Section L of this Request for Proposals (RFP) provides detailed instructions for submitting a proposal for repairing the Aircraft Fire Training Facility at Homestead Air Reserve Base, FL. The solicitation is a 100% Small Business Set-Aside with a competitive firm-fixed price contract, with an estimated period of performance of 180 calendar days. Offerors must submit electronic proposals by 5 June 2025 at 1:00 PM EDT to viviane.filias@us.af.mil and sandy.guite@us.af.mil, with proposals organized into three volumes: Price Proposal, Past Performance Fact Sheets, and Technical Proposal.

The Technical Proposal must address four subfactors: (1) Bonding (minimum 20% bid bond), (2) NIST Compliance (summary level score of 110), (3) Schedule and Methodology demonstrating construction execution capability, and (4) Organization and Key Personnel. Contractors must be certified by AFCEC/CXF or subcontract with an approved vendor for aircraft fire training facility work. The estimated contract value is between $1,000,000 and $5,000,000, with a mandatory site visit scheduled for 16 May 2025. Proposals must include detailed cost estimates, past performance information, and meet specific technical and compliance requirements outlined in the solicitation.

View the file

Other files

File Type Posted
Solicitation Amendment FA664825R00040002 SF 30.pdf PDF
Attachment 17 - Consolidated Requests for Information Q-As (6-4-25).xlsx XLSX spreadsheet
Solicitation Amendment FA664825R00040001 SF 30.pdf PDF
Attachment 1 - SOW KYJM 18-9007 rev.6 (5-21-25).pdf PDF
Attachment 17 - Consolidated Requests for Information Q-As.xlsx XLSX spreadsheet
Attachment 18 - Site Visit Photos.pdf PDF
Attachment 19 - Site Visit Sign in Sheet REDACTED.pdf PDF
Attachment 5 - UFC 3 250 03.pdf PDF
Attachment 9 - CONSTRUCTION COST ESTIMATE (BLANK).xlsx XLSX spreadsheet
Attachment 13 - Past Performance Fact Sheet - Fire Trainer (Offeror).docx DOCX document
Attachment 1 - SOW KYJM 18-9007 rev.5 (4-24-25).pdf PDF
Attachment 7 - KYJM18-9007 DRAWINGS.pdf PDF
Attachment 8 - KYJM 18-9007_AF 66_Construction.xlsx XLSX spreadsheet
Attachment 12 - Base Access Form_Blank.pdf PDF
Attachment 16 - Section M FA664825R0004.pdf PDF
Solicitation - FA664825R0004.pdf PDF
Attachment 3 - UFC 3 230 02.pdf PDF
Attachment 4 - UFC 3 250 01.pdf PDF
Attachment 6 - UFGS 07 14 00 UFGS 07 92 00 UFGS 22 15 13.16 40 UFGS 33 11 00.pdf PDF
Attachment 10 - Template - AF 3064 - Progress Schedule.xlsx XLSX spreadsheet
Attachment 2 - T.O. 35E1-2-13-1.pdf PDF
Attachment 11 - DBA Wage Determination FL20250215 dated 4-11-25.pdf PDF
Attachment 14 - Past Performance Questionnaire.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section L - Instructions, Conditions, and Notices to Offerors

1. PROPOSAL DELIVERY INSTRUCTIONS

1.1 Offerors must follow the instructions contained herein. Offerors are cautioned that noncompliance with any of the terms and conditions of the RFP may result in their proposal being deemed ineligible for consideration or award. Offerors shall submit only one proposal and the Government will review only one proposal per offeror. Proposals must be received by 482d CONF/PK no later than the date and time specified in Block 13 of the RFP. Proposals delivered after the exact date and time for receipt of proposals will not be considered.

1.2 Electronic bidding will be utilized for this acquisition. Prospective offerors SHALL deliver proposals via email to viviane.filias@us.af.mil and sandy.guite@us.af.mil or through DoD SAFE (Secure Access File Exchange) at https://safe.apps.mil. DoDSAFE requires a drop to be set up in advance. Please ensure any request for DoDSAFE is submitted at least 2 business days prior to bid close. Government Outlook email systems cannot accept emails larger than 20MB.

2. VOLUME INSTRUCTIONS

2.1 General. Prospective offerors SHALL organize electronic proposals in the following volumes:

Volume Description Number of Copies

I Price Proposal (SF1442 & Attachment 9 - Construction Cost Estimate

One (1)

II Past Performance Fact Sheets (Attachments 13 & 14) One (1) for each effort III Technical Proposal (Including Bid Bond & Attachment

10 – AF3064 Progress Schedule) One (1)

2.1.1 Proposals shall be in the English language and all monies in US Dollars.

2.1.2 Volumes (i.e. files) shall be separated and easily identified (ex. Volumes I, II, & III).

2.1.3 Only the Vol I – Price Proposal, Vol II – Past Performance to include Past Performance Questionnaires (PPQ) received from the applicable points of contacts (POCs), & Vol III – Technical Proposal will be considered part of the offeror’s proposal. Additional proposal documentation will not be considered.

2.1.4 Each page containing proprietary information should be marked:

SOURCE SELECTION INFORMATION--SEE FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

2.2 Volume I – Price Proposal

The offeror shall submit the SF 1442 with all required fill-ins. Complete blocks #14, #15, #16 (if different than block #14), #17, #20a, #20b, #20c, and block #19, if amendments have been issued. An authorized official of the firm must sign block 20b of the SF 1442. Complete pricing information on all Contract Line Items (CLINs). Complete all appropriate and applicable Representations and Certifications. Complete Attachment 9 – Construction Cost Estimate. Contractors may use their own cost estimate form (if preferred) to provide a detailed cost breakdown so long as it includes the details for individual line items to include labor, material and equipment costs, unit of measure, quantities, cost per units and appropriate construction divisions. All proposed subcontracted work MUST be accompanied by the detailed subcontractor quotes.

2.3 Volume II – Past Performance Fact Sheet

The Offeror shall submit a minimum of three (3) Past Performance Fact Sheets. Information on each Past Performance Fact Sheet shall closely relate to the scope, size and complexity of the proposed work under this solicitation. To demonstrate relevancy, the offeror shall compare the past performance work completed with the work description in the Statement of Work (Attachment 1). Provide the most current information for the Points of Contact (POCs) identified on the Past Performance Fact Sheets. At least two of the following (in descending order of availability) should be identified as current POCs:

(a) Procuring Contracting Officer/Contract Negotiator or equivalent

(b) Program/Project Manager, or equivalent

(c) Administrative Contracting Officer/Contract Administrator or equivalent

(d) Other (As specified in your Past Performance Fact Sheet)

The Past Performance Fact Sheet information is intended to assist in determining relevancy of a given project and will not, by itself, be evaluated for performance.

2.4 Volume III – Technical Proposal: The technical proposal is comprised of four (4) subfactors:

2.4.1 Subfactor 1 – Bonding: The Offeror shall submit a bid bond of at least 20% of the proposed total evaluated price. To be considered, the contractor must have a letter from an approved surety that states the contractor has a relationship with the company and required bonding capacity has been obtained or will be obtained upon award. Letters must be notarized and signed by someone who can represent the surety. Letters signed by agents are unacceptable unless accompanied by a Power of Attorney granting proper authority to the agent. List of certified sureties:

https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html

2.4.2 Subfactor 2 – NIST Compliance: IAW with DFARS 252.204-7019 & 252.204-7020 as a covered contractor you are required to implement NIST 800-171r2 and have a current summary level score of 110 to be fully compliant. “Current” is considered not more than 3 years old. If your organization does not currently have a NIST summary level score on file you can conduct a Basic assessment and enter it directly in SPRS or send via email as outlined in DFARS 252.204-7019(d) or the NIST quick entry guide located at NIST SP 800-171. If your organization’s summary level score is below 110 a copy of your company’s plan to become compliant will need to be forwarded to the contracting office for inclusion in the contract file prior to award.

2.4.3 Subfactor 3 – Schedule and Methodology: The Offeror shall provide a technical approach that demonstrates their ability to execute all critical aspects of construction within the performance period of the contract. The Offeror shall be specific and complete in explaining their project management approach. The Offeror shall also demonstrate an understanding of the issues related to the aircraft fire training facility repair, replacement and maintenance and detail a method for risk mitigation. The Offeror may use a critical path or other method of his/her choice; however, schedules shall be graphically represented. The length of the schedule must match the proposed contract duration. NOTE: The summary schedule will, after contract award, be replaced with a final schedule as required by FAR Clause 52.236-15, Schedules for Construction Contracts. The schedules shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Legibility, clarity, and coherence are very important. Provide as specifically as possible the actual methodology you would use for accomplishing the requirements outlined in the seed project SOW. Address your solution for meeting or exceeding the Government's minimum performance or capability requirements in the SOW. All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.

2.4.4 Subfactor 4 – Organization and Key Personnel: Offerors are cautioned to read FAR Clause 52.219-14, Limitations on Subcontracting. The contracts resulting from this solicitation are not intended for management firms or construction firms who self-perform only administrative or management functions. Include an Organizational Chart listing company personnel and their roles for the areas of consideration required. Include a narrative describing personnel to include their names, duties, and level of responsibility for the following key personnel: Project Manager, Site Superintendent(s), Quality Control Manager and Safety Manager. State the lines of authority and duties such as overall project management, site superintendence, quality control, and safety.

Additionally, in accordance with Operation and Maintenance Instruction TO 35E1-2-13-1 Aircraft Training Facility, selected contractors will need to meet AFCEC/CXF certification and licensing qualifications to perform the repair work called for under this requirement. Those qualified agencies (manufacturing firms) are: Prosafe, Inc., Kidde Fire Trainers, Kirila Fire Training Facilities, WRG Training Systems, and Fire Blast 451. The main purpose of this project is to provide and install a new control tower and a MOCKUP with all the gas piping and connections in stainless steel. If offeror is not one of the above listed manufacturers, proof of being certified and licensed technicians for their systems or proof of subcontracting through an AFCEC/CXF approved vendor is required as part of the technical proposal.

2.5 Past Performance Questionnaire (PPQ): The Past Performance Questionnaire (Attachment 14) is a key method used by the Government to obtain past performance information and validate the Past Performance Fact Sheet. Each Past Performance Fact Sheet should have a corresponding PPQ. The offeror shall send out and track the completion of the PPQ with the POCs identified. The responsibility to send out and track the completion of the PPQs rests solely with the offeror. Offerors shall exert their best effort to ensure a PPQ is returned for each Past Performance Fact Sheet submitted. A completed PPQ must be submitted directly to the Government not later than the date and time established in the RFP for receipt of proposals. Completed PPQs submitted by the offeror will not be accepted nor evaluated.

POCs shall submit their completed PPQs electronically, via email, to:

viviane.filias@us.af.mil Sandy.guite@us.af.mil

Past Performance evaluation is not limited to review of the information provided in Volume II or PPQs received. The Government reserves the right to review all available past performance information in the integrated assessment.