Attachment 1 - Civil Demo Drawings.Haul Route.pdf
PDF 3 MB Posted
- Attached to
- HAFB Storage Igloos Demolition
- Solicitation number
- 24-Q-0031
About this file
This document contains civil demolition drawings and a construction haul route for the demolition of two Munitions Storage Magazines (Buildings 1411 and 1432) at Hill Air Force Base in Utah. The drawings, prepared by the U.S. Army Corps of Engineers Sacramento District, provide detailed demolition plans showing the buildings to be demolished, existing utilities, and site conditions. Key specifications include:
The demolition plan for each building indicates the removal of the structure, existing pavement, and underground electrical infrastructure from the igloo to the transformer. The documents specify that contractors must protect in-place existing water mains, trees, and other utilities not designated for removal. The haul route and staging area drawing shows an approximate 1-acre staging area, designated access gates, and the project site route. Notes emphasize contractor responsibilities for temporary drainage, grading, erosion control, site stabilization, and restoration of the site to original conditions upon project completion.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1: Civil Demolition Drawings/ Construction Haul Route
ENGINE
C O
TT
O
N W
O O
D S
T.
ROY GATE
SO
U
TH
G
ATE R
D
SOUTH GATE
PROJECT SITE HAUL ROUTE
GEORGIA ST
APPROXIMATE STAGING AREA (1 AC)
ALABAMA ST
SE
R
VI
C
E
M
AP
LE
BEECHNUT
NOTES:
1. CONTRACTOR ACCESS WILL BE THROUGH DESIGNATED GATE AS SHOWN
ON PLANS.
2. LOCATION OF THE CONTRACTOR STAGING AREAS SHOWN is
APPROXIMATE. THE EXACT LOCATIONS WILL BE DETERMINED IN THE
FIELD BY THE CONTRACTING OFFICER.
3. NO BLADES OR BUCKETS SHALL BE ALLOWED TO CONTACT EXISTING
PAVEMENTS THAT ARE TO REMAIN. ONLY POWER SWEEPERS SHALL BE
ALLOWED TO REMOVE DEBRIS FORM THE SURFACE OF PAVEMENTS TO
REMAIN.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DRAINAGE,
GRADING, EROSION CONTROL, STABILIZATION, AND UTILITY
CONNECTIONS IN STAGING AREAS AND SHALL RESTORE SITE TO
ORIGINAL CONDITIONS UPON COMPLETION.
5. ALL CONSTRUCTION AREAS SHALL BE CONSIDERED LAND DISTURBANCE
AREAS.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
D R
AF
T
SU
BM
IT
TA
L
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H B1
AN
D
IG
LO
O
D
EM
O
LI
TI
O
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
A
PR
AN
SI
D
S.
M
IT
C
H
EL
L
S.
M
IT
C
H
EL
L
L.
N
EM
ET
Z
S.
M
IT
C
H
EL
L
G-001
H
AU
L R
O U
TE
A
N D
S
TA
G
IN
G A
R
EA
DEMOLISH BUILDING 1411
DEMOLISH
EXISTING
PAVEMENT
PROTECT TREES
IN-PLACE
W W W W W W W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWWWWWWW
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
E E E E E E E E
E E E E E E E E E E E E E E E E E E
E E
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
DEMOLISH EXISTING UNDERGROUND
ELECTRIC FROM IGLOO TO TRANSFORMER
PROTECT IN PLACE
NOTES:
1. SEE PERFORMANCE WORK STATEMENT (PWS) FOR
DEMOLITION DETAILS..
2. SEE BUILDING DESCRIPTION(S), PWS 3.0 DETAILED
DESCRIPTION OF SERVICES.
3. UTILITY LOCATIONS ARE APPROXIMATE.
CONTRACTOR WILL FIELD VERIFY LOCATIONS PRIOR
TO DEMOLITION.
4. PROTECT IN PLACE ALL EXISTING UTILITIES UNLESS
OTHERWISE NOTED.
BUILDING 1411 DEMOLITION PLAN
1"=30'
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
D R
AF
T
SU
BM
IT
TA
L
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H B1
AN
D
IG
LO
O
D
EM
O
LI
TI
O
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
A
PR
AN
SI
D
S.
M
IT
C
H
EL
L
S.
M
IT
C
H
EL
L
L.
N
EM
ET
Z
S.
M
IT
C
H
EL
L
CD101
BU
IL
D
IN
G
D
EM
O
LI
TI
O
N P
LA
N
W W
E E
LEGEND
EXISTING WATER MAIN
EXISTING PRIMARY UNDERGROUND ELECTRIC
EXISTING SECONDARY UNDERGROUND ELECTRIC
EXISTING PAD MOUNTED TRANSFORMER
ES ES
DEMOLISH BUILDING 1411
DEMOLISH EXISTING
PAVEMENT
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
E E
E E
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
DEMOLISH EXISTING UNDERGROUND
ELECTRIC FROM IGLOO TO TRANSFORMER
NOTES:
1. SEE PERFORMANCE WORK STATEMENT (PWS) FOR
DEMOLITION DETAILS.
2. SEE BUILDING DESCRIPTION(S), PWS 3.0 DETAILED
DESCRIPTION OF SERVICES.
3. UTILITY LOCATIONS ARE APPROXIMATE.
CONTRACTOR WILL FIELD VERIFY LOCATIONS PRIOR
TO DEMOLITION.
4. PROTECT IN PLACE ALL EXISTING UTILITIES UNLESS
OTHERWISE NOTED.
BUILDING 1432 DEMOLITION PLAN
1"=30'
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SP
EC
N O
D
ES
IG
N
F
IL
E N
O
D R
AF
T
SU
BM
IT
TA
L
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H B1
AN
D
IG
LO
O
D
EM
O
LI
TI
O
N
J
S
TR
EE
T
SA
C
R
AM
EN
TO
, C A
SA
C
R
AM
EN
TO
D
IS
TR
IC
T
A
PR
AN
SI
D
S.
M
IT
C
H
EL
L
S.
M
IT
C
H
EL
L
L.
N
EM
ET
Z
S.
M
IT
C
H
EL
L
CD102
BU
IL
D
IN
G
D
EM
O
LI
TI
O
N P
LA
N
W W
E E
LEGEND
EXISTING WATER MAIN
EXISTING PRIMARY UNDERGROUND ELECTRIC
EXISTING SECONDARY UNDERGROUND ELECTRIC
EXISTING PAD MOUNTED TRANSFORMER
ES ES
File details come from the government source that posted it. Updated .