Attachment 8 is a Schedule of Material Submittals for the KYJM 18-9007 project to Repair Fire Training Facility B218 at Homestead Air Reserve Base, associated with Solicitation FA664825R0004. The document outlines 16 key material and documentation submittal requirements, including QC Plan, Waste Management Plan, Video System Control Tower, New Tower, Mockup, Concrete, Asphalt, Electrical, Plumbing, HVAC, Water Pump, Propane Valves, Fire Liner System, As-Builts, and Safety Inspection documentation. The submittal schedule includes multiple submission categories such as preconstruction submittals, shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions, warranties, operations and maintenance data, and closeout submittals. Each line item requires multiple review and approval stages, with designated columns for tracking submission dates, receipt dates, and approval status.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT # | PROJECT TITLE | SOLICITATION/CONTRACT NUMBER | ||||||||||||||||||
| KYJM 18-9007 | Repair Fire Training Facility B218 | FA664825R0004 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| LINE # | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES AND COLOR SELECTION | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER’S INSTRUCTIONS | SD-09 WARRANTY OR OTHER | SD-10 OPERATIONS AND MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | CONTRACT RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS-APPROVED | ||||||||||||||||||||
| 1 | QC Plan and HASP | 1 | |||||||||||||||||||
| 2 | Waste Management Plan | 1 | |||||||||||||||||||
| 3 | New Video System Control Tower | 1 | 1 | 1 | 1 | 1 | |||||||||||||||
| 4 | New Tower | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||
| 5 | New MOCKUP | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||
| 6 | Concrete | 1 | 1 | 1 | 1 | ||||||||||||||||
| 7 | Asphalt | 1 | 1 | 1 | 1 | ||||||||||||||||
| 8 | New Electric | 1 | 1 | ||||||||||||||||||
| 9 | New Plumbing | 1 | 1 | ||||||||||||||||||
| 10 | New A/C | 1 | 1 | 1 | 1 | 1 | |||||||||||||||
| 11 | New water pump | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||
| 12 | New propane valves and gauges | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||
| 13 | New Class A Composite Fire Liner System | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||
| 14 | As-Builts | 1 | 1 | ||||||||||||||||||
| 15 | Semi-Annual System Safey Inspection & Operational Checks (WP 006 00 within TO 35E1-2-13-1) | 1 | 1 | ||||||||||||||||||
| 16 | Safety Plan | 1 | |||||||||||||||||||
| 17 | |||||||||||||||||||||
| 18 | |||||||||||||||||||||
| 19 | |||||||||||||||||||||
| 20 | |||||||||||||||||||||
| 21 | |||||||||||||||||||||
| 22 | |||||||||||||||||||||
| 23 | |||||||||||||||||||||
| 24 | |||||||||||||||||||||
| 25 | |||||||||||||||||||||
| 26 | |||||||||||||||||||||
| 27 | |||||||||||||||||||||
| 28 | |||||||||||||||||||||
| 29 | |||||||||||||||||||||
| 30 |
AF Form 66, SEP 1986 PAGE &P OF &N DATE: &D