete and attach Test Report Information Sheets.) Type and Location of Testing:
5. VERBAL INSTRUCTION RECEIVED FROM GOVERNMENT ON CONSTRUCTION DEFICIENCIES OR RE- TESTING REQUIRED:
6. REMARKS:
7. CERTIFICATION:
I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the prime contractor and each subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above.
Contractor's Quality Control Representative
| SUBCONTRACTOR WORK CONTINUED: | |
| CONTRACT NO. | |
| REPORT NO. | SHEET 2 OF ________ |
2 SUBCONTRACTOR,
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY | EQUIPMENT ON THE JOB |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY SUBCONTRACTOR:
2 SUBCONTRACTOR,
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY | EQUIPMENT ON THE JOB |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY SUBCONTRACTOR:
2 SUBCONTRACTOR,
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY | EQUIPMENT ON THE JOB |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| Comments |
WORK PERFORMED BY SUBCONTRACTOR:
2 SUBCONTRACTOR,
| NO. EMPLOYEES BY JOB CATEGORIES | |
| Hours | |
| HEAVY | EQUIPMENT ON THE JOB |
| NO. UNITS | |
| HRS. WORKING |
| YES |
| NO |
| COMMENT S |
WORK PERFORMED BY SUBCONTRACTOR: