Attachment 8 - Fugitive Dust Control Plan-Main Base R307-309 Plan Fugitive-Dust Current.pdf
PDF 2 MB Posted
- Attached to
- HAFB Storage Igloos Demolition
- Solicitation number
- 24-Q-0031
About this file
This document is a Fugitive Dust Control Plan for Hill Air Force Base (HAFB) Main Base, dated July 2020, developed in accordance with Utah Administrative Code R307-309 for controlling particulate emissions. The plan details dust control strategies for various activities including construction, demolition, landfill operations, open areas, paved and unpaved roads, and a sand and rock product storage area. Key management practices involve minimizing dust through methods such as:
The plan covers HAFB's 6,600-acre main base and Little Mountain Facility, which includes industrial operations like systems management, maintenance services, and weapon system support. Dust control strategies are comprehensive, focusing on stabilizing surface soils, limiting vehicle speeds, applying water or chemical suppressants, using tarps during material transport, controlling stockpile heights, and implementing trackout prevention techniques. The document provides specific best management practices for each potential dust-generating activity, with the primary goal of maintaining dust opacity below 10% at the property boundary and 20% on-site, in compliance with state regulations.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HILL AIR FORCE BASE
MAIN BASE
FUGITIVE DUST CONTROL PLAN
July 2020
Prepared by Cardno, Inc. Prepared for Hill Air Force Base
2363 North Hill Field Road 75 CEG/CEIEA
Suite 450 7290 Weiner Street
Layton, UT 84101 Hill Air Force Base, UT 84056
Hill AFB MB Fugitive Dust Control Plan – July 2020
TABLE OF CONTENTS
1 Introduction
2 Facility Description
3 Fugitive Dust Activities
3.1 Construction and Demolition Activities
3.2 Landfill
3.3 Open Areas
3.4 Paved Roads
3.5 Unpaved Roads
3.6 Sand and Rock Product Storage Area
4 Activity Duration
5 Fugitive Dust Controls on Site
5.1 Construction and Demolition Activities
5.1.1 Construction/Demolition Dust Controls Summary
5.1.2 Specific Construction/Demolition Dust Best Management Practices
5.2 Landfill
5.2.1 Landfill Dust Controls Summary
5.2.2 Specific Landfill Dust Best Management Practices
5.3 Open Areas
5.3.1 Open Areas Dust Controls Summary
5.3.2 Specific Open Areas Dust Best Management Practices
5.4 Paved Roads
5.4.1 Paved Roads Dust Controls Summary
5.4.2 Specific Paved Roads Dust Best Management Practices
5.5 Unpaved Roads
5.5.1 Unpaved Roads Dust Controls Summary
5.5.2 Specific Unpaved Roads Dust Best Management Practices
5.6 Sand and Rock Product Storage Area
5.6.1 Sand/Rock Products Storage Area Dust Controls Summary
5.6.2 Specific Sand/Rock Products Storage Area Dust Best Management Practices
6 Contact Information
Figure 1 – CH2M Hill Aerial Photograph, 2000
Figure 2 – Utah Automated Geographic Reference Center Aerial Photograph, 1999
2 FACILITY DESCRIPTION
Hill AFB Main Base is located in Davis and Weber Counties approximately 30 miles north of Salt Lake City and comprises approximately 6,600 acres including the Little Mountain Facility, a remote test facility located approximately 18 miles northwest of the Main Base. The Main Base provides worldwide logistics support for some of the Air Force and Defense Department's most sophisticated weapon systems. Support operations include systems management, spare parts, and major maintenance and modification services. Hill AFB has extensive industrial facilities for painting, paint stripping, plating, parts warehousing/distribution, and wastewater treatment. In addition, Hill AFB manages and maintains other systems such as conventional air munitions, solid propellants, landing gear, and training devices.
Operations at the Main Base (excluding the Little Mountain Facility) that have the potential to generate fugitive dust consist of temporary construction and demolition activities, operation of a 25‐acre landfill, cleared open areas, paved and unpaved roads, and operation of a sand and rock product storage area.
Operations, at the Little Mountain Facility with the potential to generate fugitive dust, consists of temporary construction and demolition activities, cleared open areas, as well as paved and unpaved roads. Details of fugitive dust activities are provided in Section 3, the duration of these activities is provided in Section 4, the controls used for these activities are provided in Section 5.
3 FUGITIVE DUST ACTIVITIES
This section describes the activities and operation of sources at Hill AFB Main Base (including the Little Mountain Facility) that could potentially result in the generation of fugitive dust. Figures 1 and 2, located at the end of this plan, provide maps of the Main Base and the Little Mountain Facility, respectively, for stationary sources of interest.
3.1 CONSTRUCTION AND DEMOLITION ACTIVITIES
Construction and demolition activities occur periodically throughout the Main Base. Fugitive dust associated with these activities includes: the handling and transfer of material, loading, hauling, and dumping of material, clearing and leveling of land, minor drilling and pushing operations, earth moving and excavation of land, development construction, road construction, and potential crushing of construction or demolition debris. Construction activities associated with fugitive dust also include the use of equipment such as bulldozers, cranes, loaders, dump trucks, compactors, compressors, excavators, and graders.
3.2 LANDFILL
Hill AFB operates and maintains a 25‐acre Class IVb Landfill located at the northern end of the Main Base. Fugitive dust associated with normal operation of the landfill includes storage, handling, and transfer of material, dumping of material, and application of soil caps. Operation of the landfill is limited to receipt of construction and demolition debris from operations conducted throughout the Main Base.
The landfill consists of three cells: (1) a 15‐acre concrete cell for disposal of concrete debris and excavated soils generated at Hill AFB, (2) a 7.5‐acre asphalt cell containing asphalt and excavated soils generated at Hill AFB that are stored for recycling (recycled asphalt is used as fill in construction projects and as aggregate on unpaved roads at Hill AFB), and (3) a 2.5‐acre wood cell that consists of operation of a wood grinding machine to chip used wood such as pallets, crates, and dead trees (chips are used as mulch in landscaping projects, as cover for side slopes in the concrete cell, and as cover in restoration projects around the base). The wood chipper operates an average of one day per month (Hill AFB, 1999).
3.3 OPEN AREAS
There are very few open areas at the Main Base greater than one‐quarter acre that are not already vegetated. The majority of these areas do not generate fugitive dust.
3.4 PAVED ROADS
Approximately 96% of the roads at the Main Base (including the Little Mountain Facility) have been paved to support operations and minimize generation of fugitive dust. Construction activities that occur periodically throughout each of these areas have the potential to deposit materials and generate minor amounts of fugitive dust.
3.5 UNPAVED ROADS
A small number of unpaved roads exist at the Main Base (including the Little Mountain Facility). Fugitive dust associated with vehicular traffic on unpaved roads is minor and includes blowing dust.
3.6 SAND AND ROCK PRODUCT STORAGE AREA
Hill AFB Main Base operates and maintains a small material storage area used to store miscellaneous piles of sand and rock products used for construction projects throughout the base. Fugitive dust associated with the sand and rock product piles includes blowing dust, handling and transfer of material, and the loading and dumping of material.
4 ACTIVITY DURATION
The length of Hill AFB fugitive dust activities is indefinite. The duration of construction and demolition projects will vary depending upon the nature and level of activity; however, most construction and demolition activities are limited to a six‐month period. Operation of the wood and asphalt cells of the landfill is also indefinite, as material is continually recycled. Operation and design of the concrete landfill limits disposal of material to 1 million cubic yards or 2 million tons of construction debris, however use of the concrete landfill is indefinite in duration. The use and maintenance of paved and unpaved roads, the use of cleared open areas (such as perimeter firebreaks), and the operation of the sand and rock product storage area are indefinite in duration. This plan has been designed to control fugitive dust at Hill AFB regardless of the activity duration.
5 FUGITIVE DUST CONTROLS ON SITE
This section describes the control strategies used at Hill AFB to control fugitive dust from sources identified in Section 4 of this document. The strategies employed at Hill AFB are designed to meet the on‐site 20% fugitive dust opacity limit and the 10% property boundary fugitive dust opacity limit of UAC R307‐309‐5. Per UAC R307‐309‐12, records demonstrating compliance with R307‐309 will be maintained for all dust‐generating sources subject to R307‐309‐5(2) and (3), and those records will be maintained on file for a period of 5 years.
CONTINGENCY DUST CONTROLS IF WIND > 25 MPH
The opacity requirement of UAC R307‐309‐5 will not be applicable during high wind events if Hill AFB complies with this fugitive dust control plan and administers at least one of the following dust control contingencies listed below when the wind speed exceeds 25 mph:
Pre‐event watering, or
Hourly watering, or
Cease or reduce fugitive dust producing operations.
5.1 CONSTRUCTION AND DEMOLITION ACTIVITIES
5.1.1 CONSTRUCTION/DEMOLITION DUST CONTROLS SUMMARY
UAC R307‐309‐8 stipulates that sources engaging in the clearing or leveling of land with an area of one‐ quarter acre or more, earthmoving, excavating, construction, demolition, or moving trucks or construction equipment over cleared land or access haul roads shall prevent, to the maximum extent possible, material from being deposited onto any paved road other than designated deposit sites. UAC R307‐309‐8 also requires that when material, which may create fugitive dust, is deposited on a paved road, the road shall be cleaned promptly.
5.1.2 SPECIFIC CONSTRUCTION/DEMOLITION DUST BEST MANAGEMENT
PRACTICES
5.1.2.1 BACKFILLING
Stabilize backfill material when not actively handling:
Water backfill material to maintain moisture or to form crust.
Stabilize backfill material during handling:
Empty loader bucket slowly and minimize drop height from loader bucket, or
Dedicate water truck or large hose to backfilling equipment and apply water as needed.
Stabilize soil at completion of backfilling activity:
Apply water and maintain disturbed soils in a stable condition.
Stabilize material while using pipe padder equipment:
Not Applicable.
5.1.2.2 CLEARING
Stabilize surface soils where support equipment and vehicles will operate:
Pre‐water and maintain surface soils in a stabilized condition.
Stabilize disturbed soil immediately after clearing and grubbing activities:
Water disturbed soils to form crust.
Stabilize slopes at completion of activity:
Apply water and maintain sloping surfaces/wind breaks in a crusted condition.
5.1.2.3 CLEARING FORMS, FOUNDATIONS and SLABS
Use sweeping, vacuum and water spray to clear forms, foundations and slabs.
5.1.2.4 CUT and FILL
Stabilize surface soils where support equipment and vehicles will operate:
Pre‐water and maintain surface soils in a stabilized condition.
Pre‐water soils:
Dig a test hole to depth of cut or equipment penetration to determine if soils are moist at depth.
Continue to pre‐water if not moist to depth of cut.
Stabilize soil during cut activities:
Apply water to depth of cut prior to subsequent cuts.
Stabilize soil after cut and fill activities:
Water disturbed soils to maintain moisture.
5.1.2.5 DEMOLITION – MECHANICAL/MANUAL
Stabilize surface areas where support equipment and vehicles will operate:
Pre‐water and maintain surface soils in a stabilized condition.
Stabilize demolition debris during handling:
Apply water.
Stabilize debris following demolition:
Apply water.
Stabilize surrounding area following demolition:
Apply water.
5.1.2.6 CRUSHING
Stabilize surface areas where support equipment and vehicles will operate:
Pre‐water and maintain surface soils in a stabilized condition.
Stabilize material before crushing:
Pre‐water material.
Stabilize material during crushing:
Monitor Opacity. Make adjustments to maintain compliance with opacity standards and permit conditions.
Stabilize material after crushing:
Minimize height of stockpile.
Traffic:
Reduce truck speed.
Transfer Height:
Minimize transfer and drop point height.
5.1.2.7 DISTURBED SOIL
Limit disturbance of soils where possible:
Limit disturbance of soils with the use of fencing, barriers, barricades, and/or wind barriers, or
Limit vehicle mileage and reduce speed.
Stabilize and maintain stability of all disturbed soil throughout construction site:
Apply water to stabilize disturbed soils. Soil moisture must be maintained such that soils can be worked without generating fugitive dust.
5.1.2.8 DISTURBED LAND LONG‐TERM STABILIZATION OVER 30 DAYS
Prevent access to limit soil disturbance:
Prevent access by fencing, ditches, vegetation, berms or other suitable barrier.
Stabilize soil:
Stabilize disturbed soil with vegetation, or
Apply water and maintain soil moisture sufficient to avoid generating fugitive dust.
5.1.2.9 HAULING MATERIALS
Limit visible dust opacity from vehicular operations:
Apply and maintain water/chemical suppressant to operational areas and haul routes, or
Limit vehicle mileage and speed.
Stabilize materials during transport on site:
Use tarps or other suitable enclosures on haul trucks, or
Apply water prior to transport.
Clean wheels and undercarriage of haul trucks prior to leaving construction site:
Sweep or water haul road.
5.1.2.10 PAVING/SUBGRADE PREPARATION
Stabilize adjacent disturbed soils following paving activities:
Apply and maintain water on disturbed soils, or
Stabilize disturbed soils with vegetation or hydroseeding.
5.1.2.11 SAWING/CUTTING MATERIALS
Limit visible emissions:
Use water to control dust.
5.1.2.12 STAGING AREAS
Limit visible dust opacity from vehicular operations:
Limit vehicle mileage and speed.
Stabilize staging area soils during use:
Pre‐water and maintain surface soils in a stabilized condition.
Stabilize staging area soils at project completion:
Completed project will cover staging area with building, paving and/or landscaping, or
Apply water to form adequate crust and prevent access.
5.1.2.13 STOCKPILING
Stabilize surface soils where support equipment and vehicles will operate:
Pre‐water and maintain surface soils in a stabilized condition.
Stabilize stockpile materials during handling:
Remove material from the downwind side of the stockpile, when safe to do so, or
Reduce pile height.
Stabilize stockpiles after handling:
Avoid steep sides to prevent material sloughing, or
Reduce height.
5.1.2.14 TRACKOUT PREVENTION and CLEANUP
Prevent dust from trackout:
Maintain dust control during working hours and clean trackout from paved surfaces at the end of the work shift/day.
All exiting traffic must be routed over selected trackout control device(s):
Clearly establish and enforce traffic patterns to route traffic over selected trackout control device(s).
5.1.2.15 TRAFFIC UNPAVED ROUTES and PARKING AREAS
Stabilize surface soils where support equipment and vehicles will operate:
Limit vehicle mileage and speeds, or
Apply and maintain water on surface soils.
5.1.2.16 TRENCHING
Presoak soils prior to trenching activities:
Pre‐water surface.
Stabilize surface soils where trenching equipment, support equipment and vehicles will operate:
Pre‐water and maintain surface soils in a stabilized condition, or
Limit mileage and speed.
Stabilize soils after trenching:
Apply and maintain water on excavated soil.
5.1.2.17 TRUCK LOADING
Pre‐water and maintain surface soils in a stabilized condition where loaders, support equipment and vehicles will operate, or
Empty loader bucket slowly and keep loader bucket close to the truck to minimize the drop height while dumping.
5.2 LANDFILL
5.2.1 LANDFILL DUST CONTROLS SUMMARY
UAC R307‐309‐7 stipulates that sources owning, operating or maintaining a new or existing material storage, handling or hauling operation shall prevent, to the maximum extent possible, material from being deposited onto any paved road other than designated deposit sites.
5.2.2 SPECIFIC LANDFILL DUST BEST MANAGEMENT PRACTICES
5.2.2.1 BACKFILLING
Stabilize backfill material when not actively handling:
Water backfill material to maintain moisture or to form crust.
Stabilize backfill material during handling:
Empty loader bucket slowly and minimize drop height from loader bucket.
Stabilize soil at completion of backfilling activity:
Apply water and maintain disturbed soils in a stable condition.
Stabilize material while using pipe padder equipment:
Not Applicable.
5.2.2.2 DISTURBED SOIL
Limit disturbance of soils where possible:
Limit disturbance of soils with the use of fencing, barriers, barricades, and/or wind barriers, or
Limit vehicle mileage and reduce speed.
Stabilize and maintain stability of all disturbed soil throughout construction site:
Apply water to stabilize disturbed soils. Soil moisture must be maintained such that soils can be worked without generating fugitive dust, or
Use wind breaks, or
Apply cover (natural or synthetic).
5.2.2.3 DISTURBED LAND LONG‐TERM STABILIZATION OVER 30 DAYS
Prevent access to limit soil disturbance:
Prevent access by fencing, ditches, vegetation, berms or other suitable barrier.
Stabilize soil:
Stabilize disturbed soil with vegetation, or
Apply water and maintain soil moisture sufficient to avoid generating fugitive dust.
5.2.2.4 HAULING MATERIALS
Limit visible dust opacity from vehicular operations:
Apply and maintain water/chemical suppressant to operational areas and haul routes, or
Limit vehicle mileage and speed.
Stabilize materials during transport on site:
Apply water prior to transport, or
Use tarps or other suitable enclosures on haul trucks.
Clean wheels and undercarriage of haul trucks prior to leaving construction site:
Sweep or water haul road.
5.2.2.5 SAWING/CUTTING MATERIALS
Limit visible emissions:
Use water to control dust.
5.2.2.6 STOCKPILING
Stabilize surface soils where support equipment and vehicles will operate:
Pre‐water and maintain surface soils in a stabilized condition.
Stabilize stockpile materials during handling:
Remove material from the downwind side of the stockpile, when safe to do so, or
Reduce pile height.
Stabilize stockpiles after handling:
Avoid steep sides to prevent material sloughing.
5.2.2.7 TRACKOUT PREVENTION and CLEANUP
Prevent dust from trackout:
Maintain dust control during working hours and clean trackout from paved surfaces at the end of the work shift/day.
All exiting traffic must be routed over selected trackout control device(s):
Clearly establish and enforce traffic patterns to route traffic over selected trackout control device(s).
5.2.2.8 TRAFFIC UNPAVED ROUTES and PARKING AREAS
Stabilize surface soils where support equipment and vehicles will operate:
Limit vehicle mileage and speeds, or
Apply and maintain water on surface soils, or
Apply and maintain gravel on surface soils, or
Apply recycled asphalt to surface soils.
5.2.2.9 TRUCK LOADING
Pre‐water and maintain surface soils in a stabilized condition where loaders, support equipment and vehicles will operate, or
Empty loader bucket slowly and keep loader bucket close to the truck to minimize the drop height while dumping.
5.3 OPEN AREAS
5.3.1 OPEN AREAS DUST CONTROLS SUMMARY
Open areas, such as cleared operational areas or those areas cleared in conjunction with construction activities are monitored to limit the fugitive dust generated from non‐vegetated areas to acceptable dust opacity levels.
5.3.2 SPECIFIC OPEN AREAS DUST BEST MANAGEMENT PRACTICES
5.3.2.1 DISTURBED SOIL (construction, landfill, open areas)
Limit disturbance of soils where possible:
Limit disturbance of soils with the use of fencing, barriers, barricades, and/or wind barriers, or
Limit vehicle mileage and reduce speed.
Stabilize and maintain stability of all disturbed soil throughout construction site:
Apply water to stabilize disturbed soils. Soil moisture must be maintained such that soils can be worked without generating fugitive dust, or
Apply cover (natural or synthetic). (Landfill only)
5.3.2.2 DISTURBED LAND LONG‐TERM STABILIZATION OVER 30 DAYS
(construction, landfill, open areas)
Prevent access to limit soil disturbance:
Prevent access by fencing, ditches, vegetation, berms or other suitable barrier.
Stabilize soil:
Stabilize disturbed soil with vegetation, or
Apply water and maintain soil moisture sufficient to avoid generating fugitive dust.
5.4 PAVED ROADS
5.4.1 PAVED ROADS DUST CONTROLS SUMMARY
There are several management practices currently employed by Hill AFB to minimize, to the maximum extent possible, fugitive dust resulting from activities on paved roads IAW UAC R307‐309‐9 and UAC R307‐307 as described in the best management practices below.
5.4.2 SPECIFIC PAVED ROADS DUST BEST MANAGEMENT PRACTICES
5.4.2.1 HAULING MATERIALS
Stabilize materials during transport on site:
Apply water prior to transport, or
Use tarps or other suitable enclosures on haul trucks.
Clean wheels and undercarriage of haul trucks prior to leaving construction site:
Sweep or water haul road.
5.5 UNPAVED ROADS
5.5.1 UNPAVED ROADS DUST CONTROLS SUMMARY
Unpaved roads at Hill AFB have very low average daily traffic volumes, which significantly helps reduce fugitive dust. Hill AFB will also implement the best management practices described in the following sections.
5.5.2 SPECIFIC UNPAVED ROADS DUST BEST MANAGEMENT PRACTICES
5.5.2.1 TRAFFIC UNPAVED ROUTES and PARKING AREAS
Stabilize surface soils where support equipment and vehicles will operate:
Limit vehicle mileage and speeds, or
Apply and maintain water on surface soils.
5.5.2.2 HAULING MATERIALS
Limit visible dust opacity from vehicular operations:
Apply and maintain water/chemical suppressant to operational areas and haul routes, or
Limit vehicle mileage and speed.
Stabilize materials during transport on site:
Apply water prior to transport, or
Use tarps or other suitable enclosures on haul trucks.
Clean wheels and undercarriage of haul trucks prior to leaving construction site:
Sweep or water haul road.
5.6 SAND AND ROCK PRODUCT STORAGE AREA
5.6.1 SAND/ROCK PRODUCTS STORAGE AREA DUST CONTROLS SUMMARY
UAC R307‐309‐7 stipulates that sources owning, operating, or maintaining a new or existing material storage, handling, or hauling operation shall prevent material, to the maximum extent possible, from being deposited onto any paved road. Fugitive dust associated with the storage, hauling and handling of materials from the sand and rock product storage area is minimized through the use of best management practices.
5.6.2 SPECIFIC SAND/ROCK PRODUCTS STORAGE AREA DUST BEST
MANAGEMENT PRACTICES
5.6.2.1 STOCKPILING
Stabilize surface soils where support equipment and vehicles will operate:
Pre‐water and maintain surface soils in a stabilized condition.
Stabilize stockpile materials during handling:
Reduce height.
Stabilize stockpiles after handling:
Avoid steep sides to prevent material sloughing, or
Reduce pile height.
5.6.2.2 HAULING MATERIALS
Limit visible dust opacity from vehicular operations:
Apply and maintain water/chemical suppressant to operational areas and haul routes, or
Limit vehicle mileage and speed.
Stabilize materials during transport on site:
Apply water prior to transport, or
Use tarps or other suitable enclosures on haul trucks.
Clean wheels and undercarriage of haul trucks prior to leaving construction site:
Sweep or water haul road.
6 CONTACT INFORMATION
Name of Facility Hill Air Force Base, Main Base
Mailing Address Michelle L. Cottle Hill Air Force Base, Main Base
75 CEG/CEIE
7290 Weiner Street Hill Air Force Base, UT 84056‐5003
Universal Transverse Mercator (UTM) Coordinates 416,588 m Easting 4,553,000 m Northing UTM Zone 12
Point of Contact for Fugitive Dust Issues Name: Erik Dettenmaier Organization: 75 CEG/CEIEA Phone: 801‐777‐0888
Onsite Supervisor for Fugitive Dust Issues Name: David R. Friz Organization: 75 CEG/CLEA Desk Phone: 801‐ 777‐4924
HAFB MB Fugitive Dust Control Plan – July 2020
Figure 1 – CH2M Hill Aerial Photograph, 2000
Figure 2 – Utah Automated Geographic Reference Center Aerial Photograph, 1999