Attachment 10 - Hill AFB Abatement Contractor Requirements 2023.pdf

PDF 153 KB Posted

Attached to
HAFB Storage Igloos Demolition
Solicitation number
24-Q-0031
Issued by

About this file

This document is an Appendix outlining Asbestos and Lead-Based Paint (LBP) Abatement Contractor Qualification Requirements for the 75th Air Base Wing at Hill Air Force Base. The document details comprehensive regulatory and submission requirements for contractors seeking to perform asbestos and lead abatement work, including mandatory compliance with federal and state regulations such as CFR standards, OSHA guidelines, and Utah Asbestos Rules.

Key submission requirements include providing detailed documentation on employee medical qualifications, respiratory protection programs, air sampling protocols, equipment lists, industrial hygienist credentials, employee training certifications, and proof of prior work experience. Contractors must demonstrate at least one year of UDAQ-certified work experience, maintain current certifications for all workers, provide comprehensive insurance coverage of up to $1,000,000, and submit extensive documentation about past projects, legal proceedings, and regulatory compliance. The prequalification package must be emailed to 75CES.CEOHA.AbatementShop@us.af.mil and subsequently mailed to the specified Air Force address, with requalification required every two years.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

HEADQUARTERS 75TH AIR BASE WING

Hill Air Force Base, Utah 84056-5206

April 2023

APPENDIX A: ASBESTOS / LEAD BASED PAINT (LBP) ABATEMENT CONTRACTOR

QUALIFICATION REQUIREMENTS

PART 1: REGULATORY COMPLIANCE

The contractor must comply with all applicable provisions of the following:

1.1 40 Code of Federal Regulations (CFR) 61 Subpart M (All notifications will be made to

UDAQ

1.2 29 CFR 19190.1001 (Asbestos) 29 CFR 1910.1025 (Lead)

1.3 Air Force Occupational Safety and Health AFOSH Standard 48-8

1.4 29 CFR 1926.1101 (Asbestos) 29 CFR 1926.62 (Lead)

1.5 Utah Asbestos Rule R307-801

PART 2: SUBMITTAL REQUIREMENTS

The following information must be submitted for prequalification in sequential order:

2.1 List of employees by date of last exams, who are medically qualified to work with asbestos (29 CFR 1926.1101). Include examiner’s name, signature, medical qualifications and place of employment. At least 50% of the employees must be current at time of submittal. 100% of employees must show current medical qualification documents at the beginning of each abatement job.

2.2 Contractor’s respiratory protection program (29 CFR 1926.1101, EPA Publication 560/5-85- 024).

2.3 Air sampling protocol used to support sampling requirement found in 29 CFR 1926.1101, 29

CFR 1926.62.

2.4 List of equipment to be used for asbestos/LBP work under this contract. Examples of equipment include negative air machines (with maintenance logs / High Efficiency Particulate Air [HEPA] filter documentation), scaffolding, decontamination facilities, disposable clothing, air pressure differential measuring devices (with proof of annual calibration), HEPA vacuums, etc., and copy of manufacturer certification of HEPA filter for vacuum (EPA Publication 560-5-85-024).

2.5 List of National Institute for Occupational Safety and Health (NIOSH)-approved respirators to be used on site by employees. Include NIOSH approval numbers and proof of approval (29 CFR 1926.1101, 29 CFR 1926.62, EPA Publication 560/5-85-024).

2.6 Qualifications of the Independent, Third-Party Industrial Hygienist (IH) who will oversee the project to include certification date, college, degrees, years of experience, and any other qualifications to perform this work. It is required that the IH overseeing the project be an American Board of Industrial Hygiene-Certified Industrial Hygienist or college graduate with at least four years of work-related experience. The third-party on-site monitor must have current UDAQ Contractor/Supervisor Certification. If more than one IH consultant is used, list those who may oversee the asbestos/LBP work.

2.7 List of employees fit-tested for respirator use in accordance with 29 CFR 1926.1101, 29 CFR

1926.62. List the employees by date and respirator. Include proof of employee fit testing and the name and qualifications of the fit tester. At least 50% of the employees must be

Hill Air Force Base, Utah 84056-5206 current (i.e., WITHIN SIX MONTHS) at the time of submittal. 100% of employees must show current fit test documents at the beginning of each abatement job.

2.8 Asbestos – Proof of at least one year minimum work experience as a UDAQ-certified asbestos abatement company, work shall have taken place within the last 12 months. Provide a current list of employees who have received training in accordance with 29 CFR 1926.1101 and EPA Publication 560/5-85-024. Proof of UDAQ certification is required for all asbestos work categories. Include proof of training (i.e., written certification of completion) from a nationally recognized EPA asbestos training course for each employee. At least 100% of the employees submitted as having received training must be currently certified at the time of submittal. All workers, contractor/supervisors, project designers must show current UDAQ certification documents before the beginning of each abatement job.

2.9 Lead – Proof of at least one year minimum work experience in Utah as a UDAQ certified lead abatement company. Provide proof of employee training in accordance with 29 CFR

1926.62 (i.e., written certification of completion) from an EPA approved course for each employee. All workers, contractor/supervisors must show current UDAQ certification documents before the beginning of each abatement job.

2.10 Copies of air monitoring data taken during and after abatement from previous projects completed by contractor (not to exceed five projects) (29 CFR 1926.1101, EPA Publication 560/5-85-024).

2.11 List of prior asbestos abatement contracts performed during the past two years. Include the names, addresses, telephone numbers and dates the projects were performed (EPA Publication 560/5-85-024).

2.12 Additional information to adequately show compliance with applicable laws and regulations in the following areas:

o Medical certification o NIOSH Analytical Lab Certification (independent lab) o Disposal of waste o Department of Transportation transport of asbestos waste o Cleanup procedures

2.13 List of any asbestos/LBP abatement projects that have been prematurely terminated including those of any corporation, Limited Liability Company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent. Include the circumstances surround the termination (EPA Publication 560/5-85-024).

2.14 List of any contractual penalties within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent, whom the contractor has paid for breach or noncompliance with contract specifications (EPA Publication 560/5-85-024).

2.15 List any enforcement action levied by any Federal, State or local government agencies against the contractor for violations related to asbestos within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent. The citations will be identified by contractor including the name

Hill Air Force Base, Utah 84056-5206 and location of the project, the date(s) and how the allegations were resolved (EPA Publication 560/5-85-024).

2.16 Description of all legal proceedings, lawsuits or claims which have been filed or levied against the contractor or any of their past or present employees for asbestos related activities within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent (EPA Publication 560/5-85- 024).

PART 3: INSURANCE

3.1 The contractor will provide proof of insurance to work with asbestos-containing materials.

Insurance must be occurrence type and provide up to $1,000,000.00 in coverage.

ALL INFORMATION SUBMITTED IS SUBJECT TO CONFIRMATION BY GOVERNMENT

PERSONNEL. ANY INFORMATION FOUND TO BE FALSE WILL BE GROUNDS FOR

IMMEDIATE DISQUALIFICATION OF CONTRACTOR.

UPDATE/REQUALIFICATION OF ALL QUALIFIED CONTRACTORS IS REQUIRED EVERY

TWO YEARS WITH THE EXCEPTION OF IDIQ CONTRACTORS WHICH SHALL BE

QUALIFIED FOR THE DURATION OF THE CONTRACT. (The update will require that all qualified contractors show proof of compliance with the sections listed above.)

THE GOVERNMENT RESERVES THE RIGHT TO DISQUALIFY ANY ABATEMENT

CONTRACTOR FOR INTENTIONALLY REMOVING ASBESTOS/LBP MATERIALS IN

VIOLATION OF APPLICABLE REGULATIONS.

ABATEMENT CONTRACTORS ARE REQUIRED TO COORDINATE ALL ABATEMENT WORK

/ PROJECT DOCUMENTATION THROUGH THE 75 CES/CEOHA ABATEMENT SHOP.

(Issue date: 12 June 1997; updated 26 June 2023)

PLEASE EMAIL PREQUALIFICATION PACKAGE TO:

75CES.CEOHA.AbatementShop@us.af.mil

THEN PROCEED TO MAIL THE HARDCOPY PREQUALIFICATION PACKAGE TO:

DEPARTMENT OF THE AIR FORCE

75 CES/CEOHA

5713 Lahm Ln., Bldg. 593 S.

HILL AIR FORCE BASE, UT 84056-5300

ATTN: Abatement Shop Supervisor; telephone 801-586-7094

File details come from the government source that posted it. Updated .